Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 23 Jun 2020 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹7.50 Cr 78.4%Development · ₹2.07 Cr 21.6%
Loan & collateral
| Records searched to | 23 Jun 2020 | Review |
|---|---|---|
| Escrow bank | HDFC · Jayanagar 3rd Block |
Data room
84 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
All 48 projects in East Bengaluru → · Upkar Developers's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Upkar Habitat Phase 2 in the interactive atlas
Page 1
Page 1 of 28 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 28 pages.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 20,843 sq m | |
|---|---|---|
| Title deed | Consideration ₹22.3 L |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2021 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 298 | |
| Booked | 272 of 298 (91%) | |
| Unsold | 26 | |
| Booked a month, pooled | 3 plots | |
| Months to sell, pooled | 8 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest high-tension line | Nearest high-tension line: 220 kV, 350 m from the filed location | Clear |
|---|---|---|
| Nearest government-flagged flood location | 19.8 km, Doddakannelli |
| Nearest storm drain | 2.8 km to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 510 m to the north-west, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Water supply, as filed | Self development | |
|---|---|---|
| Nearest city water main | 16.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.8 km to the east, tertiary drain | |
|---|---|---|
| Ground level | 901 m above sea level, plus or minus 4 m | |
| Metro, operational | 13.7 km, Bommasandra | |
| Metro, under construction | 23.4 km, Bellandur |
| RERA completion date | 31 Mar 2021 | |
|---|---|---|
| Work began, as filed | 5 Dec 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
| Estimated cost, at registration | ₹9.57 Cr |
|---|
| Escrow bank | HDFC · Jayanagar 3rd Block | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Kempegowda Airport | 70.3 | 75 | 51.2 |
| MG Road (CBD) | 36.0 | 43 | 32.7 |
| Manyata Tech Park | 46.6 | 53 | 38.0 |
| ITPL, Whitefield | 39.7 | 43 | 27.3 |
| Ecospace, Bellandur ORR | 34.0 | 40 | 23.3 |
| Electronic City Ph 1 | 18.2 | 21 | 16.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.1 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.7 km to the north-east, named Zuzuvadi on OpenStreetMap |