Building plan (BDA)Sanctioned 29 May 2025No. BDA/TPA/PRL/1060/2024-25
RERA extensionsNone on the filingFiling read 20 Oct 2026
Land conversionConverted 18 Dec 2024Deputy Commissioner, Bangalore Urban
Permits
Approval letters
Building plan (BDA)
Sanctioned 29 May 2025 · No. BDA/TPA/PRL/1060/2024-25
Power NOC
Filed with the registration
SEIAA
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
The area
Unsold stock nearby
Months to sell unsold stock
Location & risks
What is the location like?
Review1 to review
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedBorewell, Local authority (GRAMA PANCHAYATHI)Declared by the promoter
Metro, operationalabout 6.5 kmWhitefield
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion78%As of Q2 2026-27, promoter's return
Possession, agreement31 Jul 2027Agreement for sale, p. 12
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Receivable, sold plots₹1.15 CrAs of Q2 2026-27
Cost left₹1.63 CrAs of Q2 2026-27
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 29 May 2025
Escrow bank
Canara Bank · HOSKOTE
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
131 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
An honest review after getting our ownership. We saw all the surroundings for almost 2 weeks time & couldn't get much options which are near to main road & ready for construction with this price as we wanted specially in bda approved sites…
AAnkita Chaurasia15 Feb 2026★★★★★
My husband and I visited this project after one of our neighbours, who had purchased a plot in Phase 1, referred us. We were specifically looking for a BDA-approved layout since we have been living in AECS Layout for many years and prefer…
JJitesh Soni15 Feb 2026★★★★★
Finally we signed the agreement of our plot 3 days ago, after doing so much research in this area comparing the nearby plotted development where as no much BDA approved properties are available, even for BMRDAs nearby 3 to 4 KMs quoting 8.5…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sidvin Horizon By The Lake in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Jul 2027
Registration certificates
PRM/KA/RERA/1251/446/PR/040925/008057
Land use
Conversion order
Land conversion
Converted 18 Dec 2024 · Deputy Commissioner, Bangalore Urban
Survey numbers
SY NO 39/1 · SY NO 39/2 · SY NO 39/7 · SY NO 39/8 · SY NO 39/9
Not verified yet: Validity, Fire NOC, Airport height NOC.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
K-RERA inventory
Projects within 4 km, counted
50 (50 with an approximate location)
Plots in them
17,339
Booked
8,920 of 17,339 (51%)
Unsold
8,419
Booked a month, pooled
285 plots
Months to sell, pooled
26 months
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; K-RERA inventory; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Nearest 12 with filed prices; This project vs the nearest with filed prices; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed)
✓Clear
Engineer's certificate, registration
Dated 24 Jul 2025
Chartered accountant's certificate, registration
Dated 25 Jul 2025
Not verified yet: Structure, Structural safety certificate, By component, Internal roads, Club house, Schedule end, What the promoter specified · not an inspection, Specification sheet · brands "or equivalent", Design consultants (Form 6), Fire safety, Environmental clearance.
Land · ₹7.25 Cr 67.7%
Development · ₹3.45 Cr 32.3%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹10.70 Cr
Estimated cost, Form 4 Q2 2026-27
₹16.80 Cr
Cost incurred
₹15.17 Cr (90.3% of the Form 4 Q2 2026-27 estimate)
Cost left
₹1.63 Cr
Receivable, sold plots
₹1.15 Cr
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Canara Bank · HOSKOTE
Designated account, collected
₹22.77 Cr in Q2 2026-27
Designated account, withdrawn
₹61.63 Cr in Q2 2026-27
Escrow account, Q1 2026-27
₹5.20 Cr deposited from sales, ₹5.30 Cr withdrawn
Not verified yet: Sold; Sold in the latest quarter; Collected from buyers; Land cost revision; Sold vs unsold; Sold per quarter; K-RERA inventory; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Borewell, Local authority (GRAMA PANCHAYATHI)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot