Photo: Asish PradhanTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
| Estimated cost, at registration | ₹60.00 Cr |
|---|
Loan & collateral
| Escrow bank | VIJAYA BANK · SANJAY NAGAR |
|---|
Data room
87 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
It's good but mainroad is not near it's far
Residential complex with swimming pool, hall for functions etc. Well maintained. Public road in the last leg to reach the enclave is not smooth.
It's like a residential school hostel far from the main road with only borewell water, with no kauvery connection , unless and until if you have your own vehicle 🚜 transportation is easier for them no groceries near by ,it's does not have…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aadya SereneExtended to 24-03-2028 | M/s. JUST NATURAL | Apartment | – | Mar 2028 |
| Akasha By Essem18Active · 32% built | Essem18 Developers Private Limited | Apartment | 592–1,229 sqft carpet (as filed) | May 2029 |
| Amigo AmparoExtended to 30-12-2026 | AMIGO PROPERTIES INDIA LLP | Apartment | 906–1,062 sqft carpet (as filed) | Dec 2026 |
| Antaliea HomesLapsed · completion date passed | VNG Developers | Apartment | 2,217 sqft carpet (as filed) | Jul 2019 |
| Aparna MapleCompleted · OC 21-04-2022 | Aparna Constructions And Estates Pvt Ltd | Apartment | 721 sqft carpet (as filed) | Completed |
| Assetz Zen & SatoActive · 60% built | APG TOWNSHIPS PRIVATE LIMITED | Apartment | 267–1,962 sqft carpet (as filed) | May 2030 |
| Baldota SummitActive · 18% built | BALDOTA BUILDERS AND DEVELOPERS | Apartment | 976–986 sqft carpet (as filed) | Mar 2030 |
| Bhartiya City Nikoo Homes 1Completed (regulator flag) | Bhartiya City | Apartment | 620–2,800 sqft | Completed |
8 of 80 other projects in Thanisandra, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shrishti Enclave in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| RERA extensions | Granted · Approved 25 Apr 2023 | |
|---|---|---|
| RERA completion date | 31 Mar 2023 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Assetz Soho & Sky Phase 1b | about 1.5 km | Locked |
|---|
| Sobha City Athena | about 1.5 km | Locked |
|---|
| 4square Park Sierra | about 2.5 km | Locked |
|---|
| Sumadhura Epitome | about 2.5 km | Locked |
|---|
| Cumins Sanctum | about 2.5 km | Locked |
|---|
| Legacy Salvador | about 2.5 km | Locked |
|---|
| Sumadhura Solea | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked |
|---|
| Sattva La Vita | about 3 km | Locked |
|---|
| Assetz Soho & Sky | about 3 km | Locked |
|---|
| Shrishti Enclave This project | This project is the point the others are measured from | 31 Mar 2023 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Soho & Sky Phase 1b | about 1.5 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
| Sobha City Athena | about 1.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
| 4square Park Sierra | about 2.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Sumadhura Epitome | about 2.5 km | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Cumins Sanctum | about 2.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Legacy Salvador | about 2.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
| Projects within 4 km, counted | 79 (79 with an approximate location) | |
|---|---|---|
| Flats in them | 22,931 | |
| Booked | 14,240 of 22,931 (62%) | |
| Unsold | 8,691 | |
| Booked a month, pooled | 354 flats | |
| Months to sell, pooled | 24 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2.5 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Completed, occupancy certificate 9 May 2022 |
| Schedule end | 20 Sep 2021 | |
|---|---|---|
| RERA completion date | 31 Mar 2023 | |
| Work began, as filed | 15 Mar 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Sold (119) 62%Unsold (73) 38%
| Flats sold, at completion | 119 | |
|---|---|---|
| Flats unsold, at completion | 73 | |
| Flats in the phase | 192 |
| Escrow bank | VIJAYA BANK · SANJAY NAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 10.5 km, Yeshwantpur | |
| Metro, under construction | about 3 km, Yelahanka |
| Kempegowda Airport | 24 | 15.5 |
| MG Road (CBD) | 15.5 | 12.5 |
| Manyata Tech Park | 7.5 | 4.5 |
| ITPL, Whitefield | 23.5 | 17 |
| Ecospace, Bellandur ORR | 28.5 | 19 |
| Electronic City Ph 1 | 37 | 28 |
| Landfill or waste transfer station | about 3 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |