Building plan (BDA)Sanctioned 29 May 2025No. BDA/TPM/PRL/1060/2024-25
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 8 of 8 parcelsDates and authorities below
Permits
Approval letters
Building plan (BDA)
Sanctioned 29 May 2025 · No. BDA/TPM/PRL/1060/2024-25
Power NOC
Filed with the registration
SEIAA
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
The area
Rent & yield
Median rent, 3 km
Location & risks
What is the location like?
Review2 to review
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedBorewell, Local authority (GRAMA PANCHAYATHI,Manduru)Declared by the promoter
Metro, operational6.6 kmWhitefield
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion83%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Receivable, sold plots₹5.53 CrAs of Q2 2026-27
Cost left₹3.11 CrAs of Q2 2026-27
Funding
Estimated cost
Land · ₹12.56 Cr
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 29 May 2025
Escrow bank
Canara Bank · HOSKOTE
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
147 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 5 of 6 filed survey numbers matched, 1 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
An honest review after getting our ownership. We saw all the surroundings for almost 2 weeks time & couldn't get much options which are near to main road & ready for construction with this price as we wanted specially in bda approved sites…
AAnkita Chaurasia15 Feb 2026★★★★★
My husband and I visited this project after one of our neighbours, who had purchased a plot in Phase 1, referred us. We were specifically looking for a BDA-approved layout since we have been living in AECS Layout for many years and prefer…
JJitesh Soni15 Feb 2026★★★★★
Finally we signed the agreement of our plot 3 days ago, after doing so much research in this area comparing the nearby plotted development where as no much BDA approved properties are available, even for BMRDAs nearby 3 to 4 KMs quoting 8.5…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sidvin Horizen By The Lake 2 in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
30 Dec 2027
Registration certificates
PRM/KA/RERA/1251/446/PR/151025/008171
Land use
Conversion order
Land conversion
8 of 8 parcels converted
Sy SY No 26/4, SY NO 26/6, SY NO 26/…
Converted 18 Dec 2024 · Deputy Commissioner, Bangalore Urban
SY No 26/4 · SY NO 26/6 · SY NO 26/7 · SY NO 26/8 · SY No 32(Part1) · SY No 32(PART 2) · SY NO 32(PART 3) · SY No 35 II
Not verified yet: Validity, Fire NOC, Airport height NOC.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Rents and yields
Rent, 3BHK, 3 km
₹45,000 /mo · 12 listings
Rent, 2BHK, 3 km
₹29,000 /mo · 25 listings
Rent, 1BHK, 3 km
₹18,500 /mo · 6 listings
Rent per sq ft, 3 km
₹29.3 /mo, as listed · 41 listings with a size
Unsold stock nearby
Months to sell unsold stock
K-RERA inventory
Projects within 4 km, counted
50 (34 with an approximate location)
Plots in them
17,339
Booked
8,920 of 17,339 (51%)
Unsold
8,419
Booked a month, pooled
285 plots
Months to sell, pooled
26 months
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; K-RERA inventory; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Nearest 12 with filed prices; This project vs the nearest with filed prices; Bengaluru median yield.
Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed)
✓Clear
Engineer's certificate, registration
Dated 11 Sep 2025
Chartered accountant's certificate, registration
Dated 19 Sep 2025
Chartered accountant, Form 4
Dated 15 Oct 2026
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Club house; Schedule end; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Design consultants (Form 6); Fire safety; Environmental clearance.
55.5%
Development · ₹10.05 Cr 44.5%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹22.62 Cr
Estimated cost, engineer's certificate
₹10.05 Cr
Estimated cost, Form 4 Q2 2026-27
₹31.72 Cr
Cost incurred
₹28.60 Cr (90.2% of the Form 4 Q2 2026-27 estimate)
Cost left
₹3.11 Cr
Receivable, sold plots
₹5.53 Cr
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Canara Bank · HOSKOTE
Designated account, collected
₹38.23 Cr in Q2 2026-27
Designated account, withdrawn
₹32.70 Cr in Q2 2026-27 (86% of that quarter's deposits)
Not verified yet: Sold; Sold in the latest quarter; Collected from buyers; Land cost revision; Sold vs unsold; Sold per quarter; K-RERA inventory; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.