Building plan (BIAPPA)Sanctioned 1 Jul 2022No. BIAAPA/TP/LAO/10/2021-22
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 11 of 11 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Applied for completion: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 1 with filed prices
Location & risks
What is the location like?
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operationalabout 30 kmK.R. Puram
Construction & progress
How is it being built, and when will it be ready?
Review1 to review
CompletionNo return filed
Progress
Completion, architect
Applied for completion: no quarterly return is on this phase's K-RERA filing
Work left
By component
Applied for completion: no quarterly return is on this phase's K-RERA filing
Quarterly return
Applied for completion: no quarterly return is on this phase's K-RERA filing
Dates
Dates
Developer
Can the developer deliver?
SoldNo return filed
Sold in the latest quarterNo return filed
Funding
Form 4
Estimated cost, at registration
₹40.85 Cr
Estimated cost, architect's certificate
₹14.72 Cr
Estimated cost, engineer's and chartered accountant's certificates
₹40.85 Cr, same as the filing
Sales
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BIAPPA)
Sanctioned 1 Jul 2022
Escrow bank
Karnataka Bank Ltd. · Kormangala
Stage
Certified progress
Applied for completion: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Locked
197 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
DOSL Score
70/100
Review
79th percentile in DevanahalliHigher than 11 of 15 scored projects
We really happy with our experience at RAK Felicity. A peaceful, well-planned community with spacious homes, greenery and a great location near Nandi Hills and Devanahalli. It’s away from the city’s chaos but still well connected. A lovely…
Bb.raghava raghava1 Sep 2026★★★★★
Rak is peaceful place and easy to access airport and nh44 and STRR HIGHWAY , Layout amenities and clubhouse are good
SShivam Dwivedi19 Feb 2026★★★★★
Nice development. Brilliant location. North Bangalore is currently a hot destination to invest in; and RAK felicity is perfect. All in all, a project worthy of investment - will surely bring in great returns over a period of few years. The…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Rak Felicity in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
The site
Zoning & hazards
Power lines and drains around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Borewell
Distances
Within 3 km of the filed pin
Connectivity
Road distance from the site
Nuisances
Distance from the filed pin
Not verified yet: Zoning, RMP 2015; Nearest high-tension line; Specification and Form 5; Nearest city water main; Ground level.
Filed dates
RERA completion date
30 Jun 2024
!Review
Work began, as filed
1 Jan 2023
Specified structure
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Schedule end; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Structural engineer, quarterly; Design consultants (Form 6); Fire safety; Environmental clearance.
Sold vs unsold
Applied for completion: no quarterly return is on this phase's K-RERA filing
Sold per quarter
Applied for completion: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Applied for completion: no quarterly return is on this phase's K-RERA filing
Compliance
Escrow
Applied for completion: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
Karnataka Bank Ltd. · Kormangala
Not verified yet: Receivable, sold plots; Cost left; Estimated cost; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot