Overview
Shivaganga Ar Prakruthi
Overview
Shivaganga Ar Prakruthi
Overview
Shivaganga Ar Prakruthi
Overview
Photo: Srinivas DTSTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 88 m² 76.7%2BHK · avg 72 m² 23.3%
Location & risks
Construction & progress
Developer
Land · ₹35.22 Cr 41%Development · ₹50.76 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 20 Sep 2022 | |
| Escrow bank | Canara Bank · Uttarahalli |
Data room
188 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Very good apartment complex. They have Gym and swimming pool in the basement. Very big parking lot available.
After years of planning and saving, finally stepping into my own apartment feels unreal. This space is more than walls and windows; it is a sign of independence, hard work, and new beginnings. Excited to fill it with peace, progress, and…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 100 TreesCompleted · OC 08-06-2021 | ADIGA PROPERTY DEVELOPERS | Apartment | – | Completed |
| Akshaya RegaliaCompleted (regulator flag) | AKSHAYA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| Anitha RegencyLapsed · completion date passed | SHAKTHI INFRASTRUCTURE | Apartment | 794 sqft carpet (as filed) | Mar 2024 |
| Anu GreensLapsed · completion date passed | Jyothi P | Plot | ~1,200–1,670 sqft (estimate: filed carpet plus 25%) | Jun 2024 |
| Arkha SanctuaryCompleted (regulator flag) | ARKHA DEVELOPERS | Apartment | 793–945 sqft carpet (as filed) | Completed |
| Casper ValleyRegistered · no quarterly update yet | AURA WAVE ESTATES LLP | Plot | ~1,060–2,000 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
| Century CentralCompleted (regulator flag) | Century joint Development Private Limited | Mixed development | – | Completed |
| Comfot HeightsLapsed · completion date passed | Comfort Builders and Developers | Apartment | 1,015 sqft carpet (as filed) | Oct 2020 |
8 of 65 other projects in Uttarahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shivaganga Ar Prakruthi in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 20 Sep 2022 · No. PRJ/1576/21-22IN | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-334951 · issued 14 Dec 2022 · validity ended 13 Dec 2025 | |
| Water and sewerage NOC (BWSSB) | issued 31 Dec 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2025 |
| Land conversion | 3 of 4 parcels converted | |
|---|---|---|
| Sy 19/1, 19/2 | Converted 17 Dec 2014 · Deputy Commissioner, Bengaluru Urban District | |
| Sy 19/3 | Converted 8 Nov 2019 · Deputy Commissioner, Bengaluru Urban District | |
| Sy 20/4 & 20/5 | Declared not converted | |
| Survey numbers | 19/1 · 19/2 · 19/3 · 20/4 & 20/5 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 28 | 777 |
| 3BHK | 92 | 948 |
| Garden Square | about 1 km | Locked | |
|---|---|---|---|
| Song Of Wind | about 1.5 km | Locked | |
| Sobha Royal Crest | about 1.5 km | Locked | |
| Adarsh Premia | about 2.5 km | Locked | |
| Srivara Vasudha | about 4 km | Locked | |
| Sumadhura Pramoda | about 4 km | Locked | |
| Samaya Sunshine | about 4.5 km | Locked | |
| Mahindra Eden Phase-2 | about 4.5 km | Locked | |
| Jhanavi Trishul Alaska | about 5.5 km | Locked | |
| Sattva Forest Ridge | about 5.5 km | Locked | |
| Platinum Landmark | about 6.5 km | Locked | |
| Iris Courtyard | about 6.5 km | Locked |
| Shivaganga Ar Prakruthi This project | This project is the point the others are measured from | 30 Sep 2025 | – | Not verified yet |
|---|---|---|---|---|
| Garden Square | about 1 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Song Of Wind | about 1.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Sobha Royal Crest | about 1.5 km | 31 Dec 2028 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, sanjaynagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Uttarahalli Raikere/Uttarahalli Lake |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.10 (132 covered spaces for 120 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 24 Dec 2024 |
|---|
Builder's schedule runs about 37 months past the promised possession date.
| Possession, agreement | 2 Sep 2022 | |
|---|---|---|
| Schedule end | 20 Sep 2025 | |
| RERA completion date | 30 Sep 2025 | |
| Work began, as filed | 2 Sep 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 80 sq m |
|---|
| Engineer's certificate, registration | Dated 25 Jan 2023 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 2 Feb 2023 |
| Estimated cost, at registration | ₹85.98 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹45.93 Cr |
Sold (50) 41.7%Unsold (70) 58.3%
| Flats sold, at completion | 50 | |
|---|---|---|
| Flats unsold, at completion | 70 | |
| Flats in the phase | 120 |
| Escrow bank | Canara Bank · Uttarahalli |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 100% (329 of 329) |
| Locked |
| Adarsh Premia | about 2.5 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
|---|
| Srivara Vasudha | about 4 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Sumadhura Pramoda | about 4 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Projects within 4 km, counted | 26 (26 with an approximate location) | |
|---|---|---|
| Flats in them | 4,780 | |
| Booked | 3,489 of 4,780 (73%) | |
| Unsold | 1,291 | |
| Booked a month, pooled | 84 flats | |
| Months to sell, pooled | 15 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Doddakallasandra | |
| Metro, under construction | about 6.5 km, J.P. Nagar 4th Phase |
| Kempegowda Airport | 46 | 37 |
| MG Road (CBD) | 13 | 10 |
| Manyata Tech Park | 21.5 | 17.5 |
| ITPL, Whitefield | 30 | 23 |
| Ecospace, Bellandur ORR | 18.5 | 15.5 |
| Electronic City Ph 1 | 27 | 17 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Arehalli on OpenStreetMap |