Overview
Sirimane Serenity Phase-3
Overview
Sirimane Serenity Phase-3
Overview
Sirimane Serenity Phase-3
Overview
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 78 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sirimane Serenity Phase-3 in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 217 | |
| Booked | 115 of 217 (53%) | |
| Unsold | 102 | |
| Booked a month, pooled | 0 plots | |
| Months to sell, pooled | 230 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 7.5 km, Shambhavinagar |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 6 km, Madavara | |
| Metro, under construction | about 18.5 km, Jakkur Cross |
| Landfill or waste transfer station |
|---|
| Kempegowda Airport | 47.5 | 33.5 |
| MG Road (CBD) | 26 | 22.5 |
| Manyata Tech Park | 25 | 22 |
| ITPL, Whitefield | 40.5 | 35.5 |
| Ecospace, Bellandur ORR | 39.5 | 33 |
| Electronic City Ph 1 | 51.5 | 38.5 |
| None within 3 km |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2.5 km to the west, named Nelamangala Substation on OpenStreetMap |
|---|