Ideally located with access to Mysore Road highway and purple line metro along with in-house mall. RWA has maintained extremely well and truly as the name suggests it’s divine living in divinity
Overview
Sattva Divinity
Overview
Sattva Divinity
Overview
Sattva Divinity
Overview
Photo: Sattva DivinityTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | SEIAA 21 CON 2015 · issued 2 Aug 2016 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹139.00 Cr 33.3%Development · ₹279.00 Cr
Loan & collateral
| Escrow bank | KOTAK MAHINDRA BANK · M G ROAD |
|---|
Data room
75 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Ideally located with access to Mysore Road highway and purple line metro along with in-house mall. RWA has maintained extremely well and truly as the name suggests it’s divine living in divinity
A nice society with great amenities. Along eith A metro at your doorstep. A mall in the same premises for shopping as well as multiplex. Public parks in near by areas. What else you need.
It's one of the best place I have lived so far,metro on doorstep, mall on doorstep, pvr on doorstep, awesome maintainance and services, everyday someone comes for waste collection, regular swimming pool cleaning.loved it
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Divinity in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 44,009 sq m | |
|---|---|---|
| Sale deed | 5 May 2005 |
| Water supply NOC |
|---|
| Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2022 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Sobha Royal Crest | about 2 km | Locked | |
|---|---|---|---|
| Sumadhura Pramoda | about 2.5 km | Locked | |
| Adarsh Premia | 4.4 km | Locked | |
| Song Of Wind | about 4.5 km | Locked | |
| Garden Square | 4.6 km | Locked | |
| Samaya Sunshine | about 5 km | Locked | |
| Birla Tisya | 5.0 km | Locked | |
| Vista Svara | about 7 km | Locked | |
| Vista Padmalaya | about 7 km | Locked | |
| Srivara Vasudha | about 7.5 km | Locked | |
| Mahindra Eden Phase-2 | about 8 km | Locked | |
| Jhanavi Trishul Alaska | 8.4 km | Locked |
| Sattva Divinity This project | This project is the point the others are measured from | 30 Mar 2022 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Royal Crest | about 2 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Sumadhura Pramoda | about 2.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Adarsh Premia | 4.4 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Song Of Wind | about 4.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Garden Square | 4.6 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Samaya Sunshine | about 5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Rent, 3BHK, 3 km | ₹32,500 /mo · 16 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹22,000 /mo · 30 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 21 listings | |
| Rent per sq ft, 3 km | ₹22.9 /mo, as listed · 37 listings with a size |
| Projects within 4 km, counted | 13 (10 with an approximate location) | |
|---|---|---|
| Flats in them | 2,077 | |
| Booked | 1,246 of 2,077 (60%) | |
| Unsold | 831 | |
| Booked a month, pooled | 35 flats | |
| Months to sell, pooled | 21 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 81% Industrial (general), 19% Valley / drain buffer | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 270 m from the site | Clear |
| Nearest government-flagged flood location | 250 m, Nayandahalli |
| Nearest storm drain | 130 m to the south-east, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the south-east, Vrishabhavati |
| Completion |
|---|
| Completed, occupancy certificate 6 Mar 2020 |
| Schedule end | 30 Jun 2021 | |
|---|---|---|
| RERA completion date | 30 Mar 2022 | |
| Work began, as filed | 24 Oct 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | SEIAA 21 CON 2015 · issued 2 Aug 2016 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹418.00 Cr |
|---|
Sold (426) 65.3%Unsold (226) 34.7%
| Flats sold, at completion | 426 | |
|---|---|---|
| Flats unsold, at completion | 226 | |
| Flats in the phase | 652 |
| Escrow bank | KOTAK MAHINDRA BANK · M G ROAD |
|---|
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| RITEWAY & KUBERA PROMOTERS |
| Plot |
| ~1,200–2,400 sqft (estimate: filed carpet plus 25%) |
| Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 240 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 130 m to the south-east, primary drain | |
|---|---|---|
| Ground level | 817 m above sea level, plus or minus 4 m | |
| Metro, operational | 290 m, Pantarapalya-Nayandahalli | |
| Metro, under construction | 8.1 km, Tavarekere |
| Kempegowda Airport | 44.7 | 47 | 34.8 |
| MG Road (CBD) | 11.9 | 16 | 9.0 |
| Manyata Tech Park | 22.3 | 26 | 15.5 |
| ITPL, Whitefield | 29.1 | 34 | 23.4 |
| Ecospace, Bellandur ORR | 22.4 | 29 | 16.7 |
| Electronic City Ph 1 | 35.4 | 31 | 19.8 |
| Landfill or waste transfer station | 3.0 km to the north | |
|---|---|---|
| Sewage treatment plant | 330 m to the south-west, named Vrishabhavathi Valley 150MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 670 m to the south-west, named Vrishabavathi Valley on OpenStreetMap |