Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 3 Mar 2021 · No. BDA/NYS/PRL-05/2018-19/1619/2020-21 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹12.25 Cr 85.1%Development · ₹2.14 Cr 14.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 16 Feb 2024 | Review |
| Building plan (BDA) | Sanctioned 3 Mar 2021 | |
| Escrow bank | Industrial Development Bank of India · Basavanagudi |
Data room
161 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Arohana SerenityCompleted (regulator flag) | Nagaraja B | Plot | ~570–1,790 sqft (estimate: filed carpet plus 25%) | Completed |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| DS Max SamyakActive · 100% built | DS-Max Properties | Apartment | 761–1,078 sqft | Jan 2028 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
| Ds Max Star NestCompleted · OC 04-04-2020 | K V SATISH | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Byraveshwara Layout in the interactive atlas
Transfer of the land
Title deed registered
No. KEN-1-05215-2006-07 · Book 1 · executed 11 May 2006
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Title deed registered
No. KEN-1-05215-2006-07 · Book 1 · executed 11 May 2006
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Sale deed
Survey 4/1, 4/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 4/1, 4/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. KEN-1-03443-2010-11 · Book 1 · executed 22 Nov 2010
Title deed filed with K-RERA, pp. 1, 8 · See it in Documents
Approval or registration
Land use converted
DC Office Bengaluru · Survey 4/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 4/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NYS/PRL-05/2018-19/1619/2020-21
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Survey 4/1, 4/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 4/1, 4/2
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/131224/007285
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 16 Feb 2024 |
|---|
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 4/1, 4/2 | |
|---|---|---|
| Land extent, Sy 4/1 | 1 Acre 30.5 Guntas | |
| Land extent, Sy 4/2 | 1 Acre 32 Guntas | |
| Khata | E Khatha · 20 Feb 2024 | |
| Sale deed | Dated 12 May 2006 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 4/1 | Converted 14 Dec 2015 · DC Office Bengaluru | |
| Sy 4/2 | Converted 18 Dec 2015 · DC Office Bengaluru | |
| Survey numbers | 4/1 · 4/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 2 (2 with an approximate location) | |
|---|---|---|
| Plots in them | 639 | |
| Booked | 463 of 639 (72%) | |
| Unsold | 176 | |
| Booked a month, pooled | 20 plots | |
| Months to sell, pooled | 9 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 4 km, Sonnenahalli Bridge Upstream Gollarahatti |
|---|
| Nearest storm drain | about 2 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 5 Jan 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 8 Feb 2024 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 10 Feb 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹14.39 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹1.70 Cr |
| Escrow bank | Industrial Development Bank of India · Basavanagudi |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Sulikere Village Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, Kengeri | |
| Metro, under construction | about 16.5 km, Tavarekere |
| Kempegowda Airport | 56.5 | 39.5 |
| MG Road (CBD) | 25.5 | 17 |
| Manyata Tech Park | 34 | 21.5 |
| ITPL, Whitefield | 42.5 | 31.5 |
| Ecospace, Bellandur ORR | 40 | 25.5 |
| Electronic City Ph 1 | 36.5 | 27.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named STP-3 on OpenStreetMap | |
| Quarry | about 2.5 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |