Overview
Provident Capella 1
Overview
Provident Capella 1
Overview
Provident Capella 1
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 13 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 13 pages, English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/1181/2018 · building height 39.65 m (Tower 1, Tower 6), 39.5 m (Tower 7) | Clear |
| Environmental clearance | SEIAA 127 CON 2018 · issued 19 Jan 2019 | Clear |
| Airport height NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Escrow bank | ICICI Bank · M G Road |
|---|
Data room
48 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Provident Housing's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Provident Capella 1 in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 20,288 sq m | |
|---|---|---|
| Title deed | Sy 269, Samethanahalli village, Anugondanahalli hobli · 3-00 Acres |
| Joint development agreement number | 566 of Book 1, 2018-19 |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 14 Sep 2024 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sowparnika Rhythm of Rain, price locked; Sowparnika Ashiyana Phase II, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked.
| Sowparnika Rhythm of Rain | 590 m | Locked | |
|---|---|---|---|
| Sowparnika Ashiyana Phase II | 680 m | Locked | |
| Kumari Nautilus | about 1 km | Locked | |
| Vintage Valley | about 3 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 3.7 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 3.7 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 4.1 km | Locked | |
| Sowparnika Euphoria in the East | 4.1 km | Locked | |
| Nirmaanika Aria | about 4.5 km | Locked | |
| Assetz 66 & Shibui | about 5.5 km | Locked | |
| Godrej Splendour | 6.0 km | Locked | |
| Axis Ekatva | about 6 km | Locked |
| Provident Capella 1 This project | This project is the point the others are measured from | 14 Sep 2024 | – | Not verified yet |
|---|---|---|---|---|
| Sowparnika Rhythm of Rain | 590 m | 15 Jan 2032 | 97% (703 of 725) | Locked |
| Sowparnika Ashiyana Phase II | 680 m | 31 Dec 2025 | 99% (419 of 422) | Locked |
| Kumari Nautilus | about 1 km | 12 Jan 2028 | 69% (114 of 165) | Locked |
| Vintage Valley | about 3 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 3.7 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 3.7 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
| Rent, 3BHK, 3 km | ₹41,600 /mo · 5 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹22,000 /mo · 5 listings | |
| Rent per sq ft, 3 km | ₹32.1 /mo, as listed · 8 listings with a size |
| Projects within 4 km, counted | 27 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 6,822 | |
| Booked | 3,075 of 6,822 (45%) | |
| Unsold | 3,747 | |
| Booked a month, pooled | 76 flats | |
| Months to sell, pooled | 37 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest government-flagged flood location | 3.9 km, SIDDHARTHA LAYOUT KADUGODI |
|---|
| Nearest storm drain | 1.9 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 280 m to the south-east, an unnamed tank |
| Schedule end | 14 Dec 2023 | |
|---|---|---|
| RERA completion date | 14 Sep 2024 | Red flag |
| Work began, as filed | 14 Jun 2019 |
| Building heights, fire NOC | 39.65 m (Tower 1, Tower 6), 39.5 m (Tower 7) on the fire NOC |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/1181/2018 · building height 39.65 m (Tower 1, Tower 6), 39.5 m (Tower 7) | |
|---|---|---|
| Environmental clearance | SEIAA 127 CON 2018 · issued 19 Jan 2019 |
| Estimated cost, at registration | ₹177.90 Cr |
|---|
| Escrow bank | ICICI Bank · M G Road |
|---|
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 5 | Review |
| Other phases under this promoter name | 7 | |
| With a filed extension or completion | 3 (0 completed, 3 extended) | |
| Average schedule slip | 25 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 4.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.9 km to the west, tertiary drain | |
|---|---|---|
| Ground level | 873 m above sea level, plus or minus 4 m | |
| Metro, operational | 4.5 km, Whitefield | |
| Metro, under construction | 10.8 km, ISRO |
| Kempegowda Airport | 43.5 | 41 | 25.2 |
| MG Road (CBD) | 25.8 | 30 | 21.5 |
| Manyata Tech Park | 25.3 | 32 | 20.3 |
| ITPL, Whitefield | 7.8 | 10 | 6.7 |
| Ecospace, Bellandur ORR | 18.3 | 23 | 14.7 |
| Electronic City Ph 1 | 32.1 | 38 | 21.3 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.4 km to the west, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.4 km to the east |