As of 17 Nov 2026
New projects in Kolkata, page 30
India
4,713 projects are registered with the real estate regulator in Kolkata, West Bengal. 3,944 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
3,296 of the 3,944 are still filed as under construction, and 1,555 are already past the completion date their promoter filed.
Projects 2,901 to 3,000 of 3,944
| SHESHER KOBITAWBRERA/P/KOL/2024/002286 | Aamar Bari | Kolkata | Mixed | Under construction | Dec 2027 | 14 |
| SHIB-KALPANAWBRERA/P/KOL/2025/002496 | P.G. Construction & Builders | Kolkata | Mixed | Under construction | Sep 2028 | 11 |
| SHIBALAYWBRERA/P/NOR/2023/000428 | Pioneer Associates | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Apr 2025 | 19 |
| SHIBALAYAWBRERA/P/KOL/2024/002005 | Amcon Projects | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2026 | 6 |
| SHIBALIK TOWER - 1WBRERA/P/NOR/2024/002125 | Pioneer Associates | North 24 Parganas | Apartments | Registered | Sep 2027 | 33 |
| SHIBALIK TOWER - 3WBRERA/P/NOR/2024/002231 | Pioneer Associates | North 24 Parganas | Apartments | Registered | Sep 2027 | 18 |
| SHIBALIK TOWER 2WBRERA/P/NOR/2025/002356 | Pioneer Associates | North 24 Parganas | Apartments | Registered | Sep 2027 | 20 |
| SHIBANI APARTMENTWBRERA/P/SOU/2025/002851 | K.R. Construction | South 24 Parganas | Mixed | Under construction | Jan 2027 | 18 |
| SHIBAYAN ENCLAVEWBRERA/P/KOL/2023/000510 | M/s. SREE JAGANNATH CONSTRUCTION | Kolkata | Apartments | Under constructionpast its filed completion date | Jun 2025 | 16 |
| SHIBNATH ABASANWBRERA/P/NOR/2025/002572 | L.S. Developer | North 24 Parganas | Apartments | Registered | May 2027 | 12 |
| SHILAWBRERA/P/SOU/2026/004302 | Roy Construction | South 24 Parganas | Apartments | Under construction | May 2027 | 8 |
| Shila BhabanWBRERA/P/KOL/2024/001277 | Swastik Enterprise & Construction | Kolkata | Apartments | Under constructionpast its filed completion date | Dec 2025 | 7 |
| SHILA RESIDENCYWBRERA/P/NOR/2023/000660 | S P D Construction & Developers | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Dec 2025 | 25 |
| SHILPA RESIDENCYWBRERA/P/NOR/2026/004005 | Shilpa Construction | North 24 Parganas | Mixed | Under construction | Jan 2027 | 16 |
| SHINTHIA APARTMENTWBRERA/P/KOL/2026/004190 | Sri Indrajit Das | Kolkata | Mixed | Under construction | May 2030 | 8 |
| SHIP HOUSEWBRERA/P/KOL/2024/001180 | M/S Rayconstruction | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2025 | 7 |
| SHIRDI SAIWBRERA/P/KOL/2023/000797 | Presidency Real Estate Private Limited | Kolkata | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| SHIV AANGANWBRERA/P/KOL/2026/004097 | M/S Narayana Enterprise | Kolkata | Apartments | Under construction | Sep 2030 | 13 |
| Shiv Kali ApartmentHIRA/P/NOR/2020/001046 | S K Enterprise | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Dec 2022 | 22 |
| SHIV NIBASWBRERA/P/NOR/2025/003332 | Shiv.Con | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Apr 2026 | 12 |
| SHIV SANKAR APARTMENTWBRERA/P/NOR/2023/000467 | P.M. Weltech | North 24 Parganas | Mixed | Under construction | Dec 2028 | 30 |
| SHIV SHAKTI APARTMENTWBRERA/P/SOU/2026/004341 | M/S Japonica International Pvt Ltd | South 24 Parganas | Apartments | Registered | Nov 2027 | 16 |
| Shiv Shakti AppartmentWBRERA/P/NOR/2025/003281 | Shiv Shakti Construction | North 24 Parganas | Apartments | Under construction | Dec 2026 | 16 |
| SHIV SHAKTI APPARTMENTWBRERA/P/KOL/2026/004234 | Rakshit Housing Associates | Kolkata | Mixed | Under construction | Mar 2030 | 7 |
| SHIV SHAKTI GOLDWBRERA/P/KOL/2025/002328 | Trident Realty, | Kolkata | Apartments | Under constructionpast its filed completion date | Dec 2025 | 6 |
| Shiv Shakti JadeWBRERA/P/KOL/2026/004034 | Trident Realty, | Kolkata | Mixed | Under construction | Apr 2027 | 7 |
| SHIV SHAKTI OPALWBRERA/P/KOL/2025/003421 | Trident Realty, | Kolkata | Mixed | Under construction | Dec 2026 | 4 |
| SHIV SHAKTI SAPPHIREWBRERA/P/KOL/2025/002573 | Trident Realty, | Kolkata | Mixed | Under constructionpast its filed completion date | Dec 2025 | 7 |
| SHIV SHANKAR APARTMENTWBRERA/P/NOR/2023/000916 | S.S.Enterprise | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Dec 2025 | 46 |
| SHIVAWBRERA/P/KOL/2025/003717 | G.P. Construction | Kolkata | Apartments | Under construction | Jul 2029 | 16 |
| SHIVA APARTMENTWBRERA/P/KOL/2024/001382 | Shivaa Construction | Kolkata | Apartments | Under constructionpast its filed completion date | Dec 2024 | 6 |
| SHIVA GARDENSWBRERA/P/NOR/2024/001466 | Mercstone International Private Limited | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Mar 2025 | 80 |
| SHIVA SHAKTI APARTMENTWBRERA/P/KOL/2025/002598 | Debdutta Mondal | Kolkata | Apartments | Under constructionpast its filed completion date | Jul 2026 | 9 |
| ShivalayHIRA/P/NOR/2019/000427 | Chariot Realty And Infra Llp | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Oct 2019 | 5 |
| SHIVALAY APARTMENTWBRERA/P/KOL/2024/001984 | GDS Construction Pvt Ltd | Kolkata | Mixed | Under constructionpast its filed completion date | Jun 2026 | 7 |
| SHIVALAYAWBRERA/P/HOO/2024/001823 | Satyam Construction Private Limited | Hooghly | Apartments | Under construction | Dec 2028 | 9 |
| SHIVALAYAWBRERA/P/KOL/2023/000765 | Shubhanksh Private Limited | Kolkata | Apartments | Under construction | May 2028 | 14 |
| SHIVALAYAWBRERA/P/NOR/2024/001127 | U. S. Realtors | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Mar 2026 | 38 |
| SHIVALAYA APARTMENTWBRERA/P/SOU/2024/002262 | Shivalaya Constructions | South 24 Parganas | Apartments | Under constructionpast its filed completion date | Jun 2026 | 12 |
| SHIVALIKWBRERA/P/KOL/2025/002344 | M. R. Constructions | Kolkata | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| ShivamWBRERA/P/KOL/2024/001563 | Gopala Enclave Private Limited | Kolkata | Apartments | Under construction | Sep 2028 | 44 |
| SHIVAMWBRERA/P/KOL/2024/001459 | Rp Jeet Developers Private Limited | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2026 | 9 |
| SHIVAMWBRERA/P/KOL/2026/004063 | Shivam Construction | Kolkata | Mixed | Under construction | Jan 2030 | 14 |
| SHIVAMWBRERA/P/NOR/2024/001041 | Satvan Realty | North 24 Parganas | Apartments | Under construction | Jan 2027 | 7 |
| SHIVAM APARTMENTWBRERA/P/NOR/2023/000585 | Debnath Construction | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Jun 2024 | 28 |
| SHIVAM APARTMENTWBRERA/P/NOR/2024/001575 | Shivam Real Estate & Construction Company | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Oct 2026 | 12 |
| SHIVAM APARTMENTWBRERA/P/NOR/2026/004774 | Maa Mangal Chandi Construction | North 24 Parganas | Mixed | Under construction | Jun 2027 | 20 |
| SHIVAM PLAZAWBRERA/P/KOL/2025/003448 | M/S Shivam Construction | Kolkata | Apartments | Under construction | Dec 2028 | 11 |
| SHIVAM RESIDENCYWBRERA/P/KOL/2025/003705 | M/s. SHIVAM CONSTRUCTION | Kolkata | Apartments | Under construction | Dec 2028 | 33 |
| SHIVAM SHIVALAYWBRERA/P/SOU/2025/003559 | Shivam Construction | South 24 Parganas | Apartments | Under constructionpast its filed completion date | Oct 2026 | 14 |
| ShiveshWBRERA/P/KOL/2024/001673 | Swastic Projects Private Limited | Kolkata | Apartments | Under construction | Aug 2028 | 36 |
| SHIVLOKWBRERA/P/SOU/2023/000595 | Prakash Builders Pvt. Ltd | South 24 Parganas | Mixed | Under construction | Nov 2027 | 82 |
| SHIVOHAM COURTHIRA/P/NOR/2019/000358 | Shivoham Builders And Developers | North 24 Parganas | Apartments | Registered | Feb 2018 | 20 |
| SHIVOHAM VATIKAWBRERA/P/NOR/2024/002061 | Shivoham Infraprojects | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Dec 2025 | 13 |
| SHIVOM APARTMENTWBRERA/P/NOR/2023/000487 | M/s. BASU CONSTRUCTION | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Mar 2024 | 14 |
| SHIVSHAKTI APARTMENTWBRERA/P/HOW/2025/002757 | Rimjhim Infracon Pvt Ltd | Howrah | Mixed | Under construction | Aug 2029 | 12 |
| SHIVSHAKTI IIWBRERA/P/KOL/2025/003628 | Rimjhim Infracon Pvt Ltd | Kolkata | Mixed | Under construction | Aug 2028 | 4 |
| SHOVONA HIGHTSHIRA/P/NOR/2019/000312 | Shovona Project Privat Limited | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Sep 2024 | 35 |
| SHRACHI PEARLHIRA/P/NOR/2018/000238 | GNB Logistics LLP | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Dec 2021 | 48 |
| SHRADHANJALIWBRERA/P/KOL/2025/003420 | Dilip Enterprise | Kolkata | Mixed | Under construction | Mar 2027 | 8 |
| SHREE GANESHWBRERA/P/KOL/2023/000440 | M/S Tapas Roy | Kolkata | Mixed | Under construction | Jun 2027 | 11 |
| SHREE GRIHAM ENCLAVEWBRERA/P/SOU/2024/001962 | Shree Griham Enclave | South 24 Parganas | Mixed | Registered | Dec 2027 | 15 |
| SHREE GURUWBRERA/P/KOL/2025/003282 | Nuhro Edifice | Kolkata | Mixed | Under construction | Apr 2028 | 13 |
| SHREE HARI ANANDAWBRERA/P/HOO/2024/000949 | Shree Hari Realty | Hooghly | Apartments | Under constructionpast its filed completion date | Jul 2025 | 25 |
| SHREE HARI GOKULAMWBRERA/P/HOO/2024/001235 | Sree Hari Nirman | Hooghly | Apartments | Under constructionpast its filed completion date | Apr 2026 | 36 |
| SHREE HARI NIWASWBRERA/P/HOO/2025/002410 | Shree Hari Developers | Hooghly | Apartments | Under construction | Dec 2028 | 16 |
| SHREE HARI VRINDAVANWBRERA/P/HOO/2025/003176 | Sree Hari Nirman | Hooghly | Apartments | Under construction | Dec 2028 | 80 |
| Shree HeightsWBRERA/P/KOL/2024/001449 | Shree Construction | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2026 | 11 |
| SHREE HEIGHTSWBRERA/P/HOO/2023/000504 | Dream Royally Llp | Hooghly | Mixed | Registered | Sep 2027 | 127 |
| SHREE KUNJWBRERA/P/SOU/2023/000423 | Shree Construction | South 24 Parganas | Apartments | Under constructionpast its filed completion date | Mar 2025 | 32 |
| Shree MirayaWBRERA/P/NOR/2025/002584 | Shree Kedia Realtech LLP | North 24 Parganas | Mixed | Registered | Dec 2028 | 86 |
| SHREE RAM EMPIREWBRERA/P/KOL/2025/002834 | Shree Ram Empire Private Limited | Kolkata | Apartments | Under constructionpast its filed completion date | Jun 2026 | 6 |
| SHREE SAI APARTMENTWBRERA/P/HOW/2023/000470 | Tirupati Constructions | Howrah | Apartments | Under constructionpast its filed completion date | Mar 2024 | 12 |
| Shree Sai NiwasHIRA/P/KOL/2020/000841 | Tirupati Balaji Construction | Kolkata | Apartments | Under constructionpast its filed completion date | Sep 2022 | 16 |
| SHREE SHANKAR TOWERWBRERA/P/KOL/2025/003711 | Rimjhim Infracon Pvt Ltd | Kolkata | Mixed | Under construction | Dec 2029 | 14 |
| SHREE SIDDHI NIBASWBRERA/P/NOR/2026/003964 | Nibas Nirman | North 24 Parganas | Apartments | Under construction | Dec 2026 | 12 |
| SHREE SKY HOMESWBRERA/P/HOW/2026/004121 | Richmond Rawalwasia Developers Llp | Howrah | Apartments | Registered | Nov 2029 | 170 |
| SHREEDURGA APARTMENTWBRERA/P/NOR/2025/003516 | New Greenland Construction Prop. Subir Golui | North 24 Parganas | Mixed | Under construction | Nov 2029 | 22 |
| SHREEGURU APARTMENTWBRERA/P/KOL/2024/001752 | Ms Shreeguru Enterprise | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2025 | 11 |
| ShreemanihaatWBRERA/P/KOL/2024/001637 | Siom Realty Private Limited | Kolkata | Commercial | Under construction | Sep 2027 | 198 |
| ShreenikaWBRERA/P/NOR/2024/001622 | Shreerudram Infra & Allied Services Private Limited | North 24 Parganas | Mixed | Under constructionpast its filed completion date | Jun 2026 | 29 |
| SHREEPATI GRIHAMWBRERA/P/KOL/2023/000429 | Griham Properties | Kolkata | Mixed | Under constructionpast its filed completion date | Mar 2026 | 9 |
| SHREEPATI TEMPLEWBRERA/P/KOL/2023/000884 | Shreepati Apartments Private Limited | Kolkata | Apartments | Under constructionpast its filed completion date | Mar 2026 | 11 |
| SHREEVILLAHIRA/P/SOU/2021/001166 | Shrivridhi Construction | South 24 Parganas | Apartments | Registered | Nov 2024 | 20 |
| SHRESHTA GARDEN PHASE IVHIRA/P/NOR/2019/000422 | Shreshta Construction Pvt Ltd | North 24 Parganas | Mixed | Registered | Jun 2018 | 60 |
| Shri RamniwasWBRERA/P/KOL/2025/002742 | Swastic Projects Private Limited | Kolkata | Apartments | Under construction | Oct 2029 | 24 |
| SHRIRAM SIGNATURE SQUAREWBRERA/P/HOO/2025/003412 | Bengal Shriram Hitech City Private Limited | Hooghly | Commercial | Registered | Aug 2030 | 187 |
| SHRIRAM SKYBLOOM VILLASWBRERA/P/HOO/2025/003434 | Bengal Shriram Hitech City Private Limited | Hooghly | Apartments | Registered | Aug 2030 | 198 |
| SHRIRAM SOUTHBROOKWBRERA/P/HOO/2026/004276 | Bengal Shriram Hitech City Private Limited | Hooghly | Other | Registered | Mar 2031 | 52 |
| Shriram SpringfieldWBRERA/P/HOO/2025/003088 | Spl Estates Pvt Ltd | Hooghly | Apartments | Registered | Jun 2030 | 448 |
| SHRIVATSHIRA/P/KOL/2018/000171 | Hazra Exotica Llp | Kolkata | Apartments | Under constructionpast its filed completion date | Jun 2021 | 45 |
| SHUBHAMWBRERA/P/HOO/2023/000232 | Tirupati Construction | Hooghly | Mixed | Under constructionpast its filed completion date | Oct 2026 | 26 |
| Shubham ResidenceWBRERA/P/HOO/2024/002155 | Balaji Projects | Hooghly | Apartments | Under construction | May 2027 | 24 |
| SHUKHOBRISHTIWBRERA/P/KOL/2025/003484 | Griho Nirman Associates | Kolkata | Apartments | Under construction | Jul 2029 | 15 |
| Shukhobrishti Spandan Phase 10HIRA/P/NOR/2019/000724 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Sep 2024 | 282 |
| Shukhobrishti Spandan Phase 11HIRA/P/NOR/2020/000861 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Registered | Apr 2025 | 348 |
| Shukhobrishti Spandan Phase 6 & 7HIRA/P/NOR/2019/000652 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Oct 2021 | 2,058 |
| Shukhobrishti Spandan Phase 8HIRA/P/NOR/2018/000178 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Under constructionpast its filed completion date | Jun 2022 | 934 |
| Shukhobrishti Spandan Phase 9HIRA/P/NOR/2018/000280 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Under constructionpast its filed completion date | May 2023 | 1,050 |
| Shukhobrishti Spriha Phase 11HIRA/P/NOR/2020/000862 | Bengal Shapoorji Housing Development Pvt Ltd | North 24 Parganas | Apartments | Registered | Apr 2027 | 792 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region