Google reviews N Nelaturi akhil 14 Apr 2025 ★ ★ ★ ★ ★ Quality of construction is impressive. From premium flooring tiles to weather resistant exterior paint, focus on durability is clear. use of branded electrical fittings and plumbing adds to the trust factor. Maintenance Planning, management…
K Koteswarao Kunchala 17 Mar 2025 ★ ★ ★ ★ ★ Quality of construction, material quality is impressive. From premium flooring tiles to weather resistant exterior paint, focus on durability is clear. use of branded electrical fittings and plumbing adds to the trust factor.
P Pravin Reddy 17 Dec 2024 ★ ★ ★ ★ ★ I recently visited SBR Earth and Sky, and I’m really impressed with this project. Located in Whitefield, Bangalore, it’s a great spot with easy access to offices, schools, shopping malls, and hospitals. The design of the buildings is modern…
Not verified yet: Recent price, super built-up; Gross yield; East Bengaluru, past year; Price paid per sq ft, super built-up.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sbr Earth & Sky in the interactive atlas
•• ••• ••••
Title Title report •• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries Schedule in the EC vs KGIS neighbours Encumbrance certificate, Form 15 Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey •••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership Joint development agreement Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Sbr Earth & Sky's developer filed before you say yes.
× Sbr Earth & Sky
SBR INFRASPACE · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
KSFES/NOC/278/2022 · issued 22 Nov 2022
Environmental clearance Filed with the registration
Airport height NOC Filed with the registration
Pollution board (CFE) Filed with the registration
Water supply NOC Filed with the registration
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/191022/005344 Not verified yet: Validity.
•••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Sbr Earth & Sky's developer filed before you say yes.
× Sbr Earth & Sky
SBR INFRASPACE · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
•• %
Payments Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Sbr Earth & Sky's developer filed before you say yes.
× Sbr Earth & Sky
SBR INFRASPACE · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 6 listings 1BHK: median ₹12,500 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,500 /mo 2BHK · 43 listings 2BHK: median ₹32,000 /mo over 43 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹32,000 /mo 3BHK · 17 listings 3BHK: median ₹50,000 /mo over 17 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹50,000 /mo
1BHK · 6 listings 1BHK: median ₹12,500 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,500 /mo 2BHK · 43 listings 2BHK: median ₹32,000 /mo over 43 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹32,000 /mo 3BHK · 17 listings
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 10,887 unsold flats ÷ 313 booked a month across 56 projects 35 months Ruchira Park East Ruchira Park East, 750 m: 64 unsold ÷ 9 booked in 9 months 64 months Elv High Garden Elv High Garden, about 1 km: 143 unsold ÷ 6 booked in 9 months 215 months Sv Green View Sv Green View, about 1 km: 124 unsold ÷ 23 booked in 9 months 49 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.2 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
3.5 km Whitefield
Around it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Kitchen handover, Sewage plant.
0% 50% 100% Q3 2025-26: 88% 88% Q3 2025-26 Q4 2025-26: 90% 90% Q4 2025-26 Promised 30 Sep 2026: 100% (needed) Promised 30 Sep 2026 0% 50% 100% Q3 2025-26: 88% 88% Q3 2025-26 Q4 2025-26: 90% 90% Q4 2025-26 Promised 30 Sep 2026: 100% (needed) Promised 30 Sep 2026 0% 50% 100% Q3 2025-26: 88% 88% Q3 2025-26 Q4 2025-26: 90% 90% Q4 2025-26 Promised 30 Sep 2026: 100% (needed) Promised 30 Sep 2026 0% 50% 100% Q3 2025-26: 88% 88% Q3 2025-26 Q4 2025-26: 90% 90% Q4 2025-26 Promised 30 Sep 2026: 100% (needed) Promised 30 Sep 2026 As the promoter reported it Possession date in the agreement
Work left By component, Q4 2025-26 TOWER A TOWER A: 90% 90% TOWER B TOWER B: 90% 90% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 95% 95% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 100% 100% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 50% 50% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 40% 40% Elevation work Elevation work: 50% 50% Club House Club House: 80% 80% Indoor Sports facility Indoor Sports facility: 60% 60% Gym Gym: 30% 30% Sewage and Drainage System Sewage and Drainage System: 40% 40% Solid waste management and disposal Solid waste management and disposal: 30% 30% Storm water drains Storm water drains: 30% 30% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water conservation/rain water harvesting/recharg e of ground water Water conservation/rain water harvesting/recharge of ground water: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Emergency Evacuation services Emergency Evacuation services: 50% 50% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 80% 80% Common entrance and exit for the building/common portico/foyer/vera ndah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 75% 75% Provision for lodging of management staff and security staff Provision for lodging of management staff and security staff: 40% 40% Common storage spaces Common storage spaces: 30% 30% Electricity Not started Power Backup Not started Parks & Tree planting Not started Water Supply, external Not started Water Supply, internal Not started
TOWER A TOWER A: 90% 90% TOWER B TOWER B: 90% 90% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 95% 95% Basic work of Water supply,
TOWER A TOWER A: 90% 90% TOWER B TOWER B: 90% 90% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 95% 95% Basic work of Water supply,
TOWER A TOWER A: 90% 90% TOWER B TOWER B: 90% 90% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 95% 95% Basic work of Water supply,
Quarterly return, Q4 2025-26 Dates Dates 2023 2025 2027 Work began 25 Aug 2022 Builder's schedule ends 31 Aug 2026 Keys promised 30 Sep 2026 RERA deadline 30 Sep 2026 As of 18 Nov 2026 Work began: 25 Aug 2022 Builder's schedule ends: 31 Aug 2026 Keys promised: 30 Sep 2026 RERA deadline: 30 Sep 2026 As of 18 Nov 2026
2023 2024 2025 2026 2027 Work began 25 Aug 2022 Builder's schedule ends 31 Aug 2026 Keys promised 30 Sep 2026 RERA deadline 30 Sep 2026 As of 18 Nov 2026 Work began: 25 Aug 2022 Builder's schedule ends: 31 Aug 2026 Keys promised: 30 Sep 2026 RERA deadline: 30 Sep 2026 As of 18 Nov 2026
2023 2024 2025 2026 2027 Work began 25 Aug 2022 Builder's schedule ends 31 Aug 2026 Keys promised 30 Sep 2026 RERA deadline 30 Sep 2026 As of 18 Nov 2026 Work began: 25 Aug 2022 Builder's schedule ends: 31 Aug 2026 Keys promised: 30 Sep 2026 RERA deadline: 30 Sep 2026 As of 18 Nov 2026
2023 2024 2025 2026 2027 Work began 25 Aug 2022 Builder's schedule ends 31 Aug 2026 Keys promised 30 Sep 2026 RERA deadline 30 Sep 2026 As of 18 Nov 2026 Work began: 25 Aug 2022 Builder's schedule ends: 31 Aug 2026 Keys promised: 30 Sep 2026 RERA deadline: 30 Sep 2026 As of 18 Nov 2026
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Structure; Structural safety certificate; Internal roads; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹37.33 Cr: 24.4% Development · ₹115.75 Cr: 75.6% ₹153 Cr estimated cost Land · ₹37.33 Cr 24.4% Development · ₹115.75 Cr 75.6%
Sales Sold vs unsold, Q4 2025-26 Sold (134): 97.8% Unsold (3): 2.2% 98% 137 flats Sold (134) 97.8% Unsold (3) 2.2%
Sold per quarter Q4 2025-26 0 flats
Q4 2025-26 0 flats
Q4 2025-26 0 flats
Q4 2025-26 0 flats
Compliance Escrow, Q4 2025-26 Paid in Paid into the designated account in Q4 2025-26 ₹34.2 L Withdrawn Withdrawn by the promoter in Q4 2025-26 ₹34.2 L
Paid in Paid into the designated account in Q4 2025-26 ₹34.2 L Withdrawn Withdrawn by the promoter in Q4 2025-26 ₹34.2 L
Paid in Paid into the designated account in Q4 2025-26 ₹34.2 L Withdrawn Withdrawn by the promoter in Q4 2025-26 ₹34.2 L
Paid in Paid into the designated account in Q4 2025-26 ₹34.2 L Withdrawn Withdrawn by the promoter in Q4 2025-26 ₹34.2 L
Not verified yet: Receivable, sold flats; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Q4 2025-26: 90% built, as the promoter reported it 90% Q3 2025-26 Q3 2025-26: 88% built, as the promoter reported it 88% Q4 2025-26 Q4 2025-26: 90% built, as the promoter reported it 90%
Q3 2025-26 Q3 2025-26: 88% built, as the promoter reported it 88% Q4 2025-26 Q4 2025-26: 90% built, as the promoter reported it 90%
Q3 2025-26 Q3 2025-26: 88% built, as the promoter reported it 88% Q4 2025-26 Q4 2025-26: 90% built, as the promoter reported it 90%
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
SAI BABA ASHRAM KADUGODI PATTALAMMA LAYOUT NEAR KADUGODI SIDDHARTHA LAYOUT KADUGODI TRIVENI NAGAR NEAR KR PURAM 1 km 3 km 2 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The site3BHK: median ₹50,000 /mo over 17 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹50,000 /mo 1BHK · 6 listings 1BHK: median ₹12,500 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,500 /mo 2BHK · 43 listings 2BHK: median ₹32,000 /mo over 43 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹32,000 /mo 3BHK · 17 listings 3BHK: median ₹50,000 /mo over 17 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹50,000 /mo
1BHK · 6 listings 1BHK: median ₹12,500 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,500 /mo 2BHK · 43 listings 2BHK: median ₹32,000 /mo over 43 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹32,000 /mo 3BHK · 17 listings 3BHK: median ₹50,000 /mo over 17 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹50,000 /mo
Amrutha Lake Vista, 1.7 km: 474 unsold ÷ 49 booked in 9 months 87 months Within 4 km, pooled 10,887 unsold flats ÷ 313 booked a month across 56 projects 35 months Ruchira Park East Ruchira Park East, 750 m: 64 unsold ÷ 9 booked in 9 months 64 months Elv High Garden Elv High Garden, about 1 km: 143 unsold ÷ 6 booked in 9 months 215 months Sv Green View Sv Green View, about 1 km: 124 unsold ÷ 23 booked in 9 months 49 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.2 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.7 km: 474 unsold ÷ 49 booked in 9 months 87 months
Within 4 km, pooled 10,887 unsold flats ÷ 313 booked a month across 56 projects 35 months Ruchira Park East Ruchira Park East, 750 m: 64 unsold ÷ 9 booked in 9 months 64 months Elv High Garden Elv High Garden, about 1 km: 143 unsold ÷ 6 booked in 9 months 215 months Sv Green View Sv Green View, about 1 km: 124 unsold ÷ 23 booked in 9 months 49 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.2 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.7 km: 474 unsold ÷ 49 booked in 9 months 87 months
Within 4 km, pooled 10,887 unsold flats ÷ 313 booked a month across 56 projects 35 months Ruchira Park East Ruchira Park East, 750 m: 64 unsold ÷ 9 booked in 9 months 64 months Elv High Garden Elv High Garden, about 1 km: 143 unsold ÷ 6 booked in 9 months 215 months Sv Green View Sv Green View, about 1 km: 124 unsold ÷ 23 booked in 9 months 49 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.2 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.7 km: 474 unsold ÷ 49 booked in 9 months 87 months
500 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Lake or tank Storm drain, primary The site20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 31.3 km by road 31.3 km MG Road (CBD) MG Road (CBD): 23.5 km by road 23.5 km Manyata Tech Park Manyata Tech Park: 23.0 km by road 23.0 km ITPL, Whitefield ITPL, Whitefield: 7.4 km by road 7.4 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.0 km by road 18.0 km Electronic City Ph 1 Electronic City Ph 1: 31.7 km by road 31.7 km
Kempegowda Airport Kempegowda Airport: 31.3 km by road 31.3 km MG Road (CBD) MG Road (CBD): 23.5 km by road 23.5 km Manyata Tech Park Manyata Tech Park: 23.0 km by road 23.0 km ITPL, Whitefield ITPL, Whitefield: 7.4 km by road 7.4 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.0 km by road 18.0 km Electronic City Ph 1 Electronic City Ph 1: 31.7 km by road 31.7 km
