Overview
Vaishnavi Triniti
Overview
Vaishnavi Triniti
Overview
Vaishnavi Triniti
Overview
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| – |
| Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vaishnavi Triniti in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Magnolia Delight | about 2.5 km | Locked | |
|---|---|---|---|
| Renaissance Srichakra | about 3 km | Locked | |
| Sri Rama Enclave | about 4.5 km | Locked | |
| Vista Padmalaya | about 4.5 km | Locked | |
| Assetz Soho & Sky | 4.9 km | Locked | |
| Cumins Sanctum | about 5.5 km | Locked | |
| Royal Enclave | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Lodha Mirabelle | 5.6 km | Locked | |
| Assetz Soho & Sky Phase 1b | 6.1 km | Locked | |
| Sumadhura Epitome | 6.5 km | Locked | |
| Sumadhura Solea | 6.5 km | Locked |
| Vaishnavi Triniti This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 2.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Renaissance Srichakra | about 3 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Sri Rama Enclave | about 4.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Vista Padmalaya | about 4.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Assetz Soho & Sky | 4.9 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 5.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Rent, 3BHK, 3 km | ₹40,000 /mo · 27 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹25,000 /mo · 62 listings | |
| Rent, 1BHK, 3 km | ₹10,000 /mo · 59 listings | |
| Rent per sq ft, 3 km | ₹25.8 /mo, as listed · 69 listings with a size |
| Projects within 4 km, counted | 7 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 628 | |
| Booked | 263 of 628 (42%) | |
| Unsold | 365 | |
| Booked a month, pooled | 3 flats | |
| Months to sell, pooled | 110 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 530 m from the site | Clear |
| Nearest government-flagged flood location | 650 m, Vasanthappa block Hebbal |
| Nearest storm drain | 400 m to the south-west, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 570 m to the south-west, an unnamed water body |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 3 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 10 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 400 m to the south-west, secondary drain | |
|---|---|---|
| Ground level | 926 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.1 km, Sandal Soap Factory | |
| Metro, under construction | 2.2 km, Hebbal |
| Kempegowda Airport | 29.6 | 31 | 23.4 |
| MG Road (CBD) | 7.5 | 9 | 6.4 |
| Manyata Tech Park | 7.8 | 11 | 4.8 |
| ITPL, Whitefield | 22.7 | 26 | 17.8 |
| Ecospace, Bellandur ORR | 23.0 | 29 | 15.9 |
| Electronic City Ph 1 | 27.3 | 33 | 23.7 |
| Landfill or waste transfer station | 2.0 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 360 m to the east, named Hebbal Substation on OpenStreetMap |