Photo: sachin veerTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 14 Jan 2022 · No. LP NO: BBMP/Ad.Com/BMH/1151/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3bhk · avg 88 m² 70%2bhk 30%
Location & risks
Construction & progress
Developer
Land · ₹3.42 Cr 29.2%Development · ₹8.30 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 14 Jan 2022 | |
| Escrow bank | CITY UNION BANK · J P NAGAR BRANCH |
Data room
110 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Very good community with required amenities.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 100 TreesCompleted · OC 08-06-2021 | ADIGA PROPERTY DEVELOPERS | Apartment | – | Completed |
| Akshaya RegaliaCompleted (regulator flag) | AKSHAYA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| Anitha RegencyLapsed · completion date passed | SHAKTHI INFRASTRUCTURE | Apartment | 794 sqft carpet (as filed) | Mar 2024 |
| Anu GreensLapsed · completion date passed | Jyothi P | Plot | ~1,200–1,670 sqft (estimate: filed carpet plus 25%) | Jun 2024 |
| Arkha SanctuaryCompleted (regulator flag) | ARKHA DEVELOPERS | Apartment | 793–945 sqft carpet (as filed) | Completed |
| Casper ValleyRegistered · no quarterly update yet | AURA WAVE ESTATES LLP | Plot | ~1,060–2,000 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
| Century CentralCompleted (regulator flag) | Century joint Development Private Limited | Mixed development | – | Completed |
| Comfot HeightsLapsed · completion date passed | Comfort Builders and Developers | Apartment | 1,015 sqft carpet (as filed) | Oct 2020 |
8 of 65 other projects in Uttarahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vkr Paradise in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 18 Apr 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2025 |
| Land conversion | Converted 21 Apr 2009 · BBMP | |
|---|---|---|
| Survey numbers | 82 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2bhk | 6 | 4,628 |
| 3bhk | 14 | 13,186 |
| Garden Square | about 2 km | Locked | |
|---|---|---|---|
| Sobha Royal Crest | about 3 km | Locked | |
| Song Of Wind | about 3 km | Locked | |
| Samaya Sunshine | about 3 km | Locked | |
| Srivara Vasudha | about 3 km | Locked | |
| Mahindra Eden Phase-2 | about 3.5 km | Locked | |
| Jhanavi Trishul Alaska | about 4 km | Locked | |
| Sumadhura Pramoda | about 4 km | Locked | |
| Adarsh Premia | about 4.5 km | Locked | |
| Sattva Forest Ridge | about 5 km | Locked | |
| Platinum Landmark | about 6.5 km | Locked | |
| Good Earth Ochre | about 6.5 km | Locked |
| Vkr Paradise This project | This project is the point the others are measured from | 31 Mar 2025 | – | Not verified yet |
|---|---|---|---|---|
| Garden Square | about 2 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Sobha Royal Crest | about 3 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Song Of Wind | about 3 km | 28 Feb 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, BEML Layout in RR Nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.10 (22 covered spaces for 20 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Mar 2025 | |
|---|---|---|
| RERA completion date | 31 Mar 2025 | Red flag |
| Work began, as filed | 5 Feb 2022 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 7.5 sq m |
|---|
| Architect's certificate, registration | Dated 20 Apr 2022 · site inspected 19 Apr 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 20 Apr 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹11.72 Cr | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹11.72 Cr, same as the filing |
| Escrow bank | CITY UNION BANK · J P NAGAR BRANCH |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63% (10 of 16) |
| Locked |
| Samaya Sunshine | about 3 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
|---|
| Srivara Vasudha | about 3 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Mahindra Eden Phase-2 | about 3.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Projects within 4 km, counted | 30 (30 with an approximate location) | |
|---|---|---|
| Flats in them | 5,134 | |
| Booked | 3,900 of 5,134 (76%) | |
| Unsold | 1,234 | |
| Booked a month, pooled | 82 flats | |
| Months to sell, pooled | 15 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Vajarahalli | |
| Metro, under construction | about 8 km, Hulimavu |
| Kempegowda Airport | 51 | 39 |
| MG Road (CBD) | 18 | 12 |
| Manyata Tech Park | 26.5 | 19.5 |
| ITPL, Whitefield | 35 | 25 |
| Ecospace, Bellandur ORR | 23 | 17 |
| Electronic City Ph 1 | 26 | 17.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named PLRD Electrict Yard on OpenStreetMap |