Staying here, Amenities are pending, builder is not taking responsibility to complete the pending works.
Overview
Surya Pride
Overview
Surya Pride
Overview
Surya Pride
Overview
Photo: Surendran BalasubramaniamTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 7 Apr 2022 · No. PRJ/12926/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats · avg 77 m² 100%
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹26.31 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹54.6 L |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 7 Apr 2022 | |
| Escrow bank | Karnataka Bank Ltd. · BASAVANAGUDI |
Data room
143 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Staying here, Amenities are pending, builder is not taking responsibility to complete the pending works.
The surrounding environment was good but the lift is not working well very slow.... Thank you
Staying here, builders taking so long to fix the amenities and to help us settle down, water borewells aren’t working properly and now we don’t have enough water also
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aditya RaagaActive · 28% built | Aditya Constructions | Apartment | 862–1,037 sqft carpet (as filed) | Mar 2029 |
| Assetz Canvas & CoveLapsed · completion date passed | Assetz Property Group | Apartment | 933–1,900 sqft | – |
| Axis AntaraLapsed · completion date passed | AXIS CONCEPT CONSTRUCTION PVT LTD | Apartment | – | Jun 2021 |
| Dhiraan LotusCompleted (regulator flag) | DHIRAAN INFRASTRUCTURE PVT. LTD | Apartment | 994–1,798 sqft carpet (as filed) | Completed |
| G R FloretActive · 95% built | SGR BUILDTECH LLP | Apartment | 1,037 sqft carpet (as filed) | Dec 2026 |
| Prestige Song Of The South -Phase-2Completed · OC 04-04-2022 | Prestige Estates Projects Limited | Apartment | – | Completed |
| Pvr MithraCompleted (regulator flag) | SREE PVR DEVELOPERS | Apartment | – | Completed |
| Radiant Silver OakLapsed · completion date passed | Radiant Properties | Apartment | – | Dec 2019 |
8 of 13 other projects in Begur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Surya Pride in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 4 Aug 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Nov 2024 |
| Land conversion | Converted 3 Aug 2010 · Disctrict Officer | |
|---|---|---|
| Survey numbers | 2314/54/4 · 102/54/4 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 72 | 825 |
| Azur Phase 2 | about 1 km | Locked | |
|---|---|---|---|
| Azur Tower D | about 1 km | Locked | |
| Lodha Azur | about 2 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 2 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | Locked | |
| Aqua Vista | about 2.5 km | Locked | |
| Dhiraan Lotus | about 3 km | Locked | |
| Iris Courtyard | about 3 km | Locked | |
| K&T's Sai Sannidhi | about 3 km | Locked | |
| Mahindra NewHaven | about 3 km | Locked | |
| Mahindra Zen | about 3.5 km | Locked | |
| Pacific Legacy | about 4 km | Locked |
| Surya Pride This project | This project is the point the others are measured from | 30 Nov 2024 | – | Not verified yet |
|---|---|---|---|---|
| Azur Phase 2 | about 1 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
| Azur Tower D | about 1 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
| Lodha Azur | about 2 km | 30 Oct 2029 | 97% (236 of 244) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, BEGUR KERE AREA |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Beguru Yelenahalli Kere |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (72 covered spaces for 72 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 30 Oct 2024 | |
|---|---|---|
| RERA completion date | 30 Nov 2024 | Red flag |
| Work began, as filed | 1 Jun 2022 |
| Building heights, fire NOC | 6 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 12 sq m |
|---|
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect's certificate, registration | Dated 23 Jun 2022 · site inspected 22 Jun 2022 | |
| Chartered accountant's certificate, registration | Dated 12 Jul 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Karnataka Bank Ltd. · BASAVANAGUDI | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Assetz Canvas & Cove 2.0 - Block A | about 2 km | 30 Apr 2029 | 98% (238 of 244) | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
|---|
| Aqua Vista | about 2.5 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
|---|
| Projects within 4 km, counted | 48 (48 with an approximate location) | |
|---|---|---|
| Flats in them | 13,528 | |
| Booked | 9,230 of 13,528 (68%) | |
| Unsold | 4,298 | |
| Booked a month, pooled | 256 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3.5 km, Singasnadra | |
| Metro, under construction | about 2.5 km, Kalena Agrahara |
| Kempegowda Airport | 47.5 | 38.5 |
| MG Road (CBD) | 14.5 | 12.5 |
| Manyata Tech Park | 23.5 | 20 |
| ITPL, Whitefield | 27.5 | 19 |
| Ecospace, Bellandur ORR | 15 | 9.5 |
| Electronic City Ph 1 | 12 | 7.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Hulimavu 10MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |