The build quality is good and the location is very accessible.
Overview
Saibya Square
Overview
Saibya Square
Overview
Saibya Square
Overview
Photo: Sagar SamalTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 10 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 10 pages, not in English.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2023 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate 20 Jan 2022 |
|---|
Developer
Land · ₹1.67 Cr 12.4%Development · ₹11.83 Cr 87.6%
Loan & collateral
| Escrow bank | HDFC · JP NAGAR |
|---|
Data room
44 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
The build quality is good and the location is very accessible.
Prime location and main thing I purchased this flat is location so it’s really nice place to stay here one click will get everything within in a sec.
I Real like the prime location with easy access to schools, hospitals, and shopping areas, plus relatively safe surroundings and good connectivity to other parts of Bangalore.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aditya RaagaActive · 28% built | Aditya Constructions | Apartment | 862–1,037 sqft carpet (as filed) | Mar 2029 |
| Assetz Canvas & CoveLapsed · completion date passed | Assetz Property Group | Apartment | 933–1,900 sqft | – |
| Axis AntaraLapsed · completion date passed | AXIS CONCEPT CONSTRUCTION PVT LTD | Apartment | – | Jun 2021 |
| Dhiraan LotusCompleted (regulator flag) | DHIRAAN INFRASTRUCTURE PVT. LTD | Apartment | 994–1,798 sqft carpet (as filed) | Completed |
| G R FloretActive · 95% built | SGR BUILDTECH LLP | Apartment | 1,037 sqft carpet (as filed) | Dec 2026 |
| Prestige Song Of The South -Phase-2Completed · OC 04-04-2022 | Prestige Estates Projects Limited | Apartment | – | Completed |
| Pvr MithraCompleted (regulator flag) | SREE PVR DEVELOPERS | Apartment | – | Completed |
| Radiant Silver OakLapsed · completion date passed | Radiant Properties | Apartment | – | Dec 2019 |
8 of 13 other projects in Begur, A to Z. Status is taken from each project's own filing.
All 15 projects in Begur → · Saibya Structures PVT LTD's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Saibya Square in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 2,574 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 8 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Canvas & Cove 2.0 - Block A, price locked; Azur Tower D, price locked; Pacific Legacy, price locked; Lodha Azur, price locked; Mahindra NewHaven, price locked; Mahindra Zen, price locked; K&T's Sai Sannidhi, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked.
| Dhiraan Lotus | about 1 km | Locked | |
|---|---|---|---|
| Azur Phase 2 | about 1.5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | 2.0 km | Locked | |
| Azur Tower D | 2.2 km | Locked | |
| Pacific Legacy | 2.4 km | Locked | |
| Lodha Azur | 2.4 km | Locked | |
| Mahindra NewHaven | 2.5 km | Locked | |
| Mahindra Zen | 2.7 km | Locked | |
| K&T's Sai Sannidhi | 2.7 km | Locked | |
| Abhee Riviera Royale | about 3.5 km | Locked | |
| Iris Courtyard | about 4 km | Locked |
| Saibya Square This project | This project is the point the others are measured from | 30 Sep 2023 | – | Not verified yet |
|---|---|---|---|---|
| Dhiraan Lotus | about 1 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Azur Phase 2 | about 1.5 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
| Assetz Canvas & Cove 2.0 - Block A | 2.0 km | 30 Apr 2029 | 98% (238 of 244) | Locked |
| Azur Tower D | 2.2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
| Pacific Legacy | 2.4 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Rent, 4BHK, 3 km | ₹60,000 /mo · 5 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹55,000 /mo · 101 listings | |
| Rent, 2BHK, 3 km | ₹30,000 /mo · 237 listings | |
| Rent, 1BHK, 3 km | ₹16,000 /mo · 146 listings | |
| Rent per sq ft, 3 km | ₹32.3 /mo, as listed · 214 listings with a size |
| Projects within 4 km, counted | 48 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 12,029 | |
| Booked | 7,615 of 12,029 (63%) | |
| Unsold | 4,414 | |
| Booked a month, pooled | 142 flats | |
| Months to sell, pooled | 30 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 250 m, ROYQAL MERIDIAN LAYOUT |
| Nearest storm drain | 200 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 890 m to the south, Begur Lake |
| Schedule end | 31 Dec 2022 | |
|---|---|---|
| RERA completion date | 30 Sep 2023 | |
| Work began, as filed | 12 Jun 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹13.50 Cr |
|---|
| Escrow bank | HDFC · JP NAGAR | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 140 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 200 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 899 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.7 km, Kudlu Gate | |
| Metro, under construction | 2.9 km, I.I.M.B |
| Kempegowda Airport | 45.5 | 51 | 36.0 |
| MG Road (CBD) | 11.3 | 19 | 10.3 |
| Manyata Tech Park | 21.9 | 30 | 17.8 |
| ITPL, Whitefield | 24.9 | 31 | 16.5 |
| Ecospace, Bellandur ORR | 12.3 | 19 | 7.5 |
| Electronic City Ph 1 | 10.9 | 15 | 7.7 |
| Landfill or waste transfer station | 2.2 km to the west | |
|---|---|---|
| Sewage treatment plant | 1.4 km to the east, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 2.5 km to the south-west | |
| Crematorium | 2.8 km to the east, named Kudlu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the south |