Overview
Amogaya Adorit
Overview
Amogaya Adorit
Overview
Amogaya Adorit
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC Bengaluru · Survey 150400401601222849
K-RERA filing, land schedule
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 14 Feb 2025 · No. HTP/CC/152/2024-25/2962 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 102 m² 90%2.5BHK · avg 79 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 14 Feb 2025 | |
| Escrow bank | ICICI Bank · Indira Nagar |
Data room
127 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Amogaya Adorit in the interactive atlas
Approval or registration
Khata issued
E Khatha · Mandur Panchayath Office PDO · Survey 150400401601222849
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HTP/CC/152/2024-25/2962
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/230425/007689
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 9 of the encumbrance certificate. Filed with K-RERA: EC from 22122023 to till date for all Survey Numbers, 9 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 150400401601222849 | |
|---|---|---|
| Land extent, Sy 150400401601222849 | 01Acre, 39.50Gunta / 8043Sq Mtr | |
| Land area of this registration | 7,714 sq m | |
| Khata | E Khatha · Mandur Panchayath Office PDO · 23 Oct 2024 |
| KSFES/NOC/228/2024 · issued 15 Jul 2024 | Clear |
| Environmental clearance | SEIAA 167 CON 2024 · EC identification no. EC24C3801KA5616942N · issued 1 Feb 2025 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2030 |
| Land conversion | Converted 24 Jul 2024 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 150400401601222849 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2.5BHK | 13 | 850 |
| 3BHK | 117 | 1,099 |
| Sold, Q2 2026-27 | 54 / 130 | |
|---|---|---|
| Unsold, Q2 2026-27 | 76 | |
| Months to sell, derived from filed bookings | 25 months |
| Godrej Woodscapes | about 1.5 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 1.5 km | Locked | |
| Neighbourhood Tree Park | about 2 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | Locked | |
| Chaithanya Sankhya | about 2.5 km | Locked | |
| Definer Upper Deck | about 2.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 4 km | Locked | |
| Riqueza Siri | about 5 km | Locked | |
| Sowparnika Euphoria in the East | about 5 km | Locked |
| Amogaya Adorit This project | This project is the point the others are measured from | 31 Mar 2030 | 42% (54 of 130) | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 1.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 1.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
| Neighbourhood Tree Park |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5.5 km, TRIVENI NAGAR NEAR KR PURAM |
|---|
| Nearest storm drain | about 2 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Covered parking per unit | 1.25 (163 covered spaces for 130 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 13 Aug 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2029 | |
| Club house | Not started | |
| Completion | 40% | |
| Completion, accountant | 39.6% of the estimated cost spent |
| Schedule end | 25 Feb 2030 | |
|---|---|---|
| RERA completion date | 31 Mar 2030 | |
| Work began, as filed | 1 Apr 2025 |
| Building heights, fire NOC | 44.98 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 13 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/228/2024 · issued 15 Jul 2024 | |
| Environmental clearance | SEIAA 167 CON 2024 · EC identification no. EC24C3801KA5616942N · issued 1 Feb 2025 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 10 Mar 2025 · site inspected 10 Mar 2025 | |
| Engineer's certificate, registration | Dated 10 Mar 2025 | |
| Architect's quarterly progress certificate dated | 14 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 11 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹45.83 Cr 35.3%Development · ₹84.00 Cr 64.7%
| Estimated cost, at registration | ₹129.83 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹84.00 Cr | |
| Cost incurred | ₹51.42 Cr (39.6% of the estimate) | |
| Cost left | ₹78.41 Cr | |
| Receivable, sold flats | ₹48.73 Cr |
Sold (54) 41.5%Unsold (76) 58.5%
| Sold, Q3 2025-26 | 27 / 130 · 103 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 130 · 130 available | |
| Sold, Q1 2026-27 | 55 / 130 · 75 available | |
| Sold, Q2 2026-27 | 54 / 130 · 76 available | |
| Unsold, Q2 2026-27 | 76 | |
| Sold in Q4 2025-26 | 27 bookings cancelled or corrected (27 → 0 sold) | |
| Sold in Q1 2026-27 | 55 | |
| Sold in Q2 2026-27 | 1 booking cancelled or corrected (55 → 54 sold) |
| Escrow bank | ICICI Bank · Indira Nagar | |
|---|---|---|
| Designated account, collected | ₹6.04 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.85 Cr in Q2 2026-27 (64% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 31 Dec 2028 |
| 27% (25 of 93) |
| Locked |
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Projects within 4 km, counted | 49 (49 with an approximate location) | |
|---|---|---|
| Flats in them | 17,209 | |
| Booked | 8,866 of 17,209 (52%) | |
| Unsold | 8,343 | |
| Booked a month, pooled | 282 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Panchayath Office) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | about 10.5 km, Saraswathi Nagar |
| Kempegowda Airport | 26.5 | 16 |
| MG Road (CBD) | 23 | 19 |
| Manyata Tech Park | 22.5 | 15 |
| ITPL, Whitefield | 11.5 | 8.5 |
| Ecospace, Bellandur ORR | 22 | 17 |
| Electronic City Ph 1 | 37.5 | 26 |
| Landfill or waste transfer station | about 2 km to the west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south, named Kondaspura on OpenStreetMap |