| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey 100-632-68/1
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 17 Feb 2026 · No. BBMP/AD.COM/EST/0160/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Builder: JAYALAKSHMI EXPORTS AND IMPORTS PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK 58.3%4BHK 41.7%
Location & risks
Construction & progress
Developer
Land · ₹9.74 Cr 32.7%Development · ₹20.01 Cr 67.3%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 17 Feb 2026 | |
| Escrow bank | Axis Bank · R T NAGAR |
Data room
Source: K-RERA project page and the documents filed there, as read by us. 22 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vruksha Grove in the interactive atlas
Approval or registration
Khata issued
A Khatha · BBMP · Survey 100-632-68/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/AD.COM/EST/0160/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/180926/008949
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 100-632-68/1 | |
|---|---|---|
| Land extent, Sy 100-632-68/1 | 708 SQ FEET | |
| Land area of this registration | 746 sq m | |
| Khata | A Khatha · BBMP · 16 Jul 2025 | |
| Sale deed | Dated 7 Jun 2024 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 100-632-68/1 |
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 7 | 8,686 |
| 4BHK | 5 | 8,654 |
| Magnolia Delight | about 2.5 km | Locked | |
|---|---|---|---|
| Renaissance Srichakra | about 3.5 km | Locked | |
| Sri Rama Enclave | about 4 km | Locked | |
| Assetz Soho & Sky | about 4.5 km | Locked | |
| Cumins Sanctum | about 5 km | Locked | |
| Vista Padmalaya | about 5 km | Locked | |
| Mirabelle Phase 2 | about 5 km | Locked | |
| Lodha Mirabelle | about 5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 5.5 km | Locked | |
| Royal Enclave | about 5.5 km | Locked | |
| Sumadhura Epitome | about 6 km | Locked | |
| Sumadhura Solea | about 6 km | Locked |
| Vruksha Grove This project | This project is the point the others are measured from | 31 Dec 2030 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 2.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Renaissance Srichakra | about 3.5 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Sri Rama Enclave | about 4 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Vasanthappa block Hebbal |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.25 (15 covered spaces for 12 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Dec 2030 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 17 Feb 2026 |
| Building heights, fire NOC | 14.12 m filed |
|---|
| Power backup | Provided, 5.5 sq m |
|---|
| Estimated cost, at registration | ₹29.75 Cr |
|---|
| Escrow bank | Axis Bank · R T NAGAR |
|---|
| 30 Sep 2026 |
| 61% (39 of 64) |
| Locked |
| Assetz Soho & Sky | about 4.5 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
|---|
| Cumins Sanctum | about 5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Vista Padmalaya | about 5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Projects within 4 km, counted | 6 (6 with an approximate location) | |
|---|---|---|
| Flats in them | 619 | |
| Booked | 261 of 619 (42%) | |
| Unsold | 358 | |
| Booked a month, pooled | 3 flats | |
| Months to sell, pooled | 111 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 3.5 km, Yeshwantpur | |
| Metro, under construction | about 2 km, Hebbal |
| Kempegowda Airport | 30 | 23 |
| MG Road (CBD) | 8 | 6.5 |
| Manyata Tech Park | 8 | 4.5 |
| ITPL, Whitefield | 23 | 17.5 |
| Ecospace, Bellandur ORR | 23.5 | 16 |
| Electronic City Ph 1 | 27.5 | 24 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Hebbal Substation on OpenStreetMap |