Overview
Telosa
Overview
Telosa
Overview
Telosa
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 29 Aug 2023 · No. BBMP/Ad.Com/SUT/0714/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 188 m² 75%4BHK 25%
Location & risks
Construction & progress
Developer
Land · ₹5.19 Cr 47.2%Development · ₹5.81 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 12 Oct 2023 | Review |
| Building plan (BBMP) | Sanctioned 29 Aug 2023 | |
| Escrow bank | Industrial Development Bank of India · KINGLIFE INFRA PRIVATE LIMITED-RERA Designated Account for TELOSA |
Data room
111 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| Advaitha AkshaCompleted · OC 10-03-2022 | Advaitha ventures Pvt Ltd | Apartment | 1,567 sqft carpet (as filed) | Completed |
| Arihant VilayaLapsed · completion date passed | ARIHANT FOUNDATIONS AND HOUSING LIMITED | Apartment | – | Dec 2023 |
| Aydin Infra Signature 3Active · 85% built | AYDIN INFRA | Apartment | 1,167–1,832 sqft carpet (as filed) | Aug 2027 |
| BelakuLapsed · completion date passed | Millennial Luxury Estates Private Limited | Apartment | 2,284–2,621 sqft carpet (as filed) | Mar 2026 |
| BelvoirRegistered · no quarterly update yet | KINGLIFE INFRA PRIVATE LIMITED | Apartment | – | Dec 2031 |
| Gp AdityaCompleted · OC 16-01-2024 | VIJAYA LAKSHMI CONSTRUCTIONS | Apartment | 891 sqft carpet (as filed) | Completed |
| Green FontanaLapsed · completion date passed | GREEN CARS PVT LTD | Apartment | – | Dec 2019 |
| Hamiton TowersCompleted · OC 12-02-2024 | Pelagsus Infrastructures Pvt Ltd | Apartment | 2,160 sqft carpet (as filed) | Completed |
8 of 23 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Telosa in the interactive atlas
Transfer of the land
Title deed registered
No. BMH-1-02791-2023-24 · Book 1 · executed 13 Jun 2023 · Consideration ₹5.00 Cr · Begur hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 4, 8, 12 · See it in Documents
Transfer of the land
Sale deed
in favour of KINGLIFE INFRA PRIVATE LIMITED · Survey SITE NO. 152
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BDA · Survey SITE NO. 152
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com/SUT/0714/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/060324/006688
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 12 Oct 2023 |
|---|
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | SITE NO. 152 | |
|---|---|---|
| Land extent, Sy SITE NO. 152 | 628 sq m | |
| Land area of this registration | 628 sq m | |
| Khata | A Khatha · BDA · 12 Jul 2023 | |
| Sale deed | Dated 13 Jun 2023 | |
| Sale deed in favour of | KINGLIFE INFRA PRIVATE LIMITED |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2030 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | SITE NO. 152 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 6 | 12,142 |
| 4BHK | 2 | 5,339 |
| Aydin Infra Signature 3 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 1 km | Locked | |
| Century Regalia (Project 2) | about 3.5 km | Locked | |
| Ranka Iris | about 4 km | Locked | |
| Pacific Legacy | about 4.5 km | Locked | |
| Abhee Riviera Royale | about 4.5 km | Locked | |
| Dhiraan Lotus | about 4.5 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 5.5 km | Locked | |
| Adarsh Rosewood | about 6 km | Locked | |
| Mahindra Zen | about 6 km | Locked | |
| Mahindra NewHaven | about 6 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 6.5 km | Locked |
| Telosa This project | This project is the point the others are measured from | 31 Mar 2030 | – | Not verified yet |
|---|---|---|---|---|
| Aydin Infra Signature 3 | about 0.5 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 1 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, SRINIVAGILU TANK BED LAYOUT |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, K100 |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.63 (13 covered spaces for 8 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Mar 2030 | |
|---|---|---|
| Schedule end | 31 Mar 2030 | |
| RERA completion date | 31 Mar 2030 | |
| Work began, as filed | 1 Feb 2024 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | External walls: 6" | |
| Building heights, fire NOC | 14.4 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Power backup | Provided, 20 sq m |
| Architect's certificate, registration | Dated 22 Jan 2024 | |
|---|---|---|
| Engineer's certificate, registration | Dated 5 Feb 2024 | |
| Chartered accountant's certificate, registration | Dated 20 Jan 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹11.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹5.81 Cr |
| Escrow bank | Industrial Development Bank of India · KINGLIFE INFRA PRIVATE LIMITED-RERA Designated Account for TELOSA |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Century Regalia (Project 2) | about 3.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
|---|
| Pacific Legacy | about 4.5 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
|---|
| Abhee Riviera Royale | about 4.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Projects within 4 km, counted | 23 (23 with an approximate location) | |
|---|---|---|
| Flats in them | 2,378 | |
| Booked | 1,408 of 2,378 (59%) | |
| Unsold | 970 | |
| Booked a month, pooled | 29 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Bommanahalli | |
| Metro, under construction | about 1 km, Agara |
| Kempegowda Airport | 41 | 31 |
| MG Road (CBD) | 8.5 | 6.5 |
| Manyata Tech Park | 17 | 13 |
| ITPL, Whitefield | 21 | 12.5 |
| Ecospace, Bellandur ORR | 8.5 | 4.5 |
| Electronic City Ph 1 | 15.5 | 10.5 |
| Landfill or waste transfer station | about 2 km to the north-west | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |