Good place to live, Low-density, With decent amenities..
Overview
Adarsh Pinecourt
Overview
Adarsh Pinecourt
Overview
Adarsh Pinecourt
Overview
Photo: Komol hossainGood place to live, Low-density, With decent amenities..
My brother bought a flat here. Very beautiful apartment, good ventilation, spacious gardens and swimming pool, elite hall for functions - 💯
The people are too frustrating Do NOT deal with landowner units, he will call you for a meeting and talk all things apart from closing the deal. He made me wait for 45 days and suddenly said, he doesn't want to sell. He will just look to…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | 1 | 2 | Red flag |
| Disputes & cases | – | 1 | 1 | Review |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Environmental clearance (1 of 2) | SEIAA 27 CON 2017 · issued 25 Apr 2017 | Clear |
| Environmental clearance (2 of 2) | SEIAA 68 CON 2017 · issued 28 Apr 2017 | Clear |
Disputes & cases
Builder: Nusrath Unisa
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Pending 5 | |||||||
|---|---|---|---|---|---|---|---|
| 13 Nov 2025 | O.S./2172/2025 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | Sarasamma; Neelamma; Saroja; and 2 others | Narayanaswamy D; Bhagyamma - D2; Jaykumar - D3; and 37 others | Original suit (civil) | Pending, Medium: Not decided yet. |
| 30 Jun 2025 | O.S./4620/2025 | City Civil Court Complex, Bangalore | Bengaluru | BABU S; PRAKASH PALANI; GOPI PALANI | VARIN INFRA PROJECTS PRIVATE LIMITED | Original suit (civil) | Pending, Medium: Not decided yet. |
| 31 May 2025 | O.S./2176/2025 | KR Puram Court Complex | Bengaluru Rural | VARIN INFRA PROJECTS PRIVATE LIMITED REP BY B.M. KARUNESH | PRAKASH CHAND KOTHARI; SUDHA CHURIWAL REP BY GPA HOLDER SUSHIL KUMAR CHURIWALA | Original suit (civil) | Pending, Low: Filed by the promoter or developer, not against it.Next hearing 9 Oct 2026 |
| 3 May 2025 | O.S./1400/2025 | KR Puram Court Complex | Bengaluru Rural | VARIN INFRA PROJECT PVT | H V MANJUNATH @ MANJUNATH HOODI AND OTHERS; SONA SHABNAM; MAHESH KHETSHI GOSRANI @ MAHESH KHETSHI SHAH; and 5 others | Original suit (civil) | Pending, Low: Filed by the promoter or developer, not against it. |
| 30 Aug 2021 | O.S./649/2021 | Court Complex- Anekal | Bengaluru Rural | Muni Thayamma; Narayanappa | K.M. Balakrishna; Pavan; Praveen; and 18 others | Original suit (civil) | Pending, Medium: Not decided yet. |
| Disposed 16 | |||||||
| 28 Jan 2026 | COMP.APPL - 25/2026 | Nclt | – | Akarshak Realty Private Limited; Shreshta Apartments Private Limited; Akarsh Residence Private Limited; and 17 others | – | Company law petition | Disposed, Low: Decided or closed. |
| 9 Sep 2025 | C.P.(CAA)/39/BEN/2025 | Nclt | – | Shreshta Apartments Private Limited; Akarsh Residence Private Limited; Vismaya Builders and Developers Private Limited; and 17 others | Karnataka Real Estate Regulatory Authority ( KARNATAKA STATE REAL ESTATE REGULATORY AUTHORITY | Company law petition | Disposed, Low: Decided or closed. |
| 2 May 2025 | AA/4/2025 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | Lubna Shah | B M Jayeshankar; B M KARUNESH; VARIN INFRA PROJECT PVT LTD; and 4 others | Arbitration case | Disposed, Low: Decided or closed. |
| 24 Mar 2025 | C.A.(CAA)/18/BEN/2025 | Nclt | – | Adarsh Ecstasy Projects Private Limited; Adarsh Haven Private Limited; Adarsh Realty and Hotels Private Limited; and 17 others | – | Company law petition | Disposed, Low: Decided or closed. |
| 16 Aug 2023 | O.S./1137/2023 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | VARIN INFRA PROJECT PVT | H V MANJUNATH @ MANJUNATH HOODI AND OTHERS; SONA SHABNAM; MAHESH KHETSHI GOSRANI @ MAHESH KHETSHI SHAH; and 5 others | Original suit (civil) | Disposed, Low: Decided or closed. |
| 25 Jan 2023 | O.S./141/2023 | Court Complex- Anekal | Bengaluru Rural | Kumar.B.M | Puttamma; Basavaraju.B.M; G.K. Suvarni; and 7 others | Original suit (civil) | Disposed, Low: Decided or closed. |
| 9 Dec 2022 | 182/2022 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | NITIN KHETSHI GOSRANI ALIAS NITIN SHAH REP. BY HIS DULY CONSTITUED ATTORNEY | R LAKSHMAIAH; YESHODHAMMA; M/S. VICRORIAN VIEW; and 16 others | Miscellaneous petition | Disposed, Low: Decided or closed. |
| 9 Dec 2022 | 183/2022 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | MUKESH HIRJI SHAH REP. BY HIS DUTY CONSTITUTED ATTORNEY K.V NARAYAN | R LAKSHMAIH; YESHODHAMMA; M/S VICTORIAN VIEW; and 16 others | Miscellaneous petition | Disposed, Low: Decided or closed. |
| 7 Dec 2022 | 180/2022 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | MAHESH KHETSHI GOSRANI ALIAS MAHESH KETSHI SHAH REP. BY K V NARAYAN | R LAKSHMAIAH; YESHODHAMMA; M/S VICTORIAN VIEW; and 16 others | Miscellaneous petition | Disposed, Low: Decided or closed. |
| 7 Dec 2022 | 181/2022 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | VEIKESH GANATRA REP.BY HIS DULY CONSTITUTED ATTORNEY K.V. NARAYAN | R LAKSHMAIAH; YESHODHAMMA; M/S VICTORIAN VIEW REP.BY ITS PATNER SYED JAVEED AHMED; and 12 others | Miscellaneous petition | Disposed, Low: Decided or closed. |
| 10 Feb 2022 | O.S./158/2022 | Court Complex- Anekal | Bengaluru Rural | Puttamma | Basavaraju.B.M; Ravi Kumar B.M; G.K. Suvarni; and 7 others | Original suit (civil) | Disposed, Low: Decided or closed. |
| 7 Jan 2022 | P.C.R./103/2022 | SmallCauses Court Complex,Bangalore | Bengaluru | RELIANCE HOME FINANCE LTD | VARIN INFRA PROJECTS PVT LTD | Private criminal complaint | Disposed, Low: Decided or closed. |
| 7 Jan 2022 | O.S./39/2022 | Court Complex- Anekal | Bengaluru Rural | Lakshmamma; Rudresh | Muniyappa; Munindrappa; V. Mohan Kumar; and 10 others | Original suit (civil) | Disposed, Low: Decided or closed. |
| 11 Sep 2020 | O.S./586/2020 | Court Complex- Anekal | Bengaluru Rural | Muniyamma; Narayanappa | Thimmakka; K.M. Balakrishna; Kali Cheluvi; and 31 others | Original suit (civil) | Disposed, Low: Decided or closed. |
| 27 Sep 2019 | O.S./1332/2019 | City Civil Court Complex Bengalurur Rual | Bengaluru Rural | VARIN INFRA PROJECTS PRIVATE LIMITED REP BY B.M. KARUNESH | PRAKASH CHAND KOTHARI; SUDHA CHURIWAL REP BY GPA HOLDER SUSHIL KUMAR CHURIWALA | Original suit (civil) | Disposed, Low: Decided or closed. |
| 4 May 2017 | 232/2017 | Cjm Rural Court, Bengaluru | Bengaluru | Mukesh Hirji Shah; Bipin Nathalal Shah; Mahesh Khetshi Gosarani Alias Mahesh Knetshi Shah; and 3 others | R. Lakshmaiah; Yashodamma; Victorian View; and 16 others | Private criminal complaint | Disposed, Low: Decided or closed. |
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Search pending. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹23.70 Cr |
|---|
Loan & collateral
| Records searched to | 29 Sep 2023 | Review |
|---|---|---|
| Escrow bank | HDFC · Vasanth Nagar |
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
| Amrutha NandhiCompleted · OC 14-12-2022 | BHOO DEVELOPERS | Apartment | 961–1,292 sqft carpet (as filed) | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Adarsh Pinecourt in the interactive atlas
Title deed executed
Title deed filed with K-RERA, p. 1 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/191025/002975
K-RERA registration
Transfer of the landApproval or registrationTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 29 Sep 2023 |
|---|
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 68 (J.I.Chikkagubbi) |
| East | EC schedule not read yet | Survey 62, 67 (J.I.Chikkagubbi) |
| South | EC schedule not read yet | Survey 56, 61 (J.I.Chikkagubbi) |
| West | EC schedule not read yet | road |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 2 pages, English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 14,987 sq m | |
| Land area filed with K-RERA | 16,693 sq m | |
| Filed area as a share of the KGIS plots' area | 111% | |
| Village, hobli and taluk on the KGIS map | J.I.Chikkagubbi, Bidarahalli-3 hobli, Bangalore-East taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | 14,987 sq m, 1 of 1 filed survey numbers | |
|---|---|---|
| Land area of this registration | 16,693 sq m |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 91 | 1 | 4 acres 5 guntas | 3 acres 28 guntas | Differs: 17 guntas apart | Not read yet |
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted | |
|---|---|---|
| RERA completion date | 28 Nov 2023 | |
| Registration status | Withdrawn | Red flag |
Court records searched by the builder's and the project's names on 14 Nov 2026: 74 cases returned, 21 name this project's promoter company or this project (21 not listed before). The rest name other parties and are left out.
| Adarsh Pinecourt | about 0.5 km | Locked |
|---|
| Radiance Floresta | about 0.5 km | Locked |
|---|
| The Pearl Paradise | about 1.5 km | Locked |
|---|
| Sattva La Vita | about 2 km | Locked |
|---|
| Nava Skanda Bellavita | about 2 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 3 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 3 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3 km | Locked |
|---|
| Sobha City Athena | about 3 km | Locked |
|---|
| Brr North Excellency Phase I | about 4 km | Locked |
|---|
| Sumadhura Solea | about 4.5 km | Locked |
|---|
| Adarsh Pinecourt This project | This project is the point the others are measured from | 28 Nov 2023 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Pinecourt | about 0.5 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
| Radiance Floresta | about 0.5 km | 31 May 2028 | 100% (65 of 65) | Locked |
| The Pearl Paradise | about 1.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Sattva La Vita | about 2 km | 12 Jul 2026 | 32% (20 of 63) | Locked |
| Nava Skanda Bellavita | about 2 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
| Projects within 4 km, counted | 52 (52 with an approximate location) | |
|---|---|---|
| Flats in them | 13,118 | |
| Booked | 7,727 of 13,118 (59%) | |
| Unsold | 5,391 | |
| Booked a month, pooled | 233 flats | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 4.5 km, Telecom layout, Ashwathnagar |
|---|
| Nearest storm drain | about 0.5 km, BD417, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Schedule end | 31 Dec 2021 | |
|---|---|---|
| RERA completion date | 28 Nov 2023 | |
| Work began, as filed | 1 Jun 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance (1 of 2) | SEIAA 27 CON 2017 · issued 25 Apr 2017 | |
|---|---|---|
| Environmental clearance (2 of 2) | SEIAA 68 CON 2017 · issued 28 Apr 2017 |
| Escrow bank | HDFC · Vasanth Nagar | |
|---|---|---|
| Registration at K-RERA | Withdrawn |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 119 (86 completed, 33 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, BD417, secondary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, K.R. Puram | |
| Metro, under construction | about 6 km, Nagawara |
| Kempegowda Airport | 20.5 | 13.5 |
| MG Road (CBD) | 16.5 | 13.5 |
| Manyata Tech Park | 10 | 6.5 |
| ITPL, Whitefield | 20.5 | 13.5 |
| Ecospace, Bellandur ORR | 26.5 | 17.5 |
| Electronic City Ph 1 | 36.5 | 27.5 |
| Landfill or waste transfer station | about 2.5 km to the north-west | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south |