Not verified yet: Recent price, super built-up; Gross yield; Central Bengaluru, past year; Price paid per sq ft, super built-up.
Deputy Commissioner, Bangalore
22 Sep 2011A Khatha · BBMP
8/2 24 Dec 2003Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 1 Acre 20 Guntas
Survey 9 9/10, 9/11, 9/12 2 Jun 2009Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 12 Guntas + 12 Guntas + 9 Guntas 9/13 25 May 2009Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 9 Guntas 9/14 2 Jun 2009Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 9 Guntas 9/15 24 Dec 2003Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 17 Guntas 9/16 2 Jun 2009Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 9 Guntas
10 24 Dec 2003Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 13 Guntas
55 2 Jun 2009Deputy Commissioner, Bangalore No sale deed 22 Sep 2011A Khatha · BBMP 29 Guntas
K-RERA filing, land schedule
The whole project
26 Nov 2014 Title check
Records searched up to this date
Encumbrance certificate, p. 5 · See it in Documents
17 Oct 2023 Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0013/22-23
K-RERA filing, approvals
3 Aug 2024 Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/030824/006956
K-RERA registration · Open on the regulator's site
Approval or registration Title check
Read from the original document Described in the filing or another document; the original is not read here
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
KSFES/NOC/223/2021 · issued 14 Dec 2021 ✓ Clear
Environmental clearance SEIAA 142 CON 2020 · issued 5 Aug 2021 ✓ Clear
Airport height NOC Filed with the registration
Pollution board (CFE) Filed with the registration
Water and sewerage NOC (BWSSB) issued 29 Nov 2021
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/030824/006956 Not verified yet: Validity.
•••••
Unlock this full report ₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Sobha Sterling Infinia's developer filed before you say yes.
× Sobha Sterling Infinia
Sobha Ltd · Koramangala
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
3BHK · avg 118 m² 97.8%
4BHK · 139 m² 2.2%
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 231 listings 1BHK: median ₹22,500 /mo over 231 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹22,500 /mo 2BHK · 397 listings 2BHK: median ₹40,000 /mo over 397 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹40,000 /mo 3BHK · 262 listings 3BHK: median ₹72,000 /mo over 262 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹72,000 /mo 4BHK · 22 listings 4BHK: median ₹98,000 /mo over 22 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹98,000 /mo 5+BHK · 9 listings 5+BHK: median ₹1,08,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹1,08,000 /mo
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 1,740 unsold flats ÷ 53 booked a month across 27 projects 33 months Sobha Infinia…nd Block 3 W2 Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2, about 0.5 km: 112 unsold ÷ 10 booked in 9 months 101 months Signature 4 Signature 4, 970 m: 7 unsold ÷ 5 booked in 9 months 13 months Radiance Platinum Radiance Platinum, 1.1 km: 1 unsold ÷ 18 booked in 9 months 1 months Jeya Green Horizon Jeya Green Horizon, about 2 km: 101 unsold ÷ 19 booked in 6 months 32 months Manikchand Sva…pring Phase 2 Manikchand Svamitva Soulspring Phase 2, about 2.5 km: 101 unsold ÷ 43 booked in 9 months 21 months
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; Central Bengaluru, past year; Bengaluru, past year; Central Bengaluru since 2022; This project vs Central Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
3.0 km Bommanahalli
Around it Water Groundwater, Bengaluru South taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru South: 23.2 m Bengaluru South taluk average, July 2023 16.9 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant.
100% Q3 2025-26: 11% 11% Q3 2025-26 Q4 2025-26: 20% 20% Q4 2025-26 Q1 2026-27: 39% 39% Q1 2026-27 Q2 2026-27: 42% 42% Q2 2026-27 0% 50% 100% Q3 2025-26: 11% 11% Q3 2025-26 Q4 2025-26: 20% 20% Q4 2025-26 Q1 2026-27: 39% 39% Q1 2026-27 Q2 2026-27: 42% 42% Q2 2026-27 0% 50% 100% Q3 2025-26: 11% 11% Q3 2025-26 Q4 2025-26: 20% 20% Q4 2025-26 Q1 2026-27: 39% 39% Q1 2026-27 Q2 2026-27: 42% 42% Q2 2026-27 0% 50% 100% Q3 2025-26: 11% 11% Q3 2025-26 Q4 2025-26: 20% 20% Q4 2025-26 Q1 2026-27: 39% 39% Q1 2026-27 Q2 2026-27: 42% 42% Q2 2026-27 As the promoter reported it
Work left By component, Q2 2026-27 Tower PHASE 2A (WING 5) Tower PHASE 2A (WING 5): 25% 25% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Main structure Main structure: 45% 45% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Fire protection and fire safety requirements Not started Parks & Tree planting Not started Sewage and Drainage System Not started Solid waste management and disposal, external Not started Storm water drains Not started Water Supply, external Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Basic work of Water supply, Sanitary and Electrification Not started Plastering inside, outside & Ceiling Not started Railing and Grill fixing Not started Solid waste management and disposal, internal Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharg e of ground water Not started Common entrance and exit for the building/common portico/foyer/vera ndah Not started Corridor/Lobbies Not started Provision for lodging of management staff and security staff Not started Staircases Not started Terrace Not started
Tower PHASE 2A (WING 5) Tower PHASE 2A (WING 5): 25% 25% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Main structure Main structure: 45% 45% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started
Tower PHASE 2A (WING 5) Tower PHASE 2A (WING 5): 25% 25% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Main structure Main structure: 45% 45% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started
Tower PHASE 2A (WING 5) Tower PHASE 2A (WING 5): 25% 25% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Main structure Main structure: 45% 45% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started
Quarterly return, Q2 2026-27 Dates Dates 2025 2027 2029 Work began 1 Nov 2024 As of 18 Nov 2026 RERA deadline 30 Jun 2030 Builder's schedule ends 30 Jun 2030 Work began: 1 Nov 2024 As of 18 Nov 2026 RERA deadline: 30 Jun 2030 Builder's schedule ends: 30 Jun 2030
2025 2026 2027 2028 2029 2030 Work began 1 Nov 2024 As of 18 Nov 2026 RERA deadline 30 Jun 2030 Builder's schedule ends 30 Jun 2030 Work began: 1 Nov 2024 As of 18 Nov 2026 RERA deadline: 30 Jun 2030 Builder's schedule ends: 30 Jun 2030
2025 2026 2027 2028 2029 2030 Work began 1 Nov 2024 As of 18 Nov 2026 RERA deadline 30 Jun 2030 Builder's schedule ends 30 Jun 2030 Work began: 1 Nov 2024 As of 18 Nov 2026 RERA deadline: 30 Jun 2030 Builder's schedule ends: 30 Jun 2030
2025 2026 2027 2028 2029 2030 Work began 1 Nov 2024 As of 18 Nov 2026 RERA deadline 30 Jun 2030 Builder's schedule ends 30 Jun 2030 Work began: 1 Nov 2024 As of 18 Nov 2026 RERA deadline: 30 Jun 2030 Builder's schedule ends: 30 Jun 2030
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹58.85 Cr: 49.4% Development · ₹60.34 Cr: 50.6% ₹119 Cr estimated cost Land · ₹58.85 Cr 49.4% Development · ₹60.34 Cr 50.6%
Sales Sold vs unsold, Q2 2026-27 Sold (20): 43.5% Unsold (26): 56.5% 43% 46 flats Sold (20) 43.5% Unsold (26) 56.5%
Sold per quarter Q4 2025-26 Q4 2025-26: booked flats went from 10 to 17 7 flats Q1 2026-27 Q1 2026-27: booked flats went from 17 to 18 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 18 to 20 2 flats
Q4 2025-26 Q4 2025-26: booked flats went from 10 to 17 7 flats Q1 2026-27 Q1 2026-27: booked flats went from 17 to 18 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 18 to 20 2 flats
Q4 2025-26 Q4 2025-26: booked flats went from 10 to 17 7 flats Q1 2026-27 Q1 2026-27: booked flats went from 17 to 18 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 18 to 20 2 flats
Q4 2025-26 Q4 2025-26: booked flats went from 10 to 17 7 flats Q1 2026-27 Q1 2026-27: booked flats went from 17 to 18 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 18 to 20 2 flats
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹5.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹5.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹5.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹5.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹5.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹5.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹5.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹5.71 Cr
Track record Average schedule slip This promoter, 65 other phases 58 completed and 7 extended: each filed date against the completion first promised 12 months Median of 1,753 phases Every phase in the corpus whose filing gives an extension or a completion 9 months
This promoter, 65 other phases 58 completed and 7 extended: each filed date against the completion first promised 12 months Median of 1,753 phases Every phase in the corpus whose filing gives an extension or a completion 9 months
This promoter, 65 other phases 58 completed and 7 extended: each filed date against the completion first promised 12 months Median of 1,753 phases Every phase in the corpus whose filing gives an extension or a completion 9 months
This promoter, 65 other phases 58 completed and 7 extended: each filed date against the completion first promised 12 months Median of 1,753 phases Every phase in the corpus whose filing gives an extension or a completion 9 months
Not verified yet: Receivable, sold flats; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Stage Progress as reported, by quarter Q3 2025-26 Q3 2025-26: 11% built, as the promoter reported it 11% Q4 2025-26 Q4 2025-26: 20% built, as the promoter reported it 20% Q1 2026-27 Q1 2026-27: 39% built, as the promoter reported it 39% Q2 2026-27 Q2 2026-27: 42% built, as the promoter reported it 42%
Q3 2025-26 Q3 2025-26: 11% built, as the promoter reported it 11% Q4 2025-26 Q4 2025-26: 20% built, as the promoter reported it 20% Q1 2026-27 Q1 2026-27: 39% built, as the promoter reported it 39% Q2 2026-27 Q2 2026-27: 42% built, as the promoter reported it 42%
Q3 2025-26 Q3 2025-26: 11% built, as the promoter reported it 11% Q4 2025-26 Q4 2025-26: 20% built, as the promoter reported it 20% Q1 2026-27 Q1 2026-27: 39% built, as the promoter reported it 39% Q2 2026-27 Q2 2026-27: 42% built, as the promoter reported it 42%
Q3 2025-26 Q3 2025-26: 11% built, as the promoter reported it 11% Q4 2025-26 Q4 2025-26: 20% built, as the promoter reported it 20% Q1 2026-27 Q1 2026-27: 39% built, as the promoter reported it 39% Q2 2026-27 Q2 2026-27: 42% built, as the promoter reported it 42%
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Doddakannelli Garebhavipalya NH service road junction Oxford college NH Junction Anugraha layout RSD phase 1 Dollars Colony JP Nagar Dollars Colony NS palya (BTM 2nd stage) Hongasandara Ambedkar Nagar NS palya RSD HSR sector 2 Garden layout HSR 3rd sector lead off drains Sector 6 lead off drains surrounding 5th and 9th main BTM layout Hosur road Jayadeva flyover to Udupi Garden Signal Silk Board junction Silk Board Bannerghatta road near Oakyard Apartment Gurappanapalya Banneragatta main road Tavarekere Main road Bellandur Bannerghatta Road near spar super market Koramangala 4 th block ST Bed Koramangala 1 km 3 km 2 km Agara · 860 m Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The siteGreen Fontana Lapsed · completion date passed GREEN CARS PVT LTD Apartment – Dec 2019
Hamiton Towers Completed · OC 12-02-2024 Pelagsus Infrastructures Pvt Ltd Apartment 2,160 sqft carpet (as filed) Completed
Other projects in Koramangala, A to Z
8 of 23 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
143 65 63 8 65 66 15 7 21 6 2 9 64 64 13 3 58 53 64 24 16 17 67 14 63 48 6 19 50 56 47 1 3 54 18 10 55 57 20 45 12 51 5 46 250 m Individual
Share as printed, Sy 9/11 46
Owner as printed, Sy 9/11 ████████
