The best and beautiful apartment with most convenient place
Pprabhakara cp28 Jun 2025★★★★★
The apartment is in good location, in Agrahara main road. 3 kms to kogilu cross Airport rd. It is under construction, possession next year 2026, G+3 upper floors, 112 flats. Currently 3 bhk flats are available starting from 1500 sft. Sales…
AAnjan Prasad26 Jun 2025★★★★★
Shashank Akshaya apartment is under construction and team mentioned Handover next year 2026. Main road property, cost is affordable but only 3 bhk flats are available. Construction is good, sales team provided all the details, bank loan…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shashank Akshaya in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 27 Nov 2023 · No. BBMP/Ad.Com./YLK/0157/23-24
Power NOC
Filed with the registration
Fire department
Filed with the registration
SEIAA
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-338506 · issued 7 Jul 2023 · valid until 2 Jul 2028
✓Clear
Water and sewerage NOC (BWSSB)
issued 19 Apr 2024
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
30 Apr 2027
Registration certificates
PRM/KA/RERA/1251/309/PR/200524/006911
Land use
Conversion order
Land conversion
Converted 14 Nov 2022 · DC office, Bangalore
Survey numbers
299/110/7B & 110/7A
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 103 m² 80.4%2BHK · avg 79 m² 18.8%1BHK · 54 m² 0.9%
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6); Fire safety; Environmental clearance.
Land · ₹4.26 Cr 14.2%Development · ₹25.73 Cr 85.8%
Form 4
Estimated cost, at registration
₹29.99 Cr
Estimated cost, architect's and engineer's certificates
₹24.74 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (100) 89.3%Unsold (12) 10.7%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
67 / 112 · 45 available
Sold, Q4 2025-26
67 / 112 · 45 available
Sold, Q1 2026-27
87 / 112 · 25 available
Sold, Q2 2026-27
100 / 112 · 12 available
Unsold, Q2 2026-27
12
Sold in Q4 2025-26
0
Sold in Q1 2026-27
20
Sold in Q2 2026-27
13
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Karur Vysya Bank Ltd. · Vidyaranyapura
Designated account, collected
₹15.21 Cr in Q2 2026-27
Designated account, withdrawn
₹9.7 L in Q2 2026-27 (1% of that quarter's deposits)
Share of collections deposited in escrow
100%
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Yelahanka taluk average, July 2023: 11.4 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class
Through the year
January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot