Photo: Harsha BTitle & ownership
Approvals
| Building plan (BMRDA) | Sanctioned 28 Mar 2024 · No. LAO/18/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 1,037 | |
| Booked | 1,028 of 1,037 (99%) | |
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 28 Mar 2024 | |
| Escrow bank | Canara Bank · SME HOSKOTE |
Data room
410 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 13 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 13 of 25 filed survey numbers matched, 12 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
All 48 projects in East Bengaluru → · Vr Builders And Developers's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vr Royal Township in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2026 |
| Land conversion | 34 of 34 parcels converted | |
|---|---|---|
| Sy SY No 2/3, Sy No 2/4, SY no 7/3,… | Converted 14 Sep 2022 · DC Conversion,Bangalore Rural | |
| Sy SY No 5/1, Sy No 5/1, SY no 5/2,… | Converted 2 Nov 2022 · DC Conversion,Bangalore Rural | |
| Sy SY no 5/2 | Converted 22 Nov 2022 · DC Conversion,Bangalore Rural | |
| Sy SY No 7/1 | Converted 27 Feb 2023 · DC Conversion,Bangalore Rural | |
| Sy Sy No 7/2, SY no 183, Sy No 184,… | Converted 11 Apr 2023 · DC Conversion,Bangalore Rural | |
| Sy SY No 183, SY no 184, SY No 186,… | Converted 14 Aug 2023 · DC Conversion,Bangalore Rural | |
| Other parcels | 3 more groups on the filing | |
| Survey numbers | SY No 2/3 · Sy No 2/4 · SY No 5/1 · Sy No 5/1 · SY no 5/2 · SY no 5/2 · Sy No 6/1 · SY no 6/1 · SY no 6/2 · Sy No 6/2 · SY No 7/1 · Sy No 7/2 · SY no 7/3 · Sy No 8 and 20 more parcels |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Unsold |
|---|
| 9 |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line passes 60 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 17.3 km, SIDDHARTHA LAYOUT KADUGODI | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the east, an unnamed water body |
As the promoter reported it
| Internal roads | 100% | |
|---|---|---|
| Completion | 77% | |
| Completion, accountant | 85.6% of the estimated cost spent |
| RERA completion date | 31 Dec 2026 | |
|---|---|---|
| Work began, as filed | 1 May 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect's certificate, registration | Site inspected 8 Jun 2024 | |
| Engineer's certificate, registration | Dated 8 Jun 2024 | |
| Chartered accountant's certificate, registration | Dated 7 Jun 2024 | |
| Chartered accountant, Form 4 | Dated 13 Oct 2026 |
Land · ₹18.00 Cr 47.3%Development · ₹20.09 Cr 52.7%
| Estimated cost, at registration | ₹38.08 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹18.59 Cr | |
| Cost incurred | ₹32.59 Cr (85.6% of the estimate) |
| Plots booked, Form 4 Q4 2025-26 | 103 |
|---|
| Escrow bank | Canara Bank · SME HOSKOTE | |
|---|---|---|
| Designated account, collected | ₹31.18 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹31.18 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹7,89,41,266 | |
| Net amount withdrawable, Form 4 | ₹0 | |
| Escrow account, Q2 2026-27 | ₹4.04 Cr withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹6.96 Cr withdrawn | |
| Share of collections deposited in escrow | 70% |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Chokkahalli Grama Panchayathi) | |
| Nearest city water main | 14.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 890 m above sea level, plus or minus 4 m | |
| Metro, operational | 17.9 km, Whitefield | |
| Metro, under construction | 18.2 km, KIA Terminal |
| Kempegowda Airport | 37.6 | 37 | 18.6 |
| MG Road (CBD) | 35.9 | 35 | 32.3 |
| Manyata Tech Park | 35.4 | 37 | 27.3 |
| ITPL, Whitefield | 26.4 | 27 | 20.1 |
| Ecospace, Bellandur ORR | 37.0 | 39 | 29.2 |
| Electronic City Ph 1 | 50.7 | 53 | 37.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.7 km to the west |