Overview
Svb Maplewoods
Overview
Svb Maplewoods
Overview
Svb Maplewoods
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Approvals
| Building plan (Local Planning Authority) | Sanctioned 16 May 2023 · No. AYP/LAO/169/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2.79 Cr 61.6%Development · ₹1.74 Cr 38.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 16 May 2023 | |
| Escrow bank | STATE BANK OF INDIA · HSR Layout |
Data room
150 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 3 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Svb Maplewoods in the interactive atlas
Sale deed
in favour of M/S. S V B Developers · Survey 75/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/S. SVB Developers · Survey 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/S. S V B Developers · Survey 75/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan AYP/LAO/169/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/300823/006205
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 12,200 sq m | |
| Extent the filed land schedule names for these survey numbers | 11,838 sq m | |
| Plot area against the filed extent | 1.03 times | |
| Village, hobli and taluk on the KGIS map | Jantagondahalli, SARJAPURA3 hobli, ANEKAL taluk | |
| Mutation entry | None open on 3 of 3 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 75/1, 75/2, 75/3 | |
|---|---|---|
| Land extent, Sy 75/1 | 39 guntas | |
| Land extent, Sy 75/2 | 39 Guntas | |
| Land extent, Sy 75/3 | 39 guntas | |
| Whole survey numbers on the KGIS map | 12,200 sq m (the project holds a share) | |
| Khata | A Khatha · Panchayat Raj Anekal · 28 Dec 2022 | |
| Sale deed | Dated 26 May 2022, 21 Oct 2022 | |
| Sale deed in favour of | M/S. S V B Developers, M/S. SVB Developers |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 75/1 | 1 | 39 guntas | 0 | ||||
| Sy. No. 75/2 | 1 | 39 guntas | 0 | ||||
| Sy. No. 75/3 | 1 | 39 guntas | 0 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 May 2027 |
| Land conversion | Converted 21 Oct 2022 · District commisioner Bengaluru | |
|---|---|---|
| Survey numbers | 75/1 · 75/2 · 75/3 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 27 (17 with an approximate location) | |
|---|---|---|
| Plots in them | 5,907 | |
| Booked | 2,821 of 5,907 (48%) | |
| Unsold | 3,086 | |
| Booked a month, pooled | 112 plots | |
| Months to sell, pooled | 20 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest high-tension line | A 400 kV line passes 40 m from the filed location: close enough that its corridor may cross the site | Review |
|---|---|---|
| Nearest government-flagged flood location | 4.3 km, Varthur police station | |
| Government land in the filed surveys | Sy 75: 100% of the parent survey, 3.01 of 3.01 acres | Review |
| Nearest storm drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the south, an unnamed pond |
| RERA completion date | 31 May 2027 | |
|---|---|---|
| Work began, as filed | 16 May 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 31 Jul 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹4.53 Cr |
|---|
| Escrow bank | STATE BANK OF INDIA · HSR Layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Local Authority, Neriga Village) | |
| Nearest city water main | 5.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Ground level | 879 m above sea level, plus or minus 4 m | |
| Metro, operational | 7.5 km, Channasandra | |
| Metro, under construction | 9.6 km, Kodibeesanahalli |
| Kempegowda Airport | 45.0 | 45 | 31.4 |
| MG Road (CBD) | 23.5 | 27 | 20.6 |
| Manyata Tech Park | 27.6 | 33 | 22.1 |
| ITPL, Whitefield | 11.7 | 14 | 8.3 |
| Ecospace, Bellandur ORR | 14.3 | 20 | 11.3 |
| Electronic City Ph 1 | 25.4 | 31 | 15.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 3.0 km to the north-west |