Building plan (BBMP)Sanctioned 6 Feb 2026No. PRJ/3010/25-26
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 2 of 2 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedBorewell, BWSSBDeclared by the promoter
Metro, operationalabout 1.5 kmSilk Institute
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion2%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Receivable, sold flats₹49.73 CrAs of Q2 2026-27
Cost left₹943.63 CrAs of Q2 2026-27
Sold12 / 1,023As of Q2 2026-27
Sold in Q2 2026-2712✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanICICI BANK LTD · ₹400.00 Cr disbursedAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
ICICI BANK LTD · ₹400.00 Cr disbursed
Building plan (BBMP)
Sanctioned 6 Feb 2026
Escrow bank
YES BANK · KASTURBA ROAD, BANGALORE
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
153 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aparna Wonderwoods in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 6 Feb 2026 · No. PRJ/3010/25-26
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/339/2024 · issued 22 Nov 2024 · building height 90.45 m (BLOCK-A, BLOCK-B), 87.45 m (BLOCK C), 93.45 m (BLOCK D, BLOCK E)
✓Clear
Environmental clearance
SEIAA 135 CON 2024 · EC identification no. EC24B3813KA5704519N · issued 13 Mar 2025
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-350629 · issued 19 Sep 2025 · valid until 8 Jul 2035
✓Clear
Water and sewerage NOC (BWSSB)
issued 7 May 2025
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
5 Feb 2031
Registration certificates
PRM/KA/RERA/1251/310/PR/080626/008706
Land use
Conversion order
Land conversion
2 of 2 parcels converted
Sy 19/3
Converted 5 Apr 2023 · DC Bengaluru
Sy 19/4
Converted 11 May 2015 · DC Bengaluru
Survey numbers
19/3 · 19/4
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 120 m² 26.4%3BHK+2toilet+p.room · avg 105 m² 18.6%2BHK+study · avg 97 m² 18.4%2BHK · avg 86 m² 14.1%3 other types 22.5%
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
BMICAPA planning area (NICE corridor), over the filed survey numbers
Nearest government-flagged flood location
about 2 km, Mantri Lake view Appartment Next to Talagattapura Lake
Government land in the filed surveys
Not found
Flooding
Site vs nearest drain
Nearest storm drain
about 0.5 km, tertiary drain
Nearest lake, tank or pond
about 0.5 km, an unnamed pond
Drains, lakes and flood locations around the filed pin
Amenities
Specification and Form 5
Amenities declared
Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation
Club House, built
0%
Electricity, built
0%
Outdoor Sports facility, built
0%
Swimming Pool, built
0%
Parks, built
0%
Piped Gas, built
0%
Covered parking per unit
1.15 (1,445 covered spaces for 1,261 units)
Power backup
Declared by the promoter
Around it
Water
Groundwater, Bengaluru South taluk average
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant, Nearest city water main, Ground level.
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
Not started · planned by 2 Sep 2029
Electrical and plumbing finishing
Not started · planned by 25 Sep 2030
Club house
Not started
Completion
2%
Completion, accountant
18.5% of the estimated cost spent
Dates
Dates
Filed dates
Schedule end
25 Oct 2030
RERA completion date
5 Feb 2031
Work began, as filed
6 Feb 2026
Specified structure
What the promoter specified · not an inspection
Building heights, fire NOC
90.45 m (BLOCK-A, BLOCK-B), 87.45 m (BLOCK C), 93.45 m (BLOCK D, BLOCK E) on the fire NOC · filed: BLOCK-A 90.45 m, BLOCK-B 90.45 m, BLOCK C 87.45 m, BLOCK D 93.45 m, BLOCK E 93.45 m
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹154.20 Cr 13.3%Development · ₹1003.00 Cr 86.7%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹1157.20 Cr
Cost incurred
₹213.57 Cr (18.5% of the estimate)
Cost left
₹943.63 Cr
Receivable, sold flats
₹49.73 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (12) 1.2%Unsold (1,011) 98.8%
Sold per quarter
K-RERA inventory
Sold, Q1 2026-27
0 / 1,261 · 1,261 available
Sold, Q2 2026-27
12 / 1,023 · 1,011 available
Unsold, Q2 2026-27
1,011
Sold in Q2 2026-27
12
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
YES BANK · KASTURBA ROAD, BANGALORE
Designated account, collected
₹1.93 Cr in Q2 2026-27
Designated account, withdrawn
₹1.93 Cr in Q2 2026-27 (100% of that quarter's deposits)
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot