Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
3BHK · avg 103 m² 98%1BHK
Location & risks
What is the location like?
Water supply, as filedBWSSBDeclared by the promoter
Metro, operationalabout 5 kmInfosys Foundation Konappana Agrahara
The site
Zoning & hazards
Power lines, drains and flood locations around the filed pin
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion65%As of Q2 2026-27, promoter's return
Possession, agreementDec 2026Agreement for sale, p. 14
StructureRCC framed structureAs specified
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Cost left₹74.97 CrAs of Q2 2026-27
Sold105 / 202As of Q2 2026-27
Sold in Q2 2026-2735✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 1 Apr 2025
Escrow bank
HDFC · Mahadevapura Branch
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
382 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Trifecta Vanto Phase-2 in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Fire NOC
KSFES/NOC/505/2024 · issued 5 Mar 2025 · building height 77 m
✓Clear
Environmental clearance (1 of 2)
SEIAA 193 CON 2023 · EC identification no. EC23B038KA199615 · issued 1 Dec 2023
✓Clear
Environmental clearance (2 of 2)
SEIAA 22 CON 2025 · EC identification no. EC24C3801KA5688558N · issued 7 Mar 2025
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation
Club House, built
80%
Electricity, built
10%
Outdoor Sports facility, built
0%
Swimming Pool, built
80%
Parks, built
80%
Water and Sanitation, built
0%
Covered parking per unit
1.00 (202 covered spaces for 202 units)
Power backup
Declared by the promoter
Around it
Water
Water at a glance
Water supply, as filed
BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Groundwater; Zoning, RMP 2015; Nearest high-tension line; Kitchen handover; Sewage plant; What it means; Through the year; Nearest city water main; Ground level.
As the promoter reported itPossession date in the agreement
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
100% · planned by 30 Mar 2026
Electrical and plumbing finishing
20% · planned by 1 Feb 2028
Club house
80%
Completion
65%
Dates
Dates
Filed dates
Possession, agreement
Dec 2026
Schedule end
31 Mar 2028
RERA completion date
31 Mar 2028
Work began, as filed
1 Apr 2025
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Building heights, fire NOC
77 m on the fire NOC · 77 m filed
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹12.67 Cr 7.1%Development · ₹165.51 Cr 92.9%
Form 4
Estimated cost, at registration
₹178.18 Cr
Estimated cost, architect's and engineer's certificates
₹178.18 Cr, same as the filing
Estimated cost, Form 4 Q2 2026-27
₹158.76 Cr
Cost left
₹74.97 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (105) 52%Unsold (97) 48%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
36 / 202 · 166 available
Sold, Q4 2025-26
47 / 202 · 155 available
Sold, Q1 2026-27
70 / 202 · 132 available
Sold, Q2 2026-27
105 / 202 · 97 available
Unsold, Q2 2026-27
97
Sold in Q4 2025-26
11
Sold in Q1 2026-27
23
Sold in Q2 2026-27
35
Flats booked, Form 4 Q4 2025-26
47
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Mahadevapura Branch
Designated account, collected
₹31.56 Cr in Q2 2026-27
Designated account, withdrawn
₹31.56 Cr in Q2 2026-27 (100% of that quarter's deposits)
Amount deposited in the quarter, Form 4
₹14,47,43,117
Net amount withdrawable, Form 4
₹11,13,22,177
Withdrawn from the escrow account to date
₹72,65,48,703
Share of collections deposited in escrow
70%
Track record
DOSL builder track
K-RERA registrations under this promoter
9
Marked completed
2
Past promised date, not completed
3
Not verified yet: Receivable, sold flats; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot