Overview
Salarpuria Sattva Cadenza
Overview
Salarpuria Sattva Cadenza
Overview
Salarpuria Sattva Cadenza
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | GBC(1)91/2012 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹72.00 Cr 32.4%Development · ₹150.00 Cr
Loan & collateral
| Escrow bank | VIJAYA BANK · residency road |
|---|
Data room
64 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Salarpuria Sattva Cadenza in the interactive atlas
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,22,841 sq m | |
| Land area filed with K-RERA | 24,180 sq m | |
| Village, hobli and taluk on the KGIS map | Hongasandra, Beguru-2 hobli, Bangalore-South taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Whole survey numbers on the KGIS map | 1,22,841 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 24,180 sq m |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2019 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Mahindra Zen, price locked; Mahindra NewHaven, price locked; K&T's Sai Sannidhi, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked; Pacific Legacy, price locked.
| Abhee Riviera Royale | about 1.5 km | Locked | |
|---|---|---|---|
| Dhiraan Lotus | about 1.5 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 2.1 km | Locked | |
| Mahindra Zen | 2.2 km | Locked | |
| Mahindra NewHaven | 2.2 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2.5 km | Locked | |
| K&T's Sai Sannidhi | 2.5 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | 2.6 km | Locked | |
| Azur Phase 2 | about 3 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km | Locked | |
| Pacific Legacy | 3.9 km | Locked | |
| Aydin Infra Signature 3 | 4.1 km | Locked |
| Salarpuria Sattva Cadenza This project | This project is the point the others are measured from | 30 Jun 2019 | – | Not verified yet |
|---|---|---|---|---|
| Abhee Riviera Royale | about 1.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Dhiraan Lotus | about 1.5 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 2.1 km | 30 Dec 2030 | 69% (302 of 440) | Locked |
| Mahindra Zen | 2.2 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
| Mahindra NewHaven | 2.2 km | 28 Dec 2029 | 89% (106 of 119) | Locked |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2.5 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
| Rent, 5+BHK, 3 km | ₹95,000 /mo · 5 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹96,000 /mo · 15 listings | |
| Rent, 3BHK, 3 km | ₹65,000 /mo · 203 listings | |
| Rent, 2BHK, 3 km | ₹35,250 /mo · 384 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 201 listings | |
| Rent per sq ft, 3 km | ₹35.0 /mo, as listed · 344 listings with a size |
| Projects within 4 km, counted | 45 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 10,754 | |
| Booked | 6,189 of 10,754 (58%) | |
| Unsold | 4,565 | |
| Booked a month, pooled | 139 flats | |
| Months to sell, pooled | 31 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest government-flagged flood location | 330 m, B.T.R GARDEN LAYOUT |
| Nearest storm drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the north-west, an unnamed tank |
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 30 Jun 2019 | |
|---|---|---|
| RERA completion date | 30 Jun 2019 | |
| Work began, as filed | 20 Dec 2014 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)91/2012 | |
|---|---|---|
| Environmental clearance | Filed with the registration |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹222.00 Cr |
|---|
| Escrow bank | VIJAYA BANK · residency road |
|---|
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 377 sqft carpet (as filed) |
| Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 67 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 710 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 910 m above sea level, plus or minus 4 m | |
| Metro, operational | 400 m, Kudlu Gate | |
| Metro, under construction | 2.9 km, HSR Layout |
| Kempegowda Airport | 46.2 | 51 | 34.8 |
| MG Road (CBD) | 12.0 | 19 | 10.4 |
| Manyata Tech Park | 22.6 | 29 | 17.2 |
| ITPL, Whitefield | 22.6 | 29 | 14.6 |
| Ecospace, Bellandur ORR | 10.0 | 16 | 5.6 |
| Electronic City Ph 1 | 9.1 | 12 | 6.9 |
| Landfill or waste transfer station | 610 m to the north-east, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | 940 m to the south-west, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | 670 m to the east, named Kudlu Crematorium on OpenStreetMap | |
| Prison | 2.6 km to the south-east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 1.3 km to the north-east, named HSR Layout Substation on OpenStreetMap |