Overview
Stone Henge
Overview
Stone Henge
Overview
Stone Henge
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey 45/2, 45/3, 45/4, 47/1 and 2 more
K-RERA filing, land schedule
Approvals
| Building plan (Local Planning Authority) | Sanctioned 11 Feb 2022 · No. LAO/54/2020-21 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹30.6 L 34%Development · ₹59.3 L 66%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 11 Feb 2022 | |
| Escrow bank | ICICI Bank · RR Nagar |
Data room
123 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Stone Henge in the interactive atlas
Covers 45/2, 45/3, 47/4, 47/5 only
Approval or registration
Land use converted
Deputy commissioner Bangalore urban · Survey 45/2, 45/3, 47/4, 47/5
K-RERA filing, land schedule
Covers 45/4, 47/1 only
Approval or registration
Land use converted
Deputy commissioner Bangalore urban · Survey 45/4, 47/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO/54/2020-21
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Survey 45/2, 45/3, 45/4, 47/1 and 2 more
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/120123/005609
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched part of the survey number | 6,270 sq m | |
| The whole survey number on the KGIS map | 31,070 sq m | |
| Village, hobli and taluk on the KGIS map | Gonigattapura, Sarjapura-1 hobli, Anekal taluk | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 45/2, 45/3, 45/4, 47/1, 47/4, 47/5 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 31,070 sq m (the project holds a share) | |
| Khata | E Khatha · 16 Sep 2022 | |
| Sale deed | Dated 13 Oct 2008 |
| Sy. No. 45/2 | Not read yet | 0 | |||||
| Sy. No. 45/3 | Not read yet | 0 | |||||
| Sy. No. 45/4 | Not read yet | 0 | |||||
| Sy. No. 47/1 | 1 | 2 acres 12 guntas | 0 | ||||
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Aug 2023 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 45/2, 45/3, 47/4, 47/5 | Converted 11 Feb 2020 · Deputy commissioner Bangalore urban | |
| Sy 45/4, 47/1 | Converted 4 Nov 2020 · Deputy commissioner Bangalore urban | |
| Survey numbers | 45/2 · 45/3 · 45/4 · 47/1 · 47/4 · 47/5 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 30 (22 with an approximate location) | |
|---|---|---|
| Plots in them | 5,769 | |
| Booked | 2,522 of 5,769 (44%) | |
| Unsold | 3,247 | |
| Booked a month, pooled | 111 plots | |
| Months to sell, pooled | 25 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 5.5 km, Varthur police station |
| Nearest storm drain | 2.8 km to the east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 170 m to the west, an unnamed tank |
| Possession, agreement | 15 Aug 2023 | |
|---|---|---|
| RERA completion date | 15 Aug 2023 | Red flag |
| Work began, as filed | 1 Sep 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 11 Oct 2022 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹89.9 L | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹89.9 L, same as the filing |
| Escrow bank | ICICI Bank · RR Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Not read yet |
| 0 |
| Sy. No. 47/5 | Not read yet | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (ANEKAL TOWN PLANNING AUTHORITY) | |
| Nearest city water main | 7.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.8 km to the east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Ground level | 883 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.2 km, Channasandra | |
| Metro, under construction | 10.7 km, Kodibeesanahalli |
| Kempegowda Airport | 48.5 | 50 | 33.1 |
| MG Road (CBD) | 27.0 | 32 | 21.7 |
| Manyata Tech Park | 31.2 | 37 | 23.7 |
| ITPL, Whitefield | 15.3 | 18 | 10.0 |
| Ecospace, Bellandur ORR | 15.2 | 24 | 12.1 |
| Electronic City Ph 1 | 29.2 | 32 | 14.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |