Approvals
| Building plan (BBMP) | Sanctioned 31 Mar 2023 · No. PRJ/9516/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
85 · avg 81 m² 100%
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹32.37 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹32.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹32.37 Cr, same as the filing |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 31 Mar 2023 | |
| Escrow bank | HDFC · BSK 2ND STAGE |
Data room
151 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Nice place with great layout in a wonderfully peaceful and quiet location.
Nice place. The atmosphere in the area is calming with a good amount of greenery outside. The area has good connectivity with the yellow line metro is just within 3 km from this apartment.
Nice place and peaceful environment. Away from noise
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd | Apartment | 377 sqft carpet (as filed) | Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 67 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ragam Melodies in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC | Filed with the registration |
|---|
| Environmental clearance | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 29 Oct 2022 |
|---|
| RERA extensions | Applied for · Applied 8 Jan 2025 | |
|---|---|---|
| RERA completion date | 30 Mar 2025 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 115/1 & 116/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 85 | 85 | 871 |
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Canvas & Cove 2.0 - Block A, price locked; K&T's Sai Sannidhi, price locked; Mahindra NewHaven, price locked; Mahindra Zen, price locked; Azur Tower D, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Lodha Azur, price locked.
| Ragam Melodies This project | This project is the point the others are measured from | 30 Mar 2025 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Canvas & Cove 2.0 - Block A | 540 m | 30 Apr 2029 | 98% (238 of 244) | Locked |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 0.5 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | BMICAPA planning area (NICE corridor), at the filed pin | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 130 m from the filed location | Clear |
| Nearest government-flagged flood location | 580 m, SUBASH NAGARA | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 180 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the north, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.80 (68 covered spaces for 85 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 30 Mar 2025 | |
|---|---|---|
| Schedule end | 30 Mar 2025 | |
| RERA completion date | 30 Mar 2025 | Red flag |
| Work began, as filed | 31 Mar 2023 |
| Building heights, fire NOC | 14.85 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 60 sq m |
|---|
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect's certificate, registration | Site inspected 10 Apr 2023 | |
| Chartered accountant's certificate, registration | Dated 9 May 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | HDFC · BSK 2ND STAGE |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 940 m |
| Locked |
| Mahindra Zen | 1.2 km | Locked |
|---|
| Azur Phase 2 | about 1.5 km | Locked |
|---|
| Dhiraan Lotus | about 2.5 km | Locked |
|---|
| Azur Tower D | 3.1 km | Locked |
|---|
| Abhee Riviera Royale | about 3.5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | 3.4 km | Locked |
|---|
| Lodha Azur | 3.8 km | Locked |
|---|
| Ramky One Karnival | 4.9 km | Locked |
|---|
| K&T's Sai Sannidhi | 690 m | 31 Dec 2025 | 68% (27 of 40) | Locked |
|---|
| Mahindra NewHaven | 940 m | 28 Dec 2029 | 89% (106 of 119) | Locked |
|---|
| Mahindra Zen | 1.2 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|
| Azur Phase 2 | about 1.5 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹47,000 /mo · 59 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹29,000 /mo · 121 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 51 listings | |
| Rent per sq ft, 3 km | ₹28.6 /mo, as listed · 126 listings with a size |
| Projects within 4 km, counted | 43 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 12,017 | |
| Booked | 6,902 of 12,017 (57%) | |
| Unsold | 5,115 | |
| Booked a month, pooled | 141 flats | |
| Months to sell, pooled | 35 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 190 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 180 m to the north-west, tertiary drain | |
|---|---|---|
| Ground level | 904 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.8 km, Hosa Road | |
| Metro, under construction | 4.7 km, Kalena Agrahara |
| Kempegowda Airport | 48.9 | 55 | 37.8 |
| MG Road (CBD) | 14.6 | 23 | 12.8 |
| Manyata Tech Park | 25.2 | 33 | 20.0 |
| ITPL, Whitefield | 25.9 | 34 | 17.2 |
| Ecospace, Bellandur ORR | 13.4 | 21 | 8.2 |
| Electronic City Ph 1 | 8.9 | 13 | 5.3 |
| Landfill or waste transfer station | 1.6 km to the south-east | |
|---|---|---|
| Sewage treatment plant | 2.0 km to the north, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 1.0 km to the south-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.8 km to the north-west |