Overview
Roaha Vivara
Overview
Roaha Vivara
Overview
Roaha Vivara
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 28 Apr 2026 · No. 04/2026-27 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 104 m² 76.6%2BHK · avg 83 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 13 Apr 2026 | |
| Building plan (BDA) | Sanctioned 28 Apr 2026 | |
| Escrow bank | IDFC FIRST BANK · KORAMANGALA |
Data room
121 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Roaha Vivara in the interactive atlas
Transfer of the land
Title deed executed
Sy 15/10; 15, Chikka Kannelli village, Varthur hobli · 00 Acre 20 Guntas; Sy 62/2; 62, Varthur hobli · 00 Acre 20 Guntas
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Sy 15/10; 15, Chikka Kannelli village, Varthur hobli · 00 Acre 20 Guntas; Sy 62/2; 62, Varthur hobli · 00 Acre 20 Guntas
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Approval or registration
Land use converted
District Commissioner, Bangalore · Survey 15/10, 15/12
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 15/10, 15/12
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 04/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/220626/008737
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 13 Apr 2026 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey-Sketch, 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 26,807 sq m | |
| Extent the filed land schedule names for these survey numbers | 4,046 sq m | |
| Plot area against the filed extent | 6.63 times | |
| Land area filed with K-RERA | 4,173 sq m | |
| Village, hobli and taluk on the KGIS map | Chikkakanneli, VARTURU2 hobli, BANGALORE-EAST taluk |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 15/10, 15/12 | |
|---|---|---|
| Land extent, Sy 15/10 | 20G | |
| Land extent, Sy 15/12 | 20G | |
| Whole survey numbers on the KGIS map | 26,807 sq m (the project holds a share) | |
| Land area of this registration | 4,173 sq m | |
| Khata | E Khatha · 1 Mar 2026 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 15/10 | 1 | 20 guntas | Not read yet | ||||
| Sy. No. 15/12 | 1 | 20 guntas | Not read yet |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2030 |
| Land conversion | Converted 4 Dec 2024 · District Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 15/10 · 15/12 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 15 | 892 |
| 3BHK | 49 | 1,117 |
| Sold, Q2 2026-27 | 2 / 64 | |
|---|---|---|
| Unsold, Q2 2026-27 | 62 | |
| Months to sell, derived from filed bookings | Too few bookings to project (2 flats booked in 3 months) |
| Satori Residence By Genurise | about 1 km | Locked | |
|---|---|---|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | Locked | |
| Mana Jardin Neo | about 1.5 km | Locked | |
| Haven Phase 2 | about 1.5 km | Locked | |
| 63 Degree East - Tower E | about 1.5 km | Locked | |
| Adarsh Rosewood | about 2 km | Locked | |
| Birla Evara | about 2 km | Locked | |
| Orion Heights | about 2.5 km | Locked | |
| Assetz Muse & Maison | about 3.5 km | Locked | |
| Assetz Ren & Rei | about 3.5 km | Locked |
| Roaha Vivara This project | This project is the point the others are measured from | 30 Jun 2030 | 3% (2 of 64) | Not verified yet |
|---|---|---|---|---|
| Satori Residence By Genurise | about 1 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 84% Residential (main), 9% Valley / drain buffer, 7% Water body, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 0.5 km, Doddakannelli | |
| Government land in the filed surveys | Sy 15: 19% of the parent survey, 1.26 of 6.62 acres | Review |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 16 Apr 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 24 Dec 2028 | |
| Completion | 5% | |
| Completion, accountant | 9.1% of the estimated cost spent |
| Possession, agreement | 30 Jun 2030 | |
|---|---|---|
| Schedule end | 30 Jun 2030 | |
| RERA completion date | 30 Jun 2030 | |
| Work began, as filed | 1 Jul 2026 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 24.98 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 16 May 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.10 Cr 29.3%Development · ₹38.82 Cr 70.7%
| Estimated cost, at registration | ₹54.92 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹35.54 Cr | |
| Cost incurred | ₹4.97 Cr (9.1% of the estimate) | |
| Receivable, sold flats | ₹2.31 Cr |
Sold (2) 3.1%Unsold (62) 96.9%
| Sold, Q1 2026-27 | 0 / 64 · 64 available | |
|---|---|---|
| Sold, Q2 2026-27 | 2 / 64 · 62 available | |
| Unsold, Q2 2026-27 | 62 | |
| Sold in Q2 2026-27 | 2 |
| Escrow bank | IDFC FIRST BANK · KORAMANGALA | |
|---|---|---|
| Designated account, collected | ₹17.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹17.8 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Mana Jardin Neo | about 1.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
|---|
| Haven Phase 2 | about 1.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| Projects within 4 km, counted | 83 (83 with an approximate location) | |
|---|---|---|
| Flats in them | 22,859 | |
| Booked | 12,624 of 22,859 (55%) | |
| Unsold | 10,235 | |
| Booked a month, pooled | 290 flats | |
| Months to sell, pooled | 33 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Hosa Road | |
| Metro, under construction | about 3.5 km, Bellandur |
| Kempegowda Airport | 50.5 | 33.5 |
| MG Road (CBD) | 16 | 13.5 |
| Manyata Tech Park | 23.5 | 18 |
| ITPL, Whitefield | 17.5 | 10.5 |
| Ecospace, Bellandur ORR | 6.5 | 3.5 |
| Electronic City Ph 1 | 11.5 | 7 |
| Landfill or waste transfer station | about 2.5 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |