Overview
The Glenhart Estates Phase 2
Part ofThe Glenhart Estates2 phases, 278 plots
Overview
The Glenhart Estates Phase 2
Part ofThe Glenhart Estates2 phases, 278 plots
Overview
The Glenhart Estates Phase 2
Part ofThe Glenhart Estates2 phases, 278 plots
Overview
Part ofThe Glenhart Estates2 phases, 278 plots
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 55 | ||||
| 55/1 | 1 Jun 2019DC Office, Bengaluru | 9 Mar 2023 | ||
Approvals
| Building plan (Anekal Planning Authority) | Sanctioned 1 Jun 2023 · No. AAYOPRA/LAO/127/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹25.56 Cr 58.3%Development · ₹18.27 Cr 41.7%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 1 Jun 2023 | |
| Escrow bank | KOTAK MAHINDRA BANK · BOMMASANDRA |
Data room
131 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Glenhart Estates Phase 2 in the interactive atlas
| 17 Oct 2025 |
| 1 Acre 23 Guntas |
| 55/2 | 20 Dec 2018DC Office, Bengaluru | 17 Jan 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 17 Oct 2025 | 1 Acre |
|---|
| 55/4 | 27 Oct 2018DC Office, Bengaluru | 17 Jan 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 17 Oct 2025 | 35 Guntas |
|---|
| 55/5 | 23 Nov 2022DC Office, Bengaluru | 2 Mar 2023 | 17 Oct 2025 | 20 Guntas |
|---|
| 57/2 | 18 Dec 2021DC office, Bengaluru | 3 Feb 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 17 Oct 2025 | 1 Acre 36 guntas |
|---|
| Survey 61 | ||||
|---|---|---|---|---|
| 61/1 | 20 Dec 2018DC Office Bengaluru | 17 Jan 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 19 Oct 2025 | 1 Acre |
| 61/2 | 22 Oct 2018DC Office Bengaluru | 17 Jan 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 19 Oct 2025 | 1 Acre 13 Guntas |
| 61/4 | 21 Mar 2022DC Office Bengaluru | 10 Mar 2023in favour of GKS Builders and Developers | 19 Oct 2025 | 2 Acre 8 Guntas |
| 61/5 | 11 Mar 2022DC Office Bengaluru | 9 Mar 2023in favour of GKS Builders and Developers | 19 Oct 2025 | 18 Guntas |
| Survey 62 | ||||
|---|---|---|---|---|
| 62/1 | 11 Mar 2022DC Office Bengalruu | 9 Mar 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 19 Oct 2025 | 3 Guntas |
| 62/2 | 11 Mar 2022Dc Office Bengaluru | 3 Feb 2023in favour of Shankar N (Contribution to GKS Builders and Developers) | 19 Oct 2025 | 13 Guntas |
K-RERA filing, land schedule
The whole project
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan AAYOPRA/LAO/127/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/101225/008325
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 4 of 4 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 48,676 sq m | |
| Extent the filed land schedule names for these survey numbers | 45,426 sq m | |
| Plot area against the filed extent | 1.07 times | |
| Village, hobli and taluk on the KGIS map | Chikkahagade, Kasaba-2 hobli, Anekal taluk | |
| Sy. 57/2: filed extent, KGIS plot | 7,689 sq m, 7,239 sq m | |
| Mutation entry | None open on 11 of 11 filed surveys |
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 55/1, 55/2, 55/4, 55/5, 57/2, 61/1 and 5 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 48,676 sq m (the project holds a share) | |
| Khata | 17 Oct 2025; 19 Oct 2025 | |
| Sale deed | Dated 17 Jan 2023, 3 Feb 2023, 2 Mar 2023 and 2 more | |
| Sale deed in favour of | Panchamukhi Builders and Developers, Shankar N (Contribution to GKS Builders and Developers), GKS Builders and Developers |
| Sy. No. 55/1 | 1 | 1 acre 23 guntas | 0 | |||||
| Sy. No. 55/2 | 1 | 1 acre | 0 | |||||
| Sy. No. 55/4 | 1 |
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Oct 2027 |
| Land conversion | 11 of 11 parcels converted | |
|---|---|---|
| Sy 55/1 | Converted 1 Jun 2019 · DC Office, Bengaluru | |
| Sy 55/2 | Converted 20 Dec 2018 · DC Office, Bengaluru | |
| Sy 55/4 | Converted 27 Oct 2018 · DC Office, Bengaluru | |
| Sy 55/5 | Converted 23 Nov 2022 · DC Office, Bengaluru | |
| Sy 57/2 | Converted 18 Dec 2021 · DC office, Bengaluru | |
| Sy 61/1 | Converted 20 Dec 2018 · DC Office Bengaluru | |
| Other parcels | 4 more groups on the filing | |
| Survey numbers | 55/1 · 55/2 · 55/4 · 55/5 · 57/2 · 61/1 · 61/2 · 61/4 · 61/5 · 62/1 · 62/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 126 | |
| Booked | 100 of 126 (79%) | |
| Unsold | 26 | |
| Booked a month, pooled | 5 plots | |
| Months to sell, pooled | 5 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 16.5 km, G K LAYOUT | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| RERA completion date | 31 Oct 2027 | |
|---|---|---|
| Work began, as filed | 1 Jan 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹43.83 Cr |
|---|
| Escrow bank | KOTAK MAHINDRA BANK · BOMMASANDRA |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 35 guntas |
| 0 |
| Sy. No. 55/5 | 1 | 20 guntas | 0 |
| Sy. No. 57/2 | 1 | 1 acre 36 guntas | 1 acre 36 guntas | 1 acre 32 guntas | The map differs by 4 guntas | 0 |
| Sy. No. 61/1 | 1 | 1 acre | 0 |
| Sy. No. 61/2 | 1 | 1 acre 13 guntas | 0 |
| Sy. No. 61/4 | 1 | 2 acres 8 guntas | 0 |
| Sy. No. 61/5 | 1 | 18 guntas | 0 |
| Sy. No. 62/1 | 1 | 3 guntas | 0 |
| Sy. No. 62/2 | 1 | 13 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 10 km, Bommasandra | |
| Metro, under construction | about 19.5 km, Kalena Agrahara |
| Kempegowda Airport | 67 | 52.5 |
| MG Road (CBD) | 32.5 | 29.5 |
| Manyata Tech Park | 43.5 | 36 |
| ITPL, Whitefield | 36.5 | 29 |
| Ecospace, Bellandur ORR | 28 | 22 |
| Electronic City Ph 1 | 15 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the north-east, named Anekal on OpenStreetMap |