Owner kind, Sy 9/12 Individual
Share as printed, Sy 9/12 46
Owner as printed, Sy 9/12 ████████
Owner kind, Sy 9/13 Individual
Share as printed, Sy 9/13 46
Owner as printed, Sy 9/13 ████████
Owner kind, Sy 9/14 Individual
Share as printed, Sy 9/14 46
Owner as printed, Sy 9/14 ████████
Owner kind, Sy 9/15 Individual
Share as printed, Sy 9/15 46
Owner as printed, Sy 9/15 ████████
Owner kind, Sy 9/16 Individual
Share as printed, Sy 9/16 46
Owner as printed, Sy 9/16 ████████
Owner kind, Sy 10 Individual
Share as printed, Sy 10 46
Owner as printed, Sy 10 ████████
Owner kind, Sy 55 Individual
Share as printed, Sy 55 46
Owner as printed, Sy 55 ████████
Land area of this registration 2,190 sq m
Khata A Khatha · BBMP · 22 Sep 2011
Title deed Bangalore South taluk
Title deed Consideration ₹8.5 L · Sy 9/10, Agara village, Begur hobli, Bangalore South taluk · 0 acres 12 guntas
1BHK · 231 listings 1BHK: median ₹22,500 /mo over 231 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹22,500 /mo 2BHK · 397 listings 2BHK: median ₹40,000 /mo over 397 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹40,000 /mo 3BHK · 262 listings 3BHK: median ₹72,000 /mo over 262 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹72,000 /mo 4BHK · 22 listings 4BHK: median ₹98,000 /mo over 22 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹98,000 /mo 5+BHK · 9 listings 5+BHK: median ₹1,08,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹1,08,000 /mo 1BHK · 231 listings 1BHK: median ₹22,500 /mo over 231 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹22,500 /mo 2BHK · 397 listings 2BHK: median ₹40,000 /mo over 397 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹40,000 /mo 3BHK · 262 listings 3BHK: median ₹72,000 /mo over 262 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹72,000 /mo 4BHK · 22 listings 4BHK: median ₹98,000 /mo over 22 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹98,000 /mo 5+BHK · 9 listings 5+BHK: median ₹1,08,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹1,08,000 /mo
1BHK · 231 listings 1BHK: median ₹22,500 /mo over 231 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹22,500 /mo 2BHK · 397 listings 2BHK: median ₹40,000 /mo over 397 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹40,000 /mo 3BHK · 262 listings 3BHK: median ₹72,000 /mo over 262 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹72,000 /mo 4BHK · 22 listings 4BHK: median ₹98,000 /mo over 22 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹98,000 /mo 5+BHK · 9 listings 5+BHK: median ₹1,08,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹1,08,000 /mo
Soulspring Phase 1 Soulspring Phase 1, about 2.5 km: 62 unsold ÷ 24 booked in 9 months 23 months Within 4 km, pooled 1,740 unsold flats ÷ 53 booked a month across 27 projects 33 months Sobha Infinia…nd Block 3 W2 Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2, about 0.5 km: 112 unsold ÷ 10 booked in 9 months 101 months Signature 4 Signature 4, 970 m: 7 unsold ÷ 5 booked in 9 months 13 months Radiance Platinum Radiance Platinum, 1.1 km: 1 unsold ÷ 18 booked in 9 months 1 months Jeya Green Horizon Jeya Green Horizon, about 2 km: 101 unsold ÷ 19 booked in 6 months 32 months Manikchand Sva…pring Phase 2 Manikchand Svamitva Soulspring Phase 2, about 2.5 km: 101 unsold ÷ 43 booked in 9 months 21 months Soulspring Phase 1 Soulspring Phase 1, about 2.5 km: 62 unsold ÷ 24 booked in 9 months 23 months
Within 4 km, pooled 1,740 unsold flats ÷ 53 booked a month across 27 projects 33 months Sobha Infinia…nd Block 3 W2 Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2, about 0.5 km: 112 unsold ÷ 10 booked in 9 months 101 months Signature 4 Signature 4, 970 m: 7 unsold ÷ 5 booked in 9 months 13 months Radiance Platinum Radiance Platinum, 1.1 km: 1 unsold ÷ 18 booked in 9 months 1 months Jeya Green Horizon Jeya Green Horizon, about 2 km: 101 unsold ÷ 19 booked in 6 months 32 months Manikchand Sva…pring Phase 2 Manikchand Svamitva Soulspring Phase 2, about 2.5 km: 101 unsold ÷ 43 booked in 9 months 21 months Soulspring Phase 1 Soulspring Phase 1, about 2.5 km: 62 unsold ÷ 24 booked in 9 months 23 months
Within 4 km, pooled 1,740 unsold flats ÷ 53 booked a month across 27 projects 33 months Sobha Infinia…nd Block 3 W2 Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2, about 0.5 km: 112 unsold ÷ 10 booked in 9 months 101 months Signature 4 Signature 4, 970 m: 7 unsold ÷ 5 booked in 9 months 13 months Radiance Platinum Radiance Platinum, 1.1 km: 1 unsold ÷ 18 booked in 9 months 1 months Jeya Green Horizon Jeya Green Horizon, about 2 km: 101 unsold ÷ 19 booked in 6 months 32 months Manikchand Sva…pring Phase 2 Manikchand Svamitva Soulspring Phase 2, about 2.5 km: 101 unsold ÷ 43 booked in 9 months 21 months Soulspring Phase 1 Soulspring Phase 1, about 2.5 km: 62 unsold ÷ 24 booked in 9 months 23 months
250 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Lake or tank Storm drain, smaller The site20 to 40 Ten-year July mean for Bengaluru South: 23.2 m Bengaluru South taluk average, July 2023 16.9 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru South: 23.2 m Bengaluru South taluk average, July 2023 16.9 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru South: 23.2 m Bengaluru South taluk average, July 2023 16.9 m below ground Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 42.6 km by road 42.6 km MG Road (CBD) MG Road (CBD): 10.3 km by road 10.3 km Manyata Tech Park Manyata Tech Park: 18.9 km by road 18.9 km ITPL, Whitefield ITPL, Whitefield: 17.6 km by road 17.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 5.1 km by road 5.1 km Electronic City Ph 1 Electronic City Ph 1: 12.6 km by road 12.6 km
Kempegowda Airport Kempegowda Airport: 42.6 km by road 42.6 km MG Road (CBD) MG Road (CBD): 10.3 km by road 10.3 km Manyata Tech Park Manyata Tech Park: 18.9 km by road 18.9 km ITPL, Whitefield ITPL, Whitefield: 17.6 km by road 17.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 5.1 km by road 5.1 km Electronic City Ph 1 Electronic City Ph 1: 12.6 km by road 12.6 km
Kempegowda Airport Kempegowda Airport: 42.6 km by road 42.6 km MG Road (CBD) MG Road (CBD): 10.3 km by road 10.3 km Manyata Tech Park Manyata Tech Park: 18.9 km by road 18.9 km ITPL, Whitefield ITPL, Whitefield: 17.6 km by road 17.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 5.1 km by road 5.1 km Electronic City Ph 1 Electronic City Ph 1: 12.6 km by road 12.6 km
Kempegowda Airport Kempegowda Airport: 42.6 km by road 42.6 km MG Road (CBD) MG Road (CBD): 10.3 km by road 10.3 km Manyata Tech Park Manyata Tech Park: 18.9 km by road 18.9 km ITPL, Whitefield ITPL, Whitefield: 17.6 km by road 17.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 5.1 km by road 5.1 km Electronic City Ph 1 Electronic City Ph 1: 12.6 km by road 12.6 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Electrical substation Electrical substation: 980 m 980 m Sewage treatment plant Sewage treatment plant: 1.3 km, Agaram 35MLD Sewage Treatment Plant 1.3 km Landfill or waste station Landfill or waste station: 2.4 km 2.4 km
Electrical substation Electrical substation: 980 m 980 m Sewage treatment plant Sewage treatment plant: 1.3 km, Agaram 35MLD Sewage Treatment Plant 1.3 km Landfill or waste station Landfill or waste station: 2.4 km 2.4 km
Electrical substation Electrical substation: 980 m 980 m Sewage treatment plant Sewage treatment plant: 1.3 km, Agaram 35MLD Sewage Treatment Plant 1.3 km Landfill or waste station Landfill or waste station: 2.4 km 2.4 km
Electrical substation Electrical substation: 980 m 980 m Sewage treatment plant Sewage treatment plant: 1.3 km, Agaram 35MLD Sewage Treatment Plant 1.3 km Landfill or waste station Landfill or waste station: 2.4 km 2.4 km
Power Backup Not started Water and Sanitation Not started Fire protection and fire safety requirements Not started Parks & Tree planting Not started Sewage and Drainage System Not started Solid waste management and disposal, external Not started Storm water drains Not started Water Supply, external Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Basic work of Water supply, Sanitary and Electrification Not started Plastering inside, outside & Ceiling Not started Railing and Grill fixing Not started Solid waste management and disposal, internal Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Corridor/Lobbies Not started Provision for lodging of management staff and security staff Not started Staircases Not started Terrace Not started Power Backup Not started Water and Sanitation Not started Fire protection and fire safety requirements Not started Parks & Tree planting Not started Sewage and Drainage System Not started Solid waste management and disposal, external Not started Storm water drains Not started Water Supply, external Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Basic work of Water supply, Sanitary and Electrification Not started Plastering inside, outside & Ceiling Not started Railing and Grill fixing Not started Solid waste management and disposal, internal Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Corridor/Lobbies Not started Provision for lodging of management staff and security staff Not started Staircases Not started Terrace Not started Power Backup Not started Water and Sanitation Not started Fire protection and fire safety requirements Not started Parks & Tree planting Not started Sewage and Drainage System Not started Solid waste management and disposal, external Not started Storm water drains Not started Water Supply, external Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Basic work of Water supply, Sanitary and Electrification Not started Plastering inside, outside & Ceiling Not started Railing and Grill fixing Not started Solid waste management and disposal, internal Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Corridor/Lobbies Not started Provision for lodging of management staff and security staff Not started Staircases Not started Terrace Not started Sony Signal to Maharaja signal in Koramangala Ejipura Ashwini layout Rajendra Nagar slum opp KPWD quarters S G R Dental college Ejipura opp army land Anepalya junction JK Pura Anepalya Gajendranagar SWD surroundings Wilson garden PWD quarters Krishnappa Garden behind Byrasandra Tank D/s Wilson Garden Area up to Bannerghatta Road Bismillanagar, Agencies Ejipura Koramangala Slum NGV to HSR Layout HAL Airport Road K R Garden NGV to HSR Layout bismillanagar SOMESHWARA COLONY NEAR SILK BOARD JUNCTION MARUTHI NAGAR, SANKRAPPA LAYOUT VENKATAREDDY NAGAR, SIDDAPURA PWD QUARTERS NEAR WISLSON GARDEN ASHWINI LAYOUT EJIPURA LAKSHMAN RAO NAGARA SJR DENTAL COLLEGE MAIN ROAD SRINIVAGILU TANK BED LAYOUT MUNISUBBAREDDY LAYOUT HONGASANDRA MUNIREDDY LAYOUT NEAR MANGAMMNAPALYA Doddakannelli Garebhavipalya NH service road junction Oxford college NH Junction Anugraha layout RSD phase 1 Dollars Colony JP Nagar Dollars Colony NS palya (BTM 2nd stage) Hongasandara Ambedkar Nagar NS palya RSD HSR sector 2 Garden layout HSR 3rd sector lead off drains Sector 6 lead off drains surrounding 5th and 9th main BTM layout Hosur road Jayadeva flyover to Udupi Garden Signal Silk Board junction Silk Board Bannerghatta road near Oakyard Apartment Gurappanapalya Banneragatta main road Tavarekere Main road Bellandur Bannerghatta Road near spar super market Koramangala 4 th block ST Bed Koramangala Sony Signal to Maharaja signal in Koramangala Ejipura Ashwini layout Rajendra Nagar slum opp KPWD quarters S G R Dental college Ejipura opp army land Anepalya junction JK Pura Anepalya Gajendranagar SWD surroundings Wilson garden PWD quarters Krishnappa Garden behind Byrasandra Tank D/s Wilson Garden Area up to Bannerghatta Road Bismillanagar, Agencies Ejipura Koramangala Slum NGV to HSR Layout HAL Airport Road K R Garden NGV to HSR Layout bismillanagar SOMESHWARA COLONY NEAR SILK BOARD JUNCTION MARUTHI NAGAR, SANKRAPPA LAYOUT VENKATAREDDY NAGAR, SIDDAPURA PWD QUARTERS NEAR WISLSON GARDEN ASHWINI LAYOUT EJIPURA LAKSHMAN RAO NAGARA SJR DENTAL COLLEGE MAIN ROAD SRINIVAGILU TANK BED LAYOUT MUNISUBBAREDDY LAYOUT HONGASANDRA MUNIREDDY LAYOUT NEAR MANGAMMNAPALYA 1 km 3 km 2 km Agara · 860 m