Best place to live walkable distance to many office kids schools are very near by
Overview
Sjr Residency
Overview
Sjr Residency
Overview
Sjr Residency
Overview
Photo: Abhishek KumarBest place to live walkable distance to many office kids schools are very near by
Wonderful apartment with all amenities and good people.
Do we have vacancies in this apartment for rent (family) ?
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| AcaciaCompleted · OC 17-03-2021 | M/s.SSVR Builders & Developers | Apartment | – | Completed |
| Adarsh Parkland | Adarsh Developers | Apartment | 1,475–1,850 sqft | Mar 2030 |
| Adarsh Parkland Phase 2Active · 6% built | SHIVAKAR INFRA PRIVATE LIMITED | Apartment | 250–1,222 sqft carpet (as filed) | Mar 2030 |
| Bhuvi By AmshaCompleted · OC 30-05-2020 | Amsha Ventures | Apartment | 969 sqft carpet (as filed) | Completed |
| Butterfly AvenueCompleted (regulator flag) | TERRA GOLD VENTURES | Plot | ~600–1,610 sqft (estimate: filed carpet plus 25%) | Completed |
| Cansa DhiyaCompleted · OC 08-07-2020 | Kansa Properties LLP | Apartment | – | Completed |
| D C Capitol Phase – II |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain |
|---|
Construction & progress
Developer
Loan & collateral
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| D.C.HI-RISE LLP |
| Apartment |
| 769–989 sqft carpet (as filed) |
| Dec 2028 |
| Dc CapitolCompleted · OC 29-03-2022 | D C HI RISE LLP | Apartment | 769–990 sqft carpet (as filed) | Completed |
8 of 26 other projects in Panathur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Sjr Residency is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 0.5 km, to a locality centre | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 0.5 km, to a locality centre | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 0.5 km, to a locality centre | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 0.5 km, to a locality centre | Locked |
|---|
| SOBHA Neopolis | about 0.5 km, to a locality centre | Locked |
|---|
| Adarsh Parkland | about 1 km, to a locality centre | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 1.5 km, to a locality centre | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 1.5 km, to a locality centre | Locked |
|---|
| SOBHA Ayana | about 1.5 km, to a locality centre | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 1.5 km, to a locality centre | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km, to a locality centre | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km, to a locality centre | Locked |
|---|
| Sjr Residency This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 0.5 km, to a locality centre | 31 Dec 2030 | 98% (220 of 225) | Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 0.5 km, to a locality centre | 31 Dec 2031 | 96% (289 of 302) | Locked |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 0.5 km, to a locality centre | 31 Dec 2029 | 90% (335 of 374) | Locked |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 0.5 km, to a locality centre | 31 Dec 2031 | 85% (319 of 374) | Locked |
| SOBHA Neopolis | about 0.5 km, to a locality centre | 31 Dec 2028 | 95% (570 of 600) | Locked |
| Adarsh Parkland | about 1 km, to a locality centre | – | – | Locked |
| Nearest lake, tank or pond | about 0.5 km from the locality centre, Panathur Lake |
|---|
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre, named Sobha Dream Acres Substation on OpenStreetMap |
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, tertiary drain |
|---|