Home is always the best place to stay in ..
Overview
Warrior Lakeview
Overview
Warrior Lakeview
Overview
Warrior Lakeview
Overview
Photo: Harish VTitle & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Late-payment interest | SBI MCLR + 2% (Karnataka RERA Rules, r.16) | |
|---|---|---|
| Interest the builder pays on late possession | SBI MCLR + 2% (Karnataka RERA Rules, r.16) |
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 87 m² 53.5%2BHK · avg 54 m² 46.5%
Location & risks
Construction & progress
Developer
Land · ₹3.71 Cr 23.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 22 Sep 2022 | |
| Escrow bank | STATE BANK OF INDIA · SHRUNGAR SHOPPING CENTRE, MG ROAD |
Data room
126 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Home is always the best place to stay in ..
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
All 141 projects in Yelahanka → · Y V Constructions's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Warrior Lakeview in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 22 Sep 2022 · No. BBMP/Ad.Com./YLK/0721/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-121264 · issued 20 Oct 2022 · valid until 19 Oct 2027 | Clear |
| Water and sewerage NOC (BWSSB) | issued 30 Nov 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 6 Jun 2022 · DC BENGALURU URBAN | |
|---|---|---|
| Survey numbers | 122/1, PROPERTY NO./PID NO. 10 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 20 | 582 |
| 3BHK | 23 | 934 |
| Godrej Aveline | about 1 km | Locked | |
|---|---|---|---|
| Tnm Lakeview | about 1 km | Locked | |
| Legacy Salvador | about 2 km | Locked | |
| Assetz Zen & Sato | about 2.5 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3.5 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 3.5 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 3.5 km | Locked | |
| Sobha City Athena | about 4.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 5 km | Locked | |
| Riviera Glade | about 5 km | Locked | |
| Cumins Sanctum | about 5 km | Locked |
| Warrior Lakeview This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Godrej Aveline | about 1 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
| Tnm Lakeview | about 1 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
| Legacy Salvador | about 2 km | 31 Dec 2026 | 71% (119 of 167) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 1.5 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kathegenhalli Talanahalli |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.19 (51 covered spaces for 43 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 4 Mar 2025 |
|---|
| Schedule end | 31 Dec 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 1 Nov 2022 |
| Building heights, fire NOC | 11.49 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 15 sq m |
|---|
| Architect's certificate, registration | Dated 19 Oct 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 13 Oct 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹15.50 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹11.79 Cr |
Sold (22) 51.2%Unsold (21) 48.8%
| Flats sold, at completion | 22 | |
|---|---|---|
| Flats unsold, at completion | 21 | |
| Flats in the phase | 43 |
| Escrow bank | STATE BANK OF INDIA · SHRUNGAR SHOPPING CENTRE, MG ROAD |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Assetz Zen & Sato | about 2.5 km | 31 May 2030 | 44% (202 of 456) | Locked |
|---|
| 4square Park Sierra | about 2.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Projects within 4 km, counted | 49 (49 with an approximate location) | |
|---|---|---|
| Flats in them | 16,500 | |
| Booked | 10,021 of 16,500 (61%) | |
| Unsold | 6,479 | |
| Booked a month, pooled | 398 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 12 km, Yeshwantpur | |
| Metro, under construction | about 1 km, Bagalur Cross |
| Kempegowda Airport | 18.5 | 13.5 |
| MG Road (CBD) | 18 | 15.5 |
| Manyata Tech Park | 13.5 | 7.5 |
| ITPL, Whitefield | 29.5 | 19.5 |
| Ecospace, Bellandur ORR | 33.5 | 22 |
| Electronic City Ph 1 | 37.5 | 31.5 |
| Landfill or waste transfer station | about 3 km to the north-east | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Hinduja Ecopolis Substation on OpenStreetMap |