Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Advaitha AkshaCompleted · OC 10-03-2022 | Advaitha ventures Pvt Ltd | Apartment | 1,567 sqft carpet (as filed) | Completed |
| Arihant VilayaLapsed · completion date passed | ARIHANT FOUNDATIONS AND HOUSING LIMITED | Apartment | – | Dec 2023 |
| Aydin Infra Signature 3Active · 85% built | AYDIN INFRA | Apartment | 1,167–1,832 sqft carpet (as filed) | Aug 2027 |
| BelakuLapsed · completion date passed | Millennial Luxury Estates Private Limited | Apartment | 2,284–2,621 sqft carpet (as filed) | Mar 2026 |
| BelvoirRegistered · no quarterly update yet | KINGLIFE INFRA PRIVATE LIMITED | Apartment | – | Dec 2031 |
| Gp AdityaCompleted · OC 16-01-2024 | VIJAYA LAKSHMI CONSTRUCTIONS | Apartment | 891 sqft carpet (as filed) | Completed |
| Green FontanaLapsed · completion date passed | GREEN CARS PVT LTD | Apartment | – | Dec 2019 |
| Hamiton TowersCompleted · OC 12-02-2024 | Pelagsus Infrastructures Pvt Ltd | Apartment | 2,160 sqft carpet (as filed) | Completed |
8 of 23 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
All 25 projects in Koramangala → · K Raheja Corp's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Raheja Residency in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Aydin Infra Signature 3, price locked; Century Regalia (Project 2), price locked; Pacific Legacy, price locked.
| Aydin Infra Signature 3 | 1.1 km | Locked | |
|---|---|---|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2 km | Locked | |
| Century Regalia (Project 2) | 3.5 km | Locked | |
| Pacific Legacy | 4.0 km | Locked | |
| Ranka Iris | about 4 km | Locked | |
| Dhiraan Lotus | about 4.5 km | Locked | |
| Abhee Riviera Royale | about 5 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 5.7 km | Locked | |
| Vista Svara | about 6 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 6.5 km | Locked | |
| Mahindra NewHaven | 6.4 km | Locked | |
| Mahindra Zen | 6.4 km | Locked |
| Raheja Residency This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Aydin Infra Signature 3 | 1.1 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Century Regalia (Project 2) | 3.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Pacific Legacy | 4.0 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Dhiraan Lotus | about 4.5 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Rent, 5+BHK, 3 km | ₹1,00,000 /mo · 7 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹66,000 /mo · 9 listings | |
| Rent, 3BHK, 3 km | ₹71,000 /mo · 156 listings | |
| Rent, 2BHK, 3 km | ₹36,000 /mo · 354 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 293 listings | |
| Rent per sq ft, 3 km | ₹38.7 /mo, as listed · 284 listings with a size |
| Projects within 4 km, counted | 22 (10 with an approximate location) | |
|---|---|---|
| Flats in them | 2,413 | |
| Booked | 1,353 of 2,413 (56%) | |
| Unsold | 1,060 | |
| Booked a month, pooled | 28 flats | |
| Months to sell, pooled | 36 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 94% Residential (main), 6% Industrial (hi-tech) | |
|---|---|---|
| Nearest government-flagged flood location | 570 m, Koramangala Slum |
| Nearest storm drain | 280 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 340 m to the north-east, K100 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Nearest city water main | 380 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 280 m to the west, tertiary drain | |
|---|---|---|
| Ground level | 913 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.8 km, Central Silk Board | |
| Metro, under construction | 1.3 km, HSR Layout |
| Kempegowda Airport | 40.0 | 43 | 31.1 |
| MG Road (CBD) | 7.7 | 12 | 6.2 |
| Manyata Tech Park | 16.4 | 21 | 13.0 |
| ITPL, Whitefield | 20.2 | 23 | 13.0 |
| Ecospace, Bellandur ORR | 7.8 | 12 | 5.2 |
| Electronic City Ph 1 | 14.6 | 18 | 11.1 |
| Landfill or waste transfer station | 1.8 km to the north | |
|---|---|---|
| Sewage treatment plant | 860 m to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 960 m to the east |