Overview
Sobha Rajvilas
Overview
Sobha Rajvilas
Overview
Sobha Rajvilas
Overview
Title & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/829/2019 | Clear |
| Environmental clearance | issued 4 Jul 2015 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹80.10 Cr
Loan & collateral
| Escrow bank | Axis Bank · No. 9, M. G. Road, Block A, Bangalorecdsfcsef |
|---|
Data room
74 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Rajvilas in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2025 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Birla Tisya, price locked.
| Vista Padmalaya | about 1.5 km | Locked | |
|---|---|---|---|
| Birla Tisya | 2.6 km | Locked | |
| Renaissance Srichakra | about 3 km | Locked | |
| Vista Svara | about 4 km | Locked | |
| Magnolia Delight | about 6.5 km | Locked | |
| Royal Enclave | about 6.5 km | Locked | |
| Adarsh Premia | 6.9 km | Locked | |
| Sobha Royal Crest | about 7.5 km | Locked | |
| Ranka Iris | about 8.5 km | Locked | |
| Sumadhura Pramoda | about 8.5 km | Locked | |
| Song Of Wind | about 8.5 km | Locked | |
| Garden Square | 9.3 km | Locked |
| Sobha Rajvilas This project | This project is the point the others are measured from | 30 Mar 2025 | – | Not verified yet |
|---|---|---|---|---|
| Vista Padmalaya | about 1.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Birla Tisya | 2.6 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Renaissance Srichakra | about 3 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Vista Svara | about 4 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Magnolia Delight | about 6.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Royal Enclave | about 6.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rent, 3BHK, 3 km | ₹50,000 /mo · 33 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹25,000 /mo · 63 listings | |
| Rent, 1BHK, 3 km | ₹12,750 /mo · 66 listings | |
| Rent per sq ft, 3 km | ₹26.7 /mo, as listed · 64 listings with a size |
| Projects within 4 km, counted | 18 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 1,759 | |
| Booked | 1,478 of 1,759 (84%) | |
| Unsold | 281 | |
| Booked a month, pooled | 13 flats | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest government-flagged flood location | 500 m, Minerva Mill |
| Nearest storm drain | 70 m to the east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 60 m to the south-east, an unnamed water body |
| Completed, occupancy certificate 8 Jul 2024 |
| Schedule end | 30 Jun 2024 | |
|---|---|---|
| RERA completion date | 30 Mar 2025 | |
| Work began, as filed | 22 Oct 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/829/2019 | |
|---|---|---|
| Environmental clearance | issued 4 Jul 2015 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹201.33 Cr |
|---|
Sold (160) 100%
| Flats sold, at completion | 160 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 160 |
| Escrow bank | Axis Bank · No. 9, M. G. Road, Block A, Bangalorecdsfcsef |
|---|
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 64 (57 completed, 7 extended) | |
| Average schedule slip | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| RITEWAY & KUBERA PROMOTERS |
| Plot |
| ~1,200–2,400 sqft (estimate: filed carpet plus 25%) |
| Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 70 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 70 m to the east, secondary drain | |
|---|---|---|
| Ground level | 885 m above sea level, plus or minus 4 m | |
| Metro, operational | 890 m, Kranthivira Sangoli Rayanna Railway Station | |
| Metro, under construction | 4.5 km, Shivaji Nagar |
| Kempegowda Airport | 36.3 | 39 | 28.8 |
| MG Road (CBD) | 6.5 | 8 | 4.4 |
| Manyata Tech Park | 13.8 | 17 | 9.5 |
| ITPL, Whitefield | 23.7 | 26 | 19.0 |
| Ecospace, Bellandur ORR | 19.3 | 26 | 14.4 |
| Electronic City Ph 1 | 23.6 | 30 | 20.3 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 200 m to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 160 m to the south-east |