Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Title deed registered
No. KRI-1-20857-2004-05 · Book 1 · executed 3 Nov 2004
Title deed filed with K-RERA, pp. 1, 6
Approvals
| Building plan (Local Planning Authority) | Sanctioned 31 Dec 2021 · No. 10/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2.05 Cr 58.6%Development · ₹1.45 Cr 41.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 31 Dec 2021 | |
| Escrow bank | Bank of Baroda · Indiranagar Main |
Data room
111 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Signature Grande – II in the interactive atlas
Approval or registration
Khata issued
A Khatha · Revenue Inspector Bidarahalli Hobli · Survey 64
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commisioner, Bangalore Urban District · Survey 64
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan 10/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/041122/005392
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title report dated | 12 Nov 2021 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: EC TILL DATE, 2 pages, English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 20,815 sq m | |
| Extent the filed land schedule names for these survey numbers | 8,094 sq m | |
| Plot area against the filed extent | 2.57 times | |
| Village, hobli and taluk on the KGIS map | J.I.Huskuru, BIDARAHALLI1 hobli, BANGALORE-EAST taluk | |
| Sy. 64: filed extent, KGIS plot | 8,094 sq m, 20,815 sq m |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 64 | |
|---|---|---|
| Land extent, Sy 64 | 2 Acres | |
| Whole survey numbers on the KGIS map | 20,815 sq m (the project holds a share) | |
| Khata | A Khatha · Revenue Inspector Bidarahalli Hobli · 31 Jan 2008 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 64 | 3 | 5 acres 1 gunta | 2 acres | 5 acres 6 guntas | The filing differs by 3 acres 3 guntas | Not read yet |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 30 Aug 2021 · Deputy Commisioner, Bangalore Urban District | |
|---|---|---|
| Survey numbers | 64 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 49 (49 with an approximate location) | |
|---|---|---|
| Plots in them | 17,201 | |
| Booked | 8,832 of 17,201 (51%) | |
| Unsold | 8,369 | |
| Booked a month, pooled | 284 plots | |
| Months to sell, pooled | 26 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 6 km, TRIVENI NAGAR NEAR KR PURAM | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 30 Nov 2022 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 1 Jan 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 21 Mar 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 21 Mar 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹3.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.50 Cr, same as the filing |
| Escrow bank | Bank of Baroda · Indiranagar Main |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | about 11 km, Saraswathi Nagar |
| Kempegowda Airport | 26 | 16 |
| MG Road (CBD) | 24.5 | 19.5 |
| Manyata Tech Park | 24 | 15 |
| ITPL, Whitefield | 13.5 | 9 |
| Ecospace, Bellandur ORR | 24 | 17.5 |
| Electronic City Ph 1 | 39.5 | 26.5 |
| Landfill or waste transfer station | about 2 km to the west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the south, named Kondaspura on OpenStreetMap |