Overview
Aratt Avant Twilight - Phase I
Part ofAratt Avant Twilight2 phases, 255 flats
Overview
Aratt Avant Twilight - Phase I
Part ofAratt Avant Twilight2 phases, 255 flats
Overview
Aratt Avant Twilight - Phase I
Part ofAratt Avant Twilight2 phases, 255 flats
Overview
Part ofAratt Avant Twilight2 phases, 255 flats

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC · Survey 59/2
K-RERA filing, land schedule
Approvals
| Building plan (BMRDA) | Sanctioned 25 May 2023 · No. CC/115/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Residential Apartments · avg 80 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | ICICI bank · ₹14.00 Cr disbursed | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 25 May 2023 | |
| Escrow bank | ICICI Bank · ULSOOR ROAD |
Data room
145 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | 1 | Review |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aratt Avant Twilight - Phase I in the interactive atlas
Transfer of the land
Sale deed
in favour of Arattukulam Infrastructure Constructions Private Limited · Survey 59/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Manduru Grama Panchayat · Survey 59/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan CC/115/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/301223/006522
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | ICICI bank · ₹14.00 Cr disbursed |
|---|
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 51,866 sq m | |
| Extent the filed land schedule names for these survey numbers | 5,261 sq m | |
| Plot area against the filed extent | 9.86 times | |
| Land area filed with K-RERA | 5,261 sq m | |
| Village, hobli and taluk on the KGIS map | J.I.Huskuru, BIDARAHALLI1 hobli, BANGALORE-EAST taluk | |
| Sy. 59/2: filed extent, KGIS plot | 5,261 sq m, 51,866 sq m |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 59/2 | |
|---|---|---|
| Land extent, Sy 59/2 | 01 Acre 12 Guntas | |
| Whole survey numbers on the KGIS map | 51,866 sq m (the project holds a share) | |
| Land area of this registration | 5,261 sq m | |
| Khata | E Khatha · Manduru Grama Panchayat · 1 Apr 2023 | |
| Sale deed | Dated 10 Nov 2022 | |
| Sale deed in favour of | Arattukulam Infrastructure Constructions Private Limited |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 59/2 | 3 | 3 acres 36 guntas | 1 acre 12 guntas | 12 acres 33 guntas | Differs: 11 acres 21 guntas apart | Not read yet |
| SEIAA |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jan 2028 |
| Land conversion | Converted 13 Sep 2022 · DC | |
|---|---|---|
| Survey numbers | 59/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential Apartments | 93 | 858 |
| Sold, Q2 2026-27 | 76 / 93 | |
|---|---|---|
| Unsold, Q2 2026-27 | 17 | |
| Months to sell, derived from filed bookings | 6 months |
| Godrej Woodscapes | about 1.5 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 1.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | Locked | |
| Neighbourhood Tree Park | about 2 km | Locked | |
| Chaithanya Sankhya | about 2.5 km | Locked | |
| Definer Upper Deck | about 3 km | Locked | |
| Godrej Parkshire (Hoskote) | about 3.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 4 km | Locked | |
| Riqueza Siri | about 5 km | Locked | |
| Sowparnika Euphoria in the East | about 5 km | Locked |
| Aratt Avant Twilight - Phase I This project | This project is the point the others are measured from | 31 Jan 2028 | 82% (76 of 93) | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 1.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 1.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 81% Residential (main), 11% Agriculture, 8% Transport & communication, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 6 km, TRIVENI NAGAR NEAR KR PURAM | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.00 (93 covered spaces for 93 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it

| Main structure | 95% · planned by 31 Jan 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2027 | |
| Club house | Not started | |
| Completion | 89% |
| Schedule end | 31 Dec 2027 | |
|---|---|---|
| RERA completion date | 31 Jan 2028 | |
| Work began, as filed | 1 Feb 2024 |
| Building heights, fire NOC | 30 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.47 Cr 12.3%Development · ₹46.04 Cr 87.7%
| Estimated cost, at registration | ₹52.51 Cr | |
|---|---|---|
| Cost left | ₹13.80 Cr |
Sold (76) 81.7%Unsold (17) 18.3%
| Sold, Q3 2025-26 | 50 / 93 · 43 available | |
|---|---|---|
| Sold, Q4 2025-26 | 53 / 93 · 40 available | |
| Sold, Q1 2026-27 | 66 / 93 · 27 available | |
| Sold, Q2 2026-27 | 76 / 93 · 17 available | |
| Unsold, Q2 2026-27 | 17 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 13 | |
| Sold in Q2 2026-27 | 10 | |
| Flats booked, Form 4 Q2 2026-27 | 76 |
| Escrow bank | ICICI Bank · ULSOOR ROAD | |
|---|---|---|
| Designated account, collected | ₹9.26 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.68 Cr in Q2 2026-27 (72% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹6,44,13,923 | |
| Escrow account, Q4 2025-26 | Opened at ₹65.8 L, ₹3.36 Cr deposited from sales, ₹33,762 other deposits, ₹4.02 Cr withdrawn | |
| Share of collections deposited in escrow | 100% |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| One Residences At Sobha One World Ph4 W7 And 8 |
|---|
| about 2 km |
| 30 Sep 2033 |
| 22% (98 of 440) |
| Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Neighbourhood Tree Park | about 2 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
|---|
| Projects within 4 km, counted | 49 (49 with an approximate location) | |
|---|---|---|
| Flats in them | 17,246 | |
| Booked | 8,844 of 17,246 (51%) | |
| Unsold | 8,402 | |
| Booked a month, pooled | 282 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority (Manduru Grama Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | about 11 km, Saraswathi Nagar |
| Kempegowda Airport | 26.5 | 16.5 |
| MG Road (CBD) | 23 | 19.5 |
| Manyata Tech Park | 22.5 | 15 |
| ITPL, Whitefield | 12 | 8.5 |
| Ecospace, Bellandur ORR | 22.5 | 17 |
| Electronic City Ph 1 | 38 | 26 |
| Landfill or waste transfer station | about 2.5 km to the west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south, named Kondaspura on OpenStreetMap |