Soul Of The Seasons - Phase 2
Overview
Soul Of The Seasons - Phase 2
Overview
Soul Of The Seasons - Phase 2
Overview
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 99 m² 99.4%1BHK
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 8 Oct 2025 | |
| Escrow bank | HDFC · AGARA JUNCTION BRANCH BANGALORE |
Data room
182 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Soul Of The Seasons - Phase 2 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 8 Oct 2025 · No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/053/2025 · issued 2 Apr 2025 | Clear |
| Environmental clearance | SEIAA 83 CON 2025 · EC identification no. EC25C3801KA5527972N · issued 15 May 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-350658 · issued 20 Sep 2025 · valid until 19 Sep 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Nov 2029 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 13/1 | Converted 16 Apr 2024 · DC , BANGALORE URBAN DISTRICT | |
| Sy 13/2, 13/3 (Old Sy.No.13/2) | Converted 28 Jun 2024 · DC , BANGALORE URBAN DISTRICT | |
| Survey numbers | 13/1 · 13/2 · 13/3 (Old Sy.No.13/2) |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 2 | 947 |
| 3BHK | 310 | 3,31,690 |
| Sold, Q2 2026-27 | 49 / 312 | |
|---|---|---|
| Unsold, Q2 2026-27 | 263 | |
| Months to sell, derived from filed bookings | 32 months |
| Orion Heights | about 1.5 km | Locked | |
|---|---|---|---|
| Mana Jardin Neo | about 2.5 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 3 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 3 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 3 km | Locked | |
| 63 Degree East - Tower E | about 3 km | Locked | |
| Adarsh Park Heights Phase-2 | about 3.5 km | Locked | |
| Nambiar District 25 Phase 2 | about 3.5 km | Locked | |
| SOBHA Ayana | about 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 4 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 4 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 4 km | Locked |
| Soul Of The Seasons - Phase 2 This project | This project is the point the others are measured from | 30 Nov 2029 | 16% (49 of 312) | Not verified yet |
|---|---|---|---|---|
| Orion Heights | about 1.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
| Mana Jardin Neo | about 2.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 2 km, Gunjur | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Devara Kere |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Covered parking per unit | 1.25 (390 covered spaces for 312 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 31 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2029 | |
| Club house | Not started | |
| Completion | 6% | |
| Completion, accountant | 6.1% of the estimated cost spent |
| Schedule end | 30 Jun 2029 | |
|---|---|---|
| RERA completion date | 30 Nov 2029 | |
| Work began, as filed | 1 Feb 2026 |
| Building heights, fire NOC | filed: Tower C 79 m, Tower D 82 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 3961.34 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/053/2025 · issued 2 Apr 2025 | |
| Environmental clearance | SEIAA 83 CON 2025 · EC identification no. EC25C3801KA5527972N · issued 15 May 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 16 Jan 2026 · site inspected 1 Jan 2026 | |
| Engineer's certificate, registration | Dated 16 Jan 2026 | |
| Chartered accountant's certificate, registration | Dated 16 Jan 2026 | |
| Architect's quarterly progress certificate | 6.12% complete per the architect, as of 12 Oct 2026 | |
| Architect's quarterly progress certificate dated | 12 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 9 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.73 Cr 3.5%Development · ₹291.96 Cr 96.5%
| Estimated cost, at registration | ₹302.70 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹302.70 Cr | |
| Cost incurred | ₹18.51 Cr (6.1% of the Form 4 Q2 2026-27 estimate) | |
| Receivable, sold flats | ₹73.86 Cr |
Sold (49) 15.7%Unsold (263) 84.3%
| Sold, Q4 2025-26 | 0 / 312 · 312 available | |
|---|---|---|
| Sold, Q1 2026-27 | 22 / 312 · 290 available | |
| Sold, Q2 2026-27 | 49 / 312 · 263 available | |
| Unsold, Q2 2026-27 | 263 | |
| Sold in Q1 2026-27 | 22 | |
| Sold in Q2 2026-27 | 27 |
| Escrow bank | HDFC · AGARA JUNCTION BRANCH BANGALORE | |
|---|---|---|
| Designated account, collected | ₹9.57 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.30 Cr in Q2 2026-27 (55% of that quarter's deposits) | |
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 30 Jun 2026 |
| 100% (113 of 113) |
| Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 3 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 3 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| 63 Degree East - Tower E | about 3 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Projects within 4 km, counted | 91 (91 with an approximate location) | |
|---|---|---|
| Flats in them | 39,012 | |
| Booked | 23,088 of 39,012 (59%) | |
| Unsold | 15,924 | |
| Booked a month, pooled | 495 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 8.5 km, Nallur Halli | |
| Metro, under construction | about 6 km, Kadubeesanahalli |
| Kempegowda Airport | 46 | 33 |
| MG Road (CBD) | 23 | 16.5 |
| Manyata Tech Park | 27 | 20 |
| ITPL, Whitefield | 12.5 | 9.5 |
| Ecospace, Bellandur ORR | 10 | 6 |
| Electronic City Ph 1 | 14 | 9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Kachamaranahalli Substation on OpenStreetMap |