Jesus Christ Lord Memorial Remember never give up
Overview
Surya Elegance
Overview
Surya Elegance
Overview
Surya Elegance
Overview
Title & ownership
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹60.00 Cr |
|---|
Loan & collateral
| Escrow bank | ANDHRA BANK · MARTHAHALLI |
|---|
Data room
35 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Jesus Christ Lord Memorial Remember never give up
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Surya Elegance in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Forfeiture, agreement | 20% of the sale consideration |
|---|
| Assetz 66 & Shibui | about 1 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 1 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 1.5 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 1.5 km | Locked |
|---|
| Reflections 66 | about 1.5 km | Locked |
|---|
| Axis Ekatva | about 1.5 km | Locked |
|---|
| Vintage Valley | about 2 km | Locked |
|---|
| Coevolve Misty Shores | about 2 km | Locked |
|---|
| Vaswani Starlight | about 2 km | Locked |
|---|
| Nirmaanika Aria | about 3 km | Locked |
|---|
| Godrej Splendour | about 3.5 km | Locked |
|---|
| Godrej Splendour Phase II | about 4 km | Locked |
|---|
| Surya Elegance This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 1 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 1.5 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 1.5 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
| Reflections 66 | about 1.5 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Axis Ekatva | about 1.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Projects within 4 km, counted | 72 (72 with an approximate location) | |
|---|---|---|
| Flats in them | 23,784 | |
| Booked | 15,396 of 23,784 (65%) | |
| Unsold | 8,388 | |
| Booked a month, pooled | 340 flats | |
| Months to sell, pooled | 24 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, GANDHIPURAM NEAR WHITE FIELD |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Possession, agreement | 31 Dec 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 | Red flag |
| Completion date, agreement | 31 Dec 2019 | |
| Grace period for possession | 4 months | |
| Work began, as filed | 21 Jan 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | ANDHRA BANK · MARTHAHALLI |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 1 km, Channasandra | |
| Metro, under construction | about 6 km, ISRO |
| Kempegowda Airport | 36.5 | 25 |
| MG Road (CBD) | 20 | 17 |
| Manyata Tech Park | 20.5 | 16.5 |
| ITPL, Whitefield | 3 | 2.5 |
| Ecospace, Bellandur ORR | 12.5 | 10 |
| Electronic City Ph 1 | 26.5 | 17.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Whitefield on OpenStreetMap |