18 Feb 2010in favour of SNN Builders Private Limited
24 Mar 2022
Approvals
Is it approved for its use?
Clear1 clear
Building plan (BBMP)Sanctioned 2 Jan 2020No. BBMP/Addl.Dir/JD (SOUTH)/LP/0077/10-11
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 12 of 12 parcelsDates and authorities below
Permits
Approval letters
Building plan (BBMP)
Sanctioned 2 Jan 2020 · No. BBMP/Addl.Dir/JD (SOUTH)/LP/0077/10-11
Power NOC
Filed with the registration
Fire NOC
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedBorewell, BWSSB, OtherDeclared by the promoter
Metro, operational4.5 kmSingasnadra
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion98%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Receivable, sold flats₹143.15 CrAs of Q2 2026-27
Cost left₹76.16 CrAs of Q2 2026-27
Sold531 / 594✓ClearClear
Sold in Q2 2026-2714✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 2 Jan 2020
Escrow bank
STATE BANK OF INDIA · SME Jayanagar
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
225 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Consideration ₹17.3 L · Sy 42/5; 42/1, Yelenahalli village, Bengaluru South taluk; Sy 41/7; 41/5, Yelenahalli village, Begur hobli, Bengaluru South taluk
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Court-case search; High Court order; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Type-a4 2BHK · avg 74 m² 13.1%Type-a1 2BHK · avg 65 m² 7.1%Type-c1 3BHK · avg 92 m² 7.1%Type-b1 2.5BHK · avg 79 m² 7.1%15 other types 65.7%
Unit types
Type-a1 2BHK
42
29,342
Type-a2 2BHK
14
9,989
Type-a3 2BHK
13
8,536
TYPE-A3a 1BHK
1
484
Type-a4 2BHK
78
61,925
TYPE-A4a 2BHK
6
4,349
Type-b1 2.5BHK
42
35,855
Type-b2 2.5BHK
42
38,815
Type-b3 2.5BHK
42
35,790
Type-b4 2.5BHK
42
36,404
Type-c1 3BHK
42
41,527
Type-c2 3BHK
40
41,010
Type-d1 3BHK
42
48,039
Type-d2 3BHK
40
45,424
Type-e1 3.5BHK
27
35,779
Type-e2 3.5BHK
25
33,411
TYPE-E2a 2.5BHK
2
2,357
Type-f1 4BHK
27
39,870
Type-f2 4BHK
27
40,096
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
531 / 594
Unsold, Q2 2026-27
63
Months to sell, derived from filed bookings
14 months
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Azur Tower D, price locked; Lodha Azur, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked; K&T's Sai Sannidhi, price locked; Mahindra NewHaven, price locked; Mahindra Zen, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Estimated cost, architect's and engineer's certificates
₹251.13 Cr
Estimated cost, Form 4 Q2 2026-27
₹464.97 Cr
Cost incurred
₹388.81 Cr (83.6% of the Form 4 Q2 2026-27 estimate)
Cost left
₹76.16 Cr
Receivable, sold flats
₹143.15 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (531) 89.4%Unsold (63) 10.6%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
489 / 594 · 105 available
Sold, Q4 2025-26
504 / 594 · 90 available
Sold, Q1 2026-27
517 / 594 · 77 available
Sold, Q2 2026-27
531 / 594 · 63 available
Unsold, Q2 2026-27
63
Sold in Q4 2025-26
15
Sold in Q1 2026-27
13
Sold in Q2 2026-27
14
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
STATE BANK OF INDIA · SME Jayanagar
Designated account, collected
₹0 in Q2 2026-27
Designated account, withdrawn
₹0 in Q2 2026-27
Track record
DOSL builder track
K-RERA registrations under this promoter
10
Marked completed
4
Past promised date, not completed
1
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q1 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB, Other
Nearest city water main
110 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.