Photo: Mohan RajTitle & ownership
Approvals
| Fire department | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing |
|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate 17 Nov 2020 |
|---|
Developer
Land · ₹6.60 Cr 33.7%Development · ₹13.00 Cr
Loan & collateral
| Escrow bank | Union Bank of India · Bhuvaneshwari Nagar |
|---|
Data room
55 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Genuine documentation and beautiful construction.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ssvr Crescent in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA completion date | 30 Sep 2022 |
|---|
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Reflections 66, price locked; Sowparnika Rhythm of Rain, price locked; Sowparnika Ashiyana Phase II, price locked.
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 190 m | Locked | |
|---|---|---|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 190 m | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 450 m | Locked | |
| Vintage Valley | about 2 km | Locked | |
| Assetz 66 & Shibui | about 2 km | Locked | |
| Reflections 66 | 2.7 km | Locked | |
| Sowparnika Rhythm of Rain | 3.2 km | Locked | |
| Sowparnika Ashiyana Phase II | 3.2 km | Locked | |
| Axis Ekatva | about 3 km | Locked | |
| Kumari Nautilus | about 3.5 km | Locked | |
| Coevolve Misty Shores | about 3.5 km | Locked | |
| Vaswani Starlight | about 3.5 km | Locked |
| Ssvr Crescent This project | This project is the point the others are measured from | 30 Sep 2022 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 190 m | 31 Mar 2028 | 100% (210 of 210) | Locked |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 190 m | 30 Apr 2026 | 100% (197 of 197) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 450 m | 30 Sep 2027 | 100% (192 of 192) | Locked |
| Vintage Valley | about 2 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
| Assetz 66 & Shibui | about 2 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Reflections 66 | 2.7 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Rent, 3BHK, 3 km | ₹50,500 /mo · 40 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹31,500 /mo · 55 listings | |
| Rent, 1BHK, 3 km | ₹17,000 /mo · 66 listings | |
| Rent per sq ft, 3 km | ₹32.8 /mo, as listed · 74 listings with a size |
| Projects within 4 km, counted | 61 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 17,065 | |
| Booked | 9,800 of 17,065 (57%) | |
| Unsold | 7,265 | |
| Booked a month, pooled | 306 flats | |
| Months to sell, pooled | 21 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.6 km, GANDHIPURAM NEAR WHITE FIELD |
| Nearest storm drain | 60 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 70 m to the north-east, an unnamed pond |
| Schedule end | 31 Oct 2020 | |
|---|---|---|
| RERA completion date | 30 Sep 2022 | |
| Work began, as filed | 4 Oct 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹19.60 Cr |
|---|
Sold (35) 58.3%Unsold (25) 41.7%
| Flats sold, at completion | 35 | |
|---|---|---|
| Flats unsold, at completion | 25 | |
| Flats in the phase | 60 |
| Escrow bank | Union Bank of India · Bhuvaneshwari Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 2.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 60 m to the south-west, tertiary drain | |
|---|---|---|
| Ground level | 861 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.6 km, Channasandra | |
| Metro, under construction | 7.5 km, ISRO |
| Kempegowda Airport | 38.0 | 41 | 26.3 |
| MG Road (CBD) | 20.6 | 27 | 18.4 |
| Manyata Tech Park | 24.7 | 32 | 18.3 |
| ITPL, Whitefield | 5.7 | 9 | 4.0 |
| Ecospace, Bellandur ORR | 13.1 | 19 | 11.0 |
| Electronic City Ph 1 | 26.9 | 34 | 17.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.9 km to the north, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 950 m to the west, named Whitefield on OpenStreetMap |