Page 1
Page 1 of 21 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 21 pages, English.
Approvals
| Power NOC | Filed with the registration |
|---|
| RERA extensions |
|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹11.00 Cr |
|---|
Loan & collateral
| Escrow bank | HDFC · Halasuru Branch |
|---|
Data room
65 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Tuscany in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 82,454 sq m |
|---|
| RERA completion date | 15 Jan 2022 |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 16.5 km, Mantri Lake view Appartment Next to Talagattapura Lake |
|---|
| Nearest storm drain | about 1 km, Suvarnamukhi, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Water supply, as filed | Self development |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Suvarnamukhi, primary drain | |
|---|---|---|
| Metro, operational | about 15.5 km, Silk Institute | |
| Metro, under construction | about 20 km, Kalena Agrahara |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km |
| RERA completion date | 15 Jan 2022 | Red flag |
|---|---|---|
| Work began, as filed | 15 Nov 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | HDFC · Halasuru Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Kempegowda Airport | 68.5 | 57.5 |
| MG Road (CBD) | 35.5 | 30.5 |
| Manyata Tech Park | 44 | 38.5 |
| ITPL, Whitefield | 52.5 | 39.5 |
| Ecospace, Bellandur ORR | 40.5 | 30.5 |
| Electronic City Ph 1 | 37 | 24 |
| Quarry | about 1.5 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|