Building plan (BDA)Sanctioned 8 May 2026No. BDA/PA/ME/AA-5/TA-4/E/05/2026-27
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 17 of 17 parcelsDates and authorities below
Permits
Approval letters
Building plan (BDA)
Sanctioned 8 May 2026 · No. BDA/PA/ME/AA-5/TA-4/E/05/2026-27
Power NOC
Filed with the registration
Fire NOC
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
3BHK · avg 97 m² 78.2%2BHK · avg 73 m²
Location & risks
What is the location like?
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operationalabout 9.5 kmNallur Halli
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion0%As of Q2 2026-27, promoter's return
Progress
Site photos filed with K-RERA, Q2 2026-27
Developer
Can the developer deliver?
Sold0 / 1,000As of Q2 2026-27
Funding
Estimated cost
Land · ₹60.65 Cr 7.7%Development · ₹723.38 Cr 92.3%
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 8 May 2026
Escrow bank
HDFC · Kasturba Road Branch, Bangalore
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
246 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Abhee City Urban Glenn Phase II in the interactive atlas
131/1
19 Sep 2025Deputy Commissioner
1 Sep 2022
3 Oct 2022E Khatha · Thasildhar
20 Guntas
131/3, 131/2
30 Jan 2025Deputy Commissioner
19 Jan 2023
31 Jan 2025E Khatha · Thasildhar
1 Acre 25 Guntas
131/2
19 Sep 2025Deputy Commissioner
24 Sep 2026in favour of Abhee Ventures Private Limited
18 Sep 2026E Khatha · Thasildhar
3 Guntas
131/11, 131
19 Sep 2025Deputy Commissioner
27 Feb 2026in favour of Manjunath K V & others
30 May 2026E Khatha · Thasildhar
5.08 Guntas
131/12, 131
19 Sep 2025Deputy Commissioner
18 Sep 2025in favour of Ramoji Gowda & another
30 May 2026E Khatha · Thasildhar
8 Guntas
131/13, 131
19 Sep 2025Deputy Commissioner
27 Feb 2026in favour of Rajanna K L & another
30 May 2026E Khatha · Thasildhar
13 Guntas
131/14, 131
19 Sep 2025Deputy Commissioner
9 Mar 2026in favour of Chandrashekar N S & another
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Sy No. 131/10 (Old Sy No. 131/, Sy No. 131/1, Sy No. 131/3 (old Sy No. 131/2, Sy No. 130/5, Sy No. 130/6, Sy No.130/7 and 11 more
Land area of this registration
31,399 sq m
Khata
E Khatha · Thasildhar · 30 May 2026; E Khatha · Thasildhar · 3 Oct 2022; E Khatha · Thasildhar · 31 Jan 2025; and 3 more
Sale deed
Dated 11 Apr 2007, 21 Jan 2010, 18 Mar 2015 and 6 more
Sale deed in favour of
Abhee Ventures Private Limited, Manjunath K V & others, Ramoji Gowda & another and 4 more
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Title report; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Environmental clearance
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2033
Registration certificates
PRM/KA/RERA/1251/308/PR/300926/008986
Land use
Conversion order
Land conversion
17 of 17 parcels converted
Sy Sy No. 131/10 (Old Sy No. 131/, S…
Converted 19 Sep 2025 · Deputy Commissioner
Sy Sy No. 131/3 (old Sy No. 131/2
Converted 30 Jan 2025 · Deputy Commissioner
Sy Sy No. 130/5, Sy No. 130/6, Sy No…
Converted 21 May 2024 · Deputy Commissioner
Sy Sy No. 130/2, Sy No. 129/1, Sy No…
Converted 29 Sep 2023 · Deputy Commissioner
Survey numbers
Sy No. 131/10 (Old Sy No. 131/ · Sy No. 131/1 · Sy No. 131/3 (old Sy No. 131/2 · Sy No. 130/5 · Sy No. 130/6 · Sy No.130/7 · Sy No. 130/8 · Sy No. 130/1 and 9 more parcels
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Receivable, sold flats; Cost left; Sold in the latest quarter; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Sold per quarter; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Borewell
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot