Overview
Sri Sri Tapovan 2, Block 1
Overview
Sri Sri Tapovan 2, Block 1
Overview
Sri Sri Tapovan 2, Block 1
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Approvals
| Building plan (BMRDA) | Sanctioned 14 Mar 2023 · No. KPA/LAO/11/2017-18 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹10.02 Cr 55.6%Development · ₹8.01 Cr 44.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 14 Mar 2023 | |
| Escrow bank | Canara Bank · JAYANAGAR 3RD BLOCK |
Data room
244 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sri Sri Tapovan 2, Block 1 in the interactive atlas
Bangalore DC · Survey 18/1; DC Benglauru · Survey 22/1
K-RERA filing, land schedule
Covers 22/1 only
Approval or registration
Land use converted
Bangalore DC · Survey 18/1; DC Benglauru · Survey 22/1
K-RERA filing, land schedule
Covers 22/3, 22/4, 22/5 only
Approval or registration
Land use converted
DC Bengaluru · Survey 22/3, 22/4, 22/5
K-RERA filing, land schedule
Covers 22/2 only
Approval or registration
Land use converted
DC Bengaluru · Survey 22/2
K-RERA filing, land schedule
Covers 22/3, 22/4, 22/5 only
Transfer of the land
Sale deed
in favour of Max Concorde Developers · Survey 22/3, 22/4, 22/5
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 18/1, 22/1
K-RERA filing, land schedule
Covers 22/1 only
Transfer of the land
Sale deed
Survey 18/1, 22/1
K-RERA filing, land schedule
Covers 22/2 only
Transfer of the land
Sale deed
in favour of Maxconcorde Developers · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan KPA/LAO/11/2017-18
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Panchayth Raj · Survey 18/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 22/1, 22/2, 22/3, 22/4 and 1 more
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/170524/006881
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 34,215 sq m | |
| Extent the filed land schedule names for these survey numbers | 27,316 sq m | |
| Plot area against the filed extent | 1.25 times | |
| Village, hobli and taluk on the KGIS map | Uttari, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Sy. 18/1: filed extent, KGIS plot | 7,790 sq m, 8,852 sq m | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 18/1, 22/1, 22/2, 22/3, 22/4, 22/5 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 34,215 sq m (the project holds a share) | |
| Khata | E Khatha · Panchayth Raj · 30 Oct 2023; E Khatha · 10 Apr 2024 | |
| Sale deed | Dated 9 Dec 2014, 10 Feb 2015, 29 Apr 2015 | |
| Sale deed in favour of | Maxconcorde Developers, Max Concorde Developers |
| Sy. No. 18/1 | 4 | 1 acre 37 guntas | 1 acre 37 guntas | 2 acres 7 guntas | The map differs by 10 guntas | 0 | ||
| Sy. No. 22/1 | 2 | 16 guntas | 0 | |||||
| Sy. No. 22/2 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 14 Mar 2023 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 18/1 | Converted 14 Sep 2010 · Bangalore DC | |
| Sy 22/1 | Converted 14 Sep 2010 · DC Benglauru | |
| Sy 22/2 | Converted 11 Jun 2012 · DC Bengaluru | |
| Sy 22/3, 22/4, 22/5 | Converted 29 Nov 2011 · DC Bengaluru | |
| Survey numbers | 18/1 · 22/1 · 22/2 · 22/3 · 22/4 · 22/5 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 11 (10 with an approximate location) | |
|---|---|---|
| Plots in them | 2,146 | |
| Booked | 617 of 2,146 (29%) | |
| Unsold | 1,529 | |
| Booked a month, pooled | 15 plots | |
| Months to sell, pooled | 60 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 53% Commercial (business), 40% Residential (main), 7% Transport & communication | |
|---|---|---|
| Nearest high-tension line | A 400 kV line's corridor covers about 21% of the site (about 7,060 m²) | Review |
| Nearest government-flagged flood location | 6.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 2.0 km to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south-east, an unnamed pond |
| RERA completion date | 14 Mar 2023 | |
|---|---|---|
| Work began, as filed | 18 Dec 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹18.02 Cr |
|---|
| Escrow bank | Canara Bank · JAYANAGAR 3RD BLOCK |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1 |
| 1 acre 34 guntas |
| 0 |
| Sy. No. 22/3 | 1 | 9 guntas | 0 |
| Sy. No. 22/4 | 1 | 10 guntas | 0 |
| Sy. No. 22/5 | 1 | 2 acres 18 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 6.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.0 km to the east, tertiary drain | |
|---|---|---|
| Ground level | 796 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.8 km, Silk Institute | |
| Metro, under construction | 12.0 km, Kalena Agrahara |
| Kempegowda Airport | 59.1 | 63 | 47.8 |
| MG Road (CBD) | 26.0 | 29 | 20.6 |
| Manyata Tech Park | 34.5 | 40 | 28.3 |
| ITPL, Whitefield | 43.2 | 48 | 31.8 |
| Ecospace, Bellandur ORR | 30.9 | 37 | 23.1 |
| Electronic City Ph 1 | 27.8 | 28 | 19.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the south-east |