Overview
Upkar Habitat Phase 3
Overview
Upkar Habitat Phase 3
Overview
Upkar Habitat Phase 3
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 75 | ||||
| 75/1 | 4 Aug 2023 | |||
Approvals
| Building plan (BMRDA) | Sanctioned 27 May 2024 · No. STRRPA/TP/LAO/09/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹7.51 Cr 44.6%Development · ₹9.34 Cr 55.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 16 Sep 2024 | |
| Building plan (BMRDA) | Sanctioned 27 May 2024 | |
| Escrow bank | HDFC · JAYANAGAR |
Data room
216 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
All 40 projects in South Bengaluru → · Upkar Developers's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Upkar Habitat Phase 3 in the interactive atlas
| 28 Nov 2017 |
| 3 Jun 2024A Khatha · Panchayath |
| 2 ACRE |
| 75/2 | 4 Aug 2023DC- BANGALORE | 4 Aug 2023 | 5 Jun 2024A Khatha · Panchayath | 1 ACRE 3.8 GUNTAS |
|---|
| 76 | 4 Aug 2023DC- BANGALORE | 26 Feb 2014 | 5 Jun 2024A Khatha · Panchayath | 2 ACRE 11 GUNTAS |
|---|
| 77 | 4 Aug 2023DC - Basavangudi Attibele | 8 Jul 2013 | 5 Jun 2024A Khatha · Panchayath | 2 Acre |
|---|
| 78 | 29 Jan 2022DC | 12 Jun 2013 | 5 Jun 2024A Khatha · Panchayath | 2 ACRES |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹50.0 L · Sy 78, Dasanpura village, Attibele hobli, Anekal taluk · 02 Acres
Title deed filed with K-RERA, pp. 1, 14, 21 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹50.0 L · Sy 77, Dasanpura village, Attibele hobli, Anekal taluk · 02 Acres
Title deed filed with K-RERA, pp. 1, 15, 22 · See it in Documents
Transfer of the land
Title deed registered
No. ABL-1-07096-2013-14 · Book 1 · executed 26 Feb 2014 · Consideration ₹60.0 L
Title deed filed with K-RERA, pp. 1, 10, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹70.0 L · Sy 75, Dasanpura village, Village. Attibele hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹70.0 L · Sy 75, Dasanpura village, Village. Attibele hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9, 17 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan STRRPA/TP/LAO/09/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/201224/007308
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 16 Sep 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: EC, 4 pages.
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: Joint Survey Sketch, 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 5 of 5 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 33,863 sq m | |
| Extent the filed land schedule names for these survey numbers | 37,920 sq m | |
| Plot area against the filed extent | 0.89 times | |
| Village, hobli and taluk on the KGIS map | Dasanapura, ATTIBELE1 hobli, ANEKAL taluk | |
| Sy. 76: filed extent, KGIS plot | 9,207 sq m, 8,062 sq m | |
| Sy. 77: filed extent, KGIS plot | 8,094 sq m, 8,602 sq m | |
| Sy. 78: filed extent, KGIS plot | 8,094 sq m, 8,350 sq m |
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 75/1, 75/2, 76, 77, 78 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 33,863 sq m (the project holds a share) | |
| Khata | A Khatha · Panchayath · 3 Jun 2024; A Khatha · Panchayath · 5 Jun 2024 | |
| Sale deed | Dated 12 Jun 2013, 8 Jul 2013, 26 Feb 2014 and 2 more |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Dec 2029 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 75/1, 75/2, 76 | Converted 4 Aug 2023 · DC- BANGALORE | |
| Sy 77 | Converted 4 Aug 2023 · DC - Basavangudi Attibele | |
| Sy 78 | Converted 29 Jan 2022 · DC | |
| Survey numbers | 75/1 · 75/2 · 76 · 77 · 78 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 50 | |
| Booked | 18 of 50 (36%) | |
| Unsold | 32 | |
| Booked a month, pooled | 2 plots | |
| Months to sell, pooled | 16 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 19.5 km, G K LAYOUT | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
As the promoter reported itPossession date in the agreement
| Internal roads | 100% | |
|---|---|---|
| Completion | 98% | |
| Completion, accountant | 61.1% of the estimated cost spent |
| Possession, agreement | 30 Dec 2029 | |
|---|---|---|
| RERA completion date | 30 Dec 2029 | |
| Work began, as filed | 1 Sep 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect's certificate, registration | Dated 19 Aug 2024 | |
| Engineer's certificate, registration | Dated 18 Aug 2024 | |
| Chartered accountant's certificate, registration | Dated 20 Aug 2024 | |
| Chartered accountant, Form 4 | Dated 14 Oct 2026 |
| Estimated cost, at registration | ₹16.84 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹9.34 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹16.84 Cr | |
| Cost incurred | ₹10.30 Cr (61.1% of the Form 4 Q2 2026-27 estimate) |
| Escrow bank | HDFC · JAYANAGAR | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹8,67,65,534 | |
| Share of collections deposited in escrow | 70% | |
| Share of collections the promoter declared for escrow | 70% | |
| Sale proceeds realised, Q3 2025-26 | ₹39,00,000 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 13 km, Bommasandra | |
| Metro, under construction | about 23 km, Bellandur |
| Kempegowda Airport | 70 | 51.5 |
| MG Road (CBD) | 35.5 | 32.5 |
| Manyata Tech Park | 46.5 | 38 |
| ITPL, Whitefield | 39.5 | 27.5 |
| Ecospace, Bellandur ORR | 33.5 | 23 |
| Electronic City Ph 1 | 18 | 15.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the north-east, named Zuzuvadi on OpenStreetMap |