Overview
Ranka Amber
Overview
Ranka Amber
Overview
Ranka Amber
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
E Khatha · BBMP · Survey [number withheld]
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 18 May 2026 · No. GBA/MDP/DDTP/0007/26-27 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Builder: DRA REALTY PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 108 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 18 May 2026 | |
| Escrow bank | KOTAK MAHINDRA BANK · Indiranagar |
Data room
Source: K-RERA project page and the documents filed there, as read by us. 23 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ranka Amber in the interactive atlas
Approval or registration
Building plan sanctioned
BBMP · plan GBA/MDP/DDTP/0007/26-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/050826/008859
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | [number withheld] | |
|---|---|---|
| Land extent, Sy [number withheld] | 1,301 sq m | |
| Land area of this registration | 1,301 sq m | |
| Khata | E Khatha · BBMP · 11 Feb 2025 |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jul 2029 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | [number withheld] |
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 20 | 1,165 |
| Sold, Q2 2026-27 | 0 / 20 | |
|---|---|---|
| Unsold, Q2 2026-27 | 20 |
| Assetz 66 & Shibui | about 0.5 km | Locked | |
|---|---|---|---|
| Axis Ekatva | about 1 km | Locked | |
| Reflections 66 | about 1 km | Locked | |
| Vaswani Starlight | about 1.5 km | Locked | |
| Coevolve Misty Shores | about 1.5 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 2.5 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2.5 km | Locked | |
| Vintage Valley | about 2.5 km | Locked | |
| Nirmaanika Aria | about 3 km | Locked | |
| Godrej Splendour | about 3 km | Locked | |
| Godrej Splendour Phase II | about 3.5 km | Locked |
| Ranka Amber This project | This project is the point the others are measured from | 31 Jul 2029 | 0% (0 of 20) | Not verified yet |
|---|---|---|---|---|
| Assetz 66 & Shibui | about 0.5 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Axis Ekatva | about 1 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Reflections 66 | about 1 km | 31 Dec 2030 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, GANDHIPURAM NEAR WHITE FIELD |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Pattandur Agrahara Lake |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation · Sauna And steam Room · Rooftop Clothes Drynig | |
|---|---|---|
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Rooftop Terrace, built | 0% | |
| Elevator, built | 0% | |
| Covered parking per unit | 1.10 (22 covered spaces for 20 units) | |
| Power backup | Declared by the promoter |
| Main structure | Not started · planned by 3 Apr 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 3 Oct 2028 | |
| Completion | 13% | |
| Completion, accountant | 5% of the estimated cost spent |
| Schedule end | 31 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Jul 2029 | |
| Work began, as filed | 10 Jul 2026 |
| Building heights, fire NOC | 14.99 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 6.98 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹7.50 Cr 53%Development · ₹6.64 Cr 47%
| Estimated cost, at registration | ₹14.14 Cr | |
|---|---|---|
| Cost incurred | ₹70.0 L (5% of the estimate) | |
| Cost left | ₹13.44 Cr | |
| Receivable, sold flats | ₹0 |
Unsold (20) 100%
| Sold, Q2 2026-27 | 0 / 20 · 20 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 20 | |
| 3 BHK, sold | 0 / 20 |
| Escrow bank | KOTAK MAHINDRA BANK · Indiranagar | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |
| 15% (10 of 66) |
| Locked |
| Vaswani Starlight | about 1.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Coevolve Misty Shores | about 1.5 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Projects within 4 km, counted | 76 (76 with an approximate location) | |
|---|---|---|
| Flats in them | 26,657 | |
| Booked | 17,422 of 26,657 (65%) | |
| Unsold | 9,235 | |
| Booked a month, pooled | 335 flats | |
| Months to sell, pooled | 27 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | BWSSB, Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 1 km, Kadugodi | |
| Metro, under construction | about 5.5 km, ISRO |
| Kempegowda Airport | 36 | 25 |
| MG Road (CBD) | 20 | 16 |
| Manyata Tech Park | 20 | 16 |
| ITPL, Whitefield | 2.5 | 1.5 |
| Ecospace, Bellandur ORR | 12.5 | 9.5 |
| Electronic City Ph 1 | 26 | 17.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named BMRCL RSS on OpenStreetMap |