Kempegowda Airport Kempegowda Airport: 31.3 km by road 31.3 km MG Road (CBD) MG Road (CBD): 23.5 km by road 23.5 km Manyata Tech Park Manyata Tech Park: 23.0 km by road 23.0 km ITPL, Whitefield ITPL, Whitefield: 7.4 km by road 7.4 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.0 km by road 18.0 km Electronic City Ph 1 Electronic City Ph 1: 31.7 km by road 31.7 km
Kempegowda Airport Kempegowda Airport: 31.3 km by road 31.3 km MG Road (CBD) MG Road (CBD): 23.5 km by road 23.5 km Manyata Tech Park Manyata Tech Park: 23.0 km by road 23.0 km ITPL, Whitefield ITPL, Whitefield: 7.4 km by road 7.4 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.0 km by road 18.0 km Electronic City Ph 1 Electronic City Ph 1: 31.7 km by road 31.7 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Electrical substation Electrical substation: 320 m 320 m Sewage treatment plant Sewage treatment plant: 1.6 km 1.6 km
Electrical substation Electrical substation: 320 m 320 m Sewage treatment plant Sewage treatment plant: 1.6 km 1.6 km
Electrical substation Electrical substation: 320 m 320 m Sewage treatment plant Sewage treatment plant: 1.6 km 1.6 km
Electrical substation Electrical substation: 320 m 320 m Sewage treatment plant Sewage treatment plant: 1.6 km 1.6 km
Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 100% 100% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 50% 50% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 40% 40% Elevation work Elevation work: 50% 50% Club House Club House: 80% 80% Indoor Sports facility Indoor Sports facility: 60% 60% Gym Gym: 30% 30% Sewage and Drainage System Sewage and Drainage System: 40% 40% Solid waste management and disposal Solid waste management and disposal: 30% 30% Storm water drains Storm water drains: 30% 30% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Emergency Evacuation services Emergency Evacuation services: 50% 50% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 80% 80% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 75% 75% Provision for lodging of management staff and security staff Provision for lodging of management staff and security staff: 40% 40% Common storage spaces Common storage spaces: 30% 30% Electricity Not started Power Backup Not started Parks & Tree planting Not started Water Supply, external Not started Water Supply, internal Not started Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 100% 100% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 50% 50% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 40% 40% Elevation work Elevation work: 50% 50% Club House Club House: 80% 80% Indoor Sports facility Indoor Sports facility: 60% 60% Gym Gym: 30% 30% Sewage and Drainage System Sewage and Drainage System: 40% 40% Solid waste management and disposal Solid waste management and disposal: 30% 30% Storm water drains Storm water drains: 30% 30% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Emergency Evacuation services Emergency Evacuation services: 50% 50% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 80% 80% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 75% 75% Provision for lodging of management staff and security staff Provision for lodging of management staff and security staff: 40% 40% Common storage spaces Common storage spaces: 30% 30% Electricity Not started Power Backup Not started Parks & Tree planting Not started Water Supply, external Not started Water Supply, internal Not started Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 100% 100% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 50% 50% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 40% 40% Elevation work Elevation work: 50% 50% Club House Club House: 80% 80% Indoor Sports facility Indoor Sports facility: 60% 60% Gym Gym: 30% 30% Sewage and Drainage System Sewage and Drainage System: 40% 40% Solid waste management and disposal Solid waste management and disposal: 30% 30% Storm water drains Storm water drains: 30% 30% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Emergency Evacuation services Emergency Evacuation services: 50% 50% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 80% 80% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 75% 75% Provision for lodging of management staff and security staff Provision for lodging of management staff and security staff: 40% 40% Common storage spaces Common storage spaces: 30% 30% Electricity Not started Power Backup Not started Parks & Tree planting Not started Water Supply, external Not started Water Supply, internal Not started