Building plan (BDA)Sanctioned 21 Jun 2023No. BDA/PS/EM/EO-1/TA-4/East/017/2023-24
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted 4 Jan 2023DC BANGALORE
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer fee₹ ••,•••
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Flats · avg 114 m² 100%
Unit types
Location & risks
What is the location like?
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedBorewell, Local authority (Panchayath Development Office)Declared by the promoter
Metro, operationalabout 4 kmWhitefield
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion100%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Receivable, sold flats₹16.72 CrAs of Q2 2026-27
Cost left₹0As of Q2 2026-27
Sold184 / 272As of Q2 2026-27
Sold in Q2 2026-273✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 21 Jun 2023
Escrow bank
HDFC · Richmond Road, Bangalore
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
180 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sarang by Sumadhura Phase-I in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Owners as on the RTC, read date / relation / share
Owners on the RTC
RTC extent
Filed extent
Extents agree?
Land category
Pending mutations
Sy. No. 119
████████
2
5 acres 9 guntas
0
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Title report; Schedule in the EC vs KGIS neighbours; Encumbrance certificate, Form 15; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; Share of sales revenue; Joint development agreement.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Sanctioned 21 Jun 2023 · No. BDA/PS/EM/EO-1/TA-4/East/017/2023-24
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/178/2023 · issued 21 Jul 2023
✓Clear
Environmental clearance
SEIAA 91 CON 2023 · EC identification no. EC23B038KA166501 · issued 23 Jun 2023
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-343879 · issued 25 Jun 2024 · valid until 22 Jun 2033
✓Clear
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2026
Registration certificates
PRM/KA/RERA/1251/446/PR/180723/006075
Land use
Conversion order
Land conversion
Converted 4 Jan 2023 · DC BANGALORE
Survey numbers
119
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹18.16 Cr 7.6%Development · ₹219.86 Cr 92.4%
Form 4
Estimated cost, at registration
₹238.02 Cr
Estimated cost, architect's certificate
₹238.02 Cr, same as the filing
Estimated cost, Form 4 Q2 2026-27
₹253.81 Cr
Cost incurred
₹253.81 Cr (100% of the Form 4 Q2 2026-27 estimate)
Cost left
₹0
Receivable, sold flats
₹16.72 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (184) 67.6%Unsold (88) 32.4%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
173 / 272 · 99 available
Sold, Q4 2025-26
179 / 272 · 93 available
Sold, Q1 2026-27
181 / 272 · 91 available
Sold, Q2 2026-27
184 / 272 · 88 available
Unsold, Q2 2026-27
88
Sold in Q4 2025-26
6
Sold in Q1 2026-27
2
Sold in Q2 2026-27
3
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Richmond Road, Bangalore
Designated account, collected
₹8.69 Cr in Q2 2026-27
Designated account, withdrawn
₹4.80 Cr in Q2 2026-27 (55% of that quarter's deposits)
Amount deposited in the quarter, Form 4
₹6,78,95,735
Share of collections deposited in escrow
55.23%
Sale proceeds realised, Q4 2025-26
₹9,78,76,275
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
18
Marked completed
8
Past promised date, not completed
0
Other phases under this promoter name
17
With a filed extension or completion
8 (8 completed, 0 extended)
Average schedule slip
12 months
Not verified yet: Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Borewell, Local authority (Panchayath Development Office)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot