Good construction quality and spacious 2 BHK layouts.
Overview
Signature Crest
Overview
Signature Crest
Overview
Signature Crest
Overview
Photo: Signature CrestTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 12 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 12 pages, English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹50.0 L 2.8%
Loan & collateral
| Escrow bank | YES BANK · JP Nagar Bangalore |
|---|
Data room
77 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Good construction quality and spacious 2 BHK layouts.
I am writing this review after living in this society for more than 3 years. I usually avoid posting negative reviews, but I feel future residents should know the realities before making a decision. Based on my experience, here are some…
Very nice residential place with basic amenities, eco-friendly
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
All 48 projects in East Bengaluru → · Signature Dwellings Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Signature Crest in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 5,008 sq m | |
|---|---|---|
| Title deed | Consideration ₹35.2 L · Sy 44/4 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 25 May 2023 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Coevolve Florenza, price locked; Leafy Avenue, price locked.
| Coevolve Florenza | 1.2 km | Locked | |
|---|---|---|---|
| Leafy Delight | about 1.5 km | Locked | |
| Leafy Avenue | 1.7 km | Locked | |
| Vasudharini Nest | about 2.5 km | Locked | |
| Jeevan's Allure | about 4 km | Locked | |
| Royal Nest | about 4.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 4.5 km | Locked | |
| Nambiar District 25 Phase 2 | about 5.5 km | Locked | |
| Inspira Infinity | about 5.5 km | Locked | |
| Suyug's Saffron | 5.8 km | Locked | |
| Sowparnika Olivia Nest | about 6 km | Locked | |
| Poetry Of Earth | 6.0 km | Locked |
| Signature Crest This project | This project is the point the others are measured from | 25 May 2023 | – | Not verified yet |
|---|---|---|---|---|
| Coevolve Florenza | 1.2 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
| Leafy Delight | about 1.5 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
| Leafy Avenue | 1.7 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
| Vasudharini Nest | about 2.5 km | 31 Mar 2028 | 31% (26 of 84) | Locked |
| Jeevan's Allure | about 4 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Royal Nest | about 4.5 km | 30 Jun 2028 | 9% (9 of 104) | Locked |
| Projects within 4 km, counted | 32 (24 with an approximate location) | |
|---|---|---|
| Flats in them | 5,969 | |
| Booked | 2,567 of 5,969 (43%) | |
| Unsold | 3,402 | |
| Booked a month, pooled | 117 flats | |
| Months to sell, pooled | 25 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 5.7 km, Varthur police station |
| Nearest storm drain | 2.9 km to the east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the west, an unnamed tank |
| Schedule end | 30 Dec 2021 | |
|---|---|---|
| RERA completion date | 25 May 2023 | |
| Work began, as filed | 29 May 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹17.70 Cr |
|---|
| Escrow bank | YES BANK · JP Nagar Bangalore |
|---|
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 6 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 7 | |
| With a filed extension or completion | 5 (5 completed, 0 extended) | |
| Average schedule slip | 7 months early |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 7.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.9 km to the east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.5 km, Channasandra | |
| Metro, under construction | 10.8 km, Kodibeesanahalli |
| Kempegowda Airport | 48.1 | 49 | 33.4 |
| MG Road (CBD) | 26.6 | 31 | 21.8 |
| Manyata Tech Park | 30.8 | 36 | 23.8 |
| ITPL, Whitefield | 14.9 | 17 | 10.3 |
| Ecospace, Bellandur ORR | 14.8 | 23 | 12.1 |
| Electronic City Ph 1 | 28.8 | 31 | 14.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |