Well maintained layout and could reach easily with magadi peripheral ring road.
Overview
Arohana Serenity
Overview
Arohana Serenity
Overview
Arohana Serenity
Overview
Photo: Photos are copyrighted by their ownersTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 1 | ||||
| 1/3 | ||||
Approvals
| Building plan (BDA) | Sanctioned 28 Aug 2023 · No. BDA/TPM/PRL-54/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 4 Oct 2024 | |
| Building plan (BDA) | Sanctioned 28 Aug 2023 | |
| Escrow bank | IDFC FIRST BANK · FRAZER TOWN BRANCH BANGALORE |
Data room
185 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Well maintained layout and could reach easily with magadi peripheral ring road.
Arohana Serenity is a Gated community. Very well planned layout with various configuration of sizes of the sites. All the sites are designed as per the vastu. On top of it Very nice and humble owners of the property. Good to have a house in…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Byraveshwara LayoutLapsed · completion date passed | Channappa and Puttalakshmamma | Plot | ~800–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| DS Max SamyakActive · 100% built | DS-Max Properties | Apartment | 761–1,078 sqft | Jan 2028 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
| Ds Max Star NestCompleted · OC 04-04-2020 | K V SATISH | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Arohana Serenity in the interactive atlas
| 22 Feb 2023District Commissioner, Bangalore |
| 22 Sep 2005 |
| 22 Feb 2023A Khatha · BDA |
| 24 Guntas |
| 1/4 | 22 Feb 2023District Commissioner, Bangalore, | 11 Jan 2007 | 22 Feb 2022A Khatha · BDA | 10 Gunta |
|---|
| Survey 3 | ||||
|---|---|---|---|---|
| 3/1 | 21 Apr 2022District Commissioner, Bangalore | 21 Jul 2018 | 21 Apr 2022A Khatha · BDA | 12 Gunta |
| 3/2 | 21 Apr 2022District Commissioner, Bangalore, | 11 Jan 2007 | 21 Apr 2022A Khatha · BDA | 13 Guntas |
| 3/3 | 21 Apr 2022District Commissioner | 1 Feb 2022 | 21 Apr 2022A Khatha · BDA | 13 Guntas |
| Survey 4 | ||||
|---|---|---|---|---|
| 4/1 | 21 Apr 2022District Commissioner Bangalore | 25 May 2005 | 21 Apr 2022A Khatha · BDA | 19 Guntas |
| 4/2 | 21 Feb 2023DC | 7 Jun 2022 | 21 Feb 2022A Khatha · BDA | 1 Acre |
| 4/3 | 21 Apr 2022DC | 25 May 2005 | 21 Apr 2022A Khatha · BDA | 1 Acre 5 Guntas |
| 4/4 | 21 Apr 2022DC | 21 Apr 2022 | 21 Apr 2022A Khatha · BDA | 1 Acre 20 Guntas |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed registered
No. KEN-1-05662-2005-06 · Book 1 · executed 25 May 2005 · ಮಾಳಿಗೊಂಡನಹಳ್ಳಿ village, ಕೆಂಗೇರಿ hobli
Title deed filed with K-RERA, pp. 1, 8 · See it in Documents
Transfer of the land
Title deed registered
No. KEN-1-05670-2005-06 · Book 1 · executed 25 May 2005
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Title deed executed
ಮಾಳಿಗೊಂಡನಹಳ್ಳಿ village, ಕೆಂಗೇರಿ hobli
Title deed filed with K-RERA, p. 1 · See it in Documents
Transfer of the land
Title deed registered
No. TVR-1-01785-2018-19 · Book 1
Title deed filed with K-RERA, p. 9 · See it in Documents
Transfer of the land
Title deed registered
No. TVR-1-05713-2021-22 · Book 1 · executed 27 Jan 2022
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Title deed registered
No. TVR-1-01114-2022-23 · Book 1 · executed 7 Jun 2022 · ಮಾಳಿಗೊಂಡನಹಳ್ಳಿ village
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-54/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/051024/007128
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 4 Oct 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 7 of the encumbrance certificate. Filed with K-RERA: EC 1-3, 7 pages.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 48,094 sq m | |
| Extent the filed land schedule names for these survey numbers | 23,876 sq m | |
| Plot area against the filed extent | 2.01 times | |
| Village, hobli and taluk on the KGIS map | K.G.Maligondanahalli, Kengeri-2 hobli, Bangalore-South taluk | |
| Mutation entry | None open on 9 of 9 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 1/3, 1/4, 3/1, 3/2, 3/3, 4/1 and 3 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 48,094 sq m (the project holds a share) | |
| Khata | A Khatha · BDA · 22 Feb 2023; A Khatha · BDA · 22 Feb 2022; A Khatha · BDA · 21 Apr 2022; and 1 more | |
| Sale deed | Dated 25 May 2005, 22 Sep 2005, 11 Jan 2007 and 4 more | |
| Title deed | No. KEN-1-14414-2005-06 · Book 1 |
| Sy. No. 1/3 | 1 | 22 guntas | 0 | ||||
| Sy. No. 1/4 | 1 | 9 guntas | 0 | ||||
| Sy. No. 3/1 | 1 | 12 guntas |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 19 Aug 2025 |
| Land conversion | 9 of 9 parcels converted | |
|---|---|---|
| Sy 1/3 | Converted 22 Feb 2023 · District Commissioner, Bangalore | |
| Sy 1/4 | Converted 22 Feb 2023 · District Commissioner, Bangalore, | |
| Sy 3/1 | Converted 21 Apr 2022 · District Commissioner, Bangalore | |
| Sy 3/2 | Converted 21 Apr 2022 · District Commissioner, Bangalore, | |
| Sy 3/3 | Converted 21 Apr 2022 · District Commissioner | |
| Sy 4/1 | Converted 21 Apr 2022 · District Commissioner Bangalore | |
| Other parcels | 2 more groups on the filing | |
| Survey numbers | 1/3 · 1/4 · 3/1 · 3/2 · 3/3 · 4/1 · 4/2 · 4-3 · 4-4 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 600 | |
| Booked | 210 of 600 (35%) | |
| Unsold | 390 | |
| Booked a month, pooled | 4 plots | |
| Months to sell, pooled | 95 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 94% Agriculture, 6% Residential (mixed), over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7.5 km, Kengeri Yellamma temple | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| RERA completion date | 19 Aug 2025 | |
| Work began, as filed | 20 Apr 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹47.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹6.67 Cr | |
| Estimated cost, chartered accountant's certificate | ₹47.50 Cr, same as the filing |
| Escrow bank | IDFC FIRST BANK · FRAZER TOWN BRANCH BANGALORE |
|---|
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 119 (85 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 3/2 | 1 | 13 guntas | 0 |
| Sy. No. 3/3 | 1 | 13 guntas | 0 |
| Sy. No. 4/1 | 1 | 19 guntas | 0 |
| Sy. No. 4/2 | 4 | 1 acre | 0 |
| Sy. No. 4/3 | Not read yet | 0 |
| Sy. No. 4/4 | Not read yet | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 5.5 km, Challaghatta | |
| Metro, under construction | about 20 km, Hulimavu |
| Kempegowda Airport | 62.5 | 44.5 |
| MG Road (CBD) | 26.5 | 21 |
| Manyata Tech Park | 40 | 26 |
| ITPL, Whitefield | 43.5 | 35.5 |
| Ecospace, Bellandur ORR | 43 | 28.5 |
| Electronic City Ph 1 | 40 | 29.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |