Photo: Sudheer ReddyTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC Bangalore · Survey 71/1
K-RERA filing, land schedule
Approvals
| Building plan (BMRDA) | Sanctioned 14 Dec 2021 · No. LAO/15/2021/22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Location & risks
Construction & progress
Developer
Land · ₹5.20 Cr 63.5%Development · ₹2.99 Cr 36.5%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 14 Dec 2021 | |
| Escrow bank | Union Bank of India · Bhuvaneswari Nagar |
Data room
130 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Nice layout, Many individual homes / villas constructed by people. Outer area but peaceful
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Simhadri Estates in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹1.70 Cr
Title deed filed with K-RERA, pp. 1, 20 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.16 Cr
Title deed filed with K-RERA, pp. 1, 20 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.16 Cr · Sy 71/1, Kasaba hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 19, 23 · See it in Documents
Transfer of the land
Sale deed
Survey 71/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan LAO/15/2021/22
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · Survey 71/1
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/160622/004991
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: Latest EC, 4 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 57,890 sq m | |
| Extent the filed land schedule names for these survey numbers | 18,110 sq m | |
| Plot area against the filed extent | 3.2 times | |
| Village, hobli and taluk on the KGIS map | Muttugatti, KASABA2 hobli, ANEKAL taluk | |
| Sy. 71/1: filed extent, KGIS plot | 18,110 sq m, 57,890 sq m | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 71/1 | |
|---|---|---|
| Land extent, Sy 71/1 | 4 Acres 19 Guntas | |
| Whole survey numbers on the KGIS map | 57,890 sq m (the project holds a share) | |
| Khata | A Khatha · 3 Jan 2022 | |
| Sale deed | Dated 2 Jul 2021 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 71/1 | 7 | 4 acres 19 guntas | 4 acres 19 guntas | 14 acres 12 guntas | The map differs by 9 acres 33 guntas | 0 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 20 May 2022 |
| Land conversion | Converted 23 Jun 2016 · DC Bangalore | |
|---|---|---|
| Survey numbers | 71/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Plots in them | 80 |
|---|
| Booked | 6 of 80 (8%) |
|---|
| Unsold | 74 |
|---|
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 21 km, G K LAYOUT | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| RERA completion date | 20 May 2022 | |
|---|---|---|
| Work began, as filed | 14 Jul 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹8.19 Cr |
|---|
| Escrow bank | Union Bank of India · Bhuvaneswari Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Anekal) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 14 km, Bommasandra | |
| Metro, under construction | about 23.5 km, Kalena Agrahara |
| Kempegowda Airport | 71 | 56 |
| MG Road (CBD) | 41 | 33.5 |
| Manyata Tech Park | 47 | 40.5 |
| ITPL, Whitefield | 40.5 | 32.5 |
| Ecospace, Bellandur ORR | 31.5 | 26 |
| Electronic City Ph 1 | 19 | 16.